Lesson plan

Adams Plating

Adams Plating, also known as Adam's Plating, is a Superfund site in Lansing Charter Township near Lansing, Michigan. Prior to 1964, a dry cleaning business was located at the site, and stored dry cleaning fluid there in an underground storage tank, which was removed in the 1950s. Electroplating operations involving the use of chrome and various metals began in 1964, following a change in ownership. Prior to 1980, these operations contaminated the soil and groundwater at the site, most notably with chromium, along with copper, nickel, and zinc (in both soil and groundwater) and arsenic (in the soil alone). In July 1980, green-colored chromium-tainted water was found to be leaking into the basement of a residence near the site. Following investigations at the site from 1980 to 1993, an initial cleanup was completed in 1994. The cleanup began upon completion of a remedial investigation report in March 1993 and was substantially complete by September 1994, an expedited time frame made possible in part by the absence of lead at the site, and by the absence of potentially responsible parties as designated by the Superfund law. Five-year reviews of the site have since been undertaken by the Environmental Protection Agency (EPA).…

Back to article

Article summary

Adams Plating, also known as Adam's Plating, is a Superfund site in Lansing Charter Township near Lansing, Michigan. Prior to 1964, a dry cleaning business was located at the site, and stored dry cleaning fluid there in an underground storage tank, which was removed in the 1950s. Electroplating operations involving the use of chrome and various metals began in 1964, following a change in ownership. Prior to 1980, these operations contaminated the soil and groundwater at the site, most notably with chromium, along with copper, nickel, and zinc (in both soil and groundwater) and arsenic (in the soil alone). In July 1980, green-colored chromium-tainted water was found to be leaking into the basement of a residence near the site. Following investigations at the site from 1980 to 1993, an initial cleanup was completed in 1994. The cleanup began upon completion of a remedial investigation report in March 1993 and was substantially complete by September 1994, an expedited time frame made possible in part by the absence of lead at the site, and by the absence of potentially responsible parties as designated by the Superfund law. Five-year reviews of the site have since been undertaken by the Environmental Protection Agency (EPA).…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.