Acquisition Program Baseline
in the United States military
Q4674780Snapshot
≈ 1 min read
Names in other languages
- EnglishAcquisition Program Baseline
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
Acquisition Program Baseline (APB) is a term used by the United States Department of Defense to refer to a program threshold and objective values for the minimum number of cost, schedule, and performance attributes that describe the program over its life cycle. The APB initially was developed by the PM for the Milestone B decisions and contains parameters for the program such as key cost, schedule, and performance goals.[1]
References
edit edit source- ^ Cochrane, C. B. (July 2004). Joint program management handbook. Fort Belvoir, Washington: DIANE Publishing. p. 20. ISBN 0-16-073130-5. Wikipedia revision 1146742211, retrieved 2026-11-19
External links
edit edit sourceText derived from https://en.wikipedia.org/w/index.php?oldid=1146742211 under CC BY-SA 4.0; modifications have been made.