The AP1000 (Advanced Passive 1000) is a nuclear power plant designed and sold by Westinghouse Electric Company. The plant is a pressurized water reactor with improved use of passive nuclear safety and many design features intended to lower its capital cost and improve its economics. The design traces its history to the Westinghouse 4-loop SNUPPS design, which was produced in various locations around the world. (Note: System 80 was a similar vintage nuclear steam supply system made by Combustion Engineering.) Further development of the 4-loop reactor and the passively cooled containment initially led to the AP600 concept, with a smaller 600 to 700 MWe output, but this saw limited interest. In order to compete with other designs that were scaling up in size in order to improve capital costs, the design re-emerged as the AP1000 and found a number of design wins at this larger size. Seventeen AP1000s are currently in operation or under construction. Four are in operation at two sites in China, two at Sanmen Nuclear Power Station and two at Haiyang Nuclear Power Plant. , all four Chinese reactors were completed and connected to the grid, and , eleven more are under construction. Two are in operation at the Vogtle Electric Generating Plant near Augusta, Georgia, in the United States, with Vogtle 3 having come online in July 2023, and Vogtle 4 in April 2024.…

The AP1000 (Advanced Passive 1000) is a nuclear power plant designed and sold by Westinghouse Electric Company. The plant is a pressurized water reactor with improved use of passive nuclear safety and many design features intended to lower its capital cost and improve its economics. The design traces its history to the Westinghouse 4-loop SNUPPS design, which was produced in various locations around the world. (Note: System 80 was a similar vintage nuclear steam supply system made by Combustion Engineering.) Further development of the 4-loop reactor and the passively cooled containment initially led to the AP600 concept, with a smaller 600 to 700 MWe output, but this saw limited interest. In order to compete with other designs that were scaling up in size in order to improve capital costs, the design re-emerged as the AP1000 and found a number of design wins at this larger size. Seventeen AP1000s are currently in operation or under construction. Four are in operation at two sites in China, two at Sanmen Nuclear Power Station and two at Haiyang Nuclear Power Plant. , all four Chinese reactors were completed and connected to the grid, and , eleven more are under construction. Two are in operation at the Vogtle Electric Generating Plant near Augusta, Georgia, in the United States, with Vogtle 3 having come online in July 2023, and Vogtle 4 in April 2024. Construction at Vogtle suffered numerous delays and cost overruns. Construction of two additional reactors at Virgil C. Summer Nuclear Generating Station near Columbia, South Carolina, led to Westinghouse's bankruptcy in 2017 and the cancellation of construction at that site. It was reported in January 2025 by The Wall Street Journal and The State that Santee Cooper, the sole owner of the stored parts and unfinished construction, is exploring construction and financing partners to finish construction these two reactors. The need for large amounts of electricity for data centers is said to be the driving factor for their renewed interest. Twenty-four more AP1000s are currently being planned, with six in India, nine in Ukraine, three in Poland, two in Bulgaria, and four in the United States. China is currently developing more advanced versions and owns their patent rights. The first AP1000 began operations in China at Sanmen, where Unit 1 became the first AP1000 to achieve criticality in June 2018, and was connected to the grid the next month. Further builds in China will be based on the modified CAP1000 and CAP1400 designs.

Previous work

The AP1000 design traces its history to two previous designs, the AP600 and the System 80. The System 80 design was created by Combustion Engineering and featured a two-loop cooling system with a single steam generator paired with two reactor coolant pumps in each loop that makes it simpler and less expensive than systems which pair a single reactor coolant pump with a steam generator in each of two, three, or four loops. Three completed reactors in the US and another four in South Korea made it the most successful Generation II+ design. ABB Group bought Combustion Engineering in 1990 and introduced the System 80+, with a number of design changes and safety improvements. As part of a series of mergers, purchases, and divestitures by ABB, in 2000 the design was purchased by Westinghouse Electric Company, who had itself been purchased in 1999 by British Nuclear Fuels Ltd (BNFL). Through the 1990s, Westinghouse had been working on a new design known as the AP600 with a design power of about 600 MWe. This was part of the United States Department of Energy's Advanced Light Water Reactor program that worked on a series of Generation III reactor designs. In contrast to Generation II designs, the AP600 was much simpler, with a huge reduction in the total number of parts, and especially pumps. It was also passively safe, a key feature of Gen III designs. The AP600 was at the small end of the reactor scale. Smaller plants are periodically introduced because they can be used in a wider variety of markets where a larger reactor is simply too powerful to serve the local market. The downside of such designs is that the construction time, and thus cost, does not differ significantly compared to larger designs, so these smaller designs often have less attractive economics. The AP600 addressed this through modular construction and aimed to go from first concrete to fuel load in 36 months. In spite of these attractive features, Westinghouse had no sales of the AP600. With the purchase of the company by BNFL and its merger with ABB, a design combining the features of the System 80+ with the AP600 started as the AP1000. BNFL in turn sold Westinghouse Electric to Toshiba in 2005.

AP1000

In December 2005, the Nuclear Regulatory Commission (NRC) approved the final design certification for the AP1000. This meant that prospective US builders could apply for a Combined Construction and Operating License before construction starts, the validity of which is conditional upon the plant being built as designed, and that each AP1000 should be identical. Its design is the first Generation III+ reactor to receive final design approval from the NRC. In 2008 China started building four units of the AP1000's 2005-design. In December 2011, the NRC approved construction of the first US plant to use the design. On February 9, 2012, the NRC approved the construction of two new reactors. In 2016 and 2017 cost overruns constructing AP1000 plants in the U.S. caused Westinghouse's owner Toshiba to write down its investment in Westinghouse by "several billion" dollars. On February 14, 2017, Toshiba delayed filing financial results, and Toshiba chairman Shigenori Shiga, formerly chairman of Westinghouse, resigned. On March 24, 2017, Toshiba announced that Westinghouse Electric Company will file for Chapter 11 bankruptcy because of US$9 billion of losses from nuclear reactor construction projects, which may impact the future of the AP1000. Westinghouse emerged from bankruptcy in August 2018.

Chinese design extensions

In 2008 and 2009, Westinghouse made agreements to work with the Chinese State Nuclear Power Technology Corporation (SNPTC) and other institutes to develop a larger design, the CAP1400 of 1,500 MW e capacity, possibly followed by a 1,700 MW e design. China will own the patent rights for these larger designs. Exporting the new larger units may be possible with Westinghouse's cooperation. In September 2014, the Chinese nuclear regulator approved the design safety analysis following a 17-month review. In May 2015 the CAP1400 design passed an International Atomic Energy Agency's Generic Reactor Safety Review. In December 2009, a Chinese joint venture was set up to build an initial CAP1400 near the HTR-PM at Shidao Bay Nuclear Power Plant. In 2015, site preparation started, and approval to progress was expected by the end of the year. In March 2017, the first CAP1400 reactor pressure vessel passed pressure tests. Equipment for the CAP1400 is being manufactured, and as of 2020 preliminary construction is underway. In February 2019, the Shanghai Nuclear Engineering Research & Design Institute announced that it had begun the conceptual design process for the CAP1700. In 2016, the Minister of Energy and Natural Resources of the Republic of Turkey, Berat Albayrak, inspected the AP 1000 Shandong Haiyang Nuclear Power Plant, which belongs to the China National State Nuclear Technology Corporation (SNPTC), a subsidiary of the China State Electricity Investment Corporation (SPIC).

India

In June 2016, the US and India agreed to build six AP1000 reactors in India as part of civil nuclear deal signed by both countries. Westinghouse's parent company Toshiba decided in 2017 to withdraw from the construction of nuclear power plants, following financial difficulties, leaving the proposed agreement in doubt. During a visit to India in February 2020 by U.S. President Donald Trump, Westinghouse was expected to sign a new agreement with state-run Nuclear Power Corporation of India for the supply of six nuclear reactors. However, because of disagreements over liability and layout, this did not take place.

Operations

In March 2019, Sanmen Unit 2 was shut down because of a reactor coolant pump defect. A replacement pump has been shipped from the U.S. by Curtiss-Wright. There have been previous problems with these pumps, with several pumps returned from China. The pumps are the largest hermetically sealed pumps used in a nuclear reactor. Westinghouse and Curtiss-Wright are in a financial dispute over responsibility for the costs of pump delivery delays.

See also

Nuclear safety in the United States Nuclear power in the United States Nuclear power in China Nuclear power in the United Kingdom Nuclear power in Bulgaria Economics of nuclear power plants Nuclear Power 2010 Program

Notes

References

External links

(Westinghouse AP1000 brochure). [https://web.archive.org/web/20080314035319/http://ap1000.westinghousenuclear.com/index.html The AP1000 advanced 1000 MWe nuclear power plant AP1000 design review documents Revision 14. Fairewinds Associates Presentation AP1000 - extra risk of containment failure

Text derived from https://en.wikipedia.org/w/index.php?oldid=1374515424 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

30 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.