Lesson plan

Afsluitdijk

(a part of the North Sea) on the left and the IJsselmeer on the right The Afsluitdijk ( ; ; "closure dyke" ) is a major dam and causeway in the Netherlands. It was constructed between 1927 and 1932 and runs from Den Oever in North Holland province to the village of Zurich in Friesland province, over a length of and a width of , at an initial height above Amsterdam Ordnance Datum of between along the section at Friesland, and where it crosses the deep channel of the Vlieter. The height at the greater sea depths west of Friesland was required to be a minimum of 7 metres everywhere when originally constructed. Increases to the height of the Afsluitdijk have been made several times since 1958 as part of regular maintenance since the deadly North Sea Flood of 1953. The section between the and sluice complexes was raised to 7.8 metres. Major upgrade works commenced in 2019, with one of the design conditions being that only limited wave overtopping during the design storm condition be permitted. The design proposed by the successful contractor to meet this criterion will see a further increase in the height of the dam, by approximately 2 metres. The Afsluitdijk is a fundamental part of the larger Zuiderzee Works, damming off the Zuiderzee, a salt water inlet of the North Sea, and turning it into the fresh water lake of the IJsselmeer.…

Back to article

Article summary

(a part of the North Sea) on the left and the IJsselmeer on the right The Afsluitdijk ( ; ; "closure dyke" ) is a major dam and causeway in the Netherlands. It was constructed between 1927 and 1932 and runs from Den Oever in North Holland province to the village of Zurich in Friesland province, over a length of and a width of , at an initial height above Amsterdam Ordnance Datum of between along the section at Friesland, and where it crosses the deep channel of the Vlieter. The height at the greater sea depths west of Friesland was required to be a minimum of 7 metres everywhere when originally constructed. Increases to the height of the Afsluitdijk have been made several times since 1958 as part of regular maintenance since the deadly North Sea Flood of 1953. The section between the and sluice complexes was raised to 7.8 metres. Major upgrade works commenced in 2019, with one of the design conditions being that only limited wave overtopping during the design storm condition be permitted. The design proposed by the successful contractor to meet this criterion will see a further increase in the height of the dam, by approximately 2 metres. The Afsluitdijk is a fundamental part of the larger Zuiderzee Works, damming off the Zuiderzee, a salt water inlet of the North Sea, and turning it into the fresh water lake of the IJsselmeer.…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.