Apollo 17 (December 7–19, 1972) was the eleventh and final crewed mission of NASA's Apollo program, the sixth and most recent time humans have set foot on the Moon. Commander Gene Cernan and Lunar Module Pilot Harrison Schmitt walked on the Moon, while Command Module Pilot Ronald Evans orbited above. Schmitt was the only professional geologist to land on the Moon; he was selected in place of Joe Engle, as NASA had been under pressure to send a scientist to the Moon. The mission's heavy emphasis on science meant the inclusion of a number of new experiments, including a biological experiment containing five mice that stayed in orbit with Evans. Mission planners had two primary goals in deciding on the landing site: to sample lunar highland material older than that at Mare Imbrium and to investigate the possibility of relatively recent volcanic activity. They therefore selected Taurus–Littrow, where formations that had been viewed and pictured from lunar orbit were thought to be volcanic in nature. Since all three crew members had backed up previous Apollo lunar missions, they were familiar with the Apollo spacecraft and had more time for geology training. Launched at 12:33 a.m.…
Apollo 17 (December 7–19, 1972) was the eleventh and final crewed mission of NASA's Apollo program, the sixth and most recent time humans have set foot on the Moon. Commander Gene Cernan and Lunar Module Pilot Harrison Schmitt walked on the Moon, while Command Module Pilot Ronald Evans orbited above. Schmitt was the only professional geologist to land on the Moon; he was selected in place of Joe Engle, as NASA had been under pressure to send a scientist to the Moon. The mission's heavy emphasis on science meant the inclusion of a number of new experiments, including a biological experiment containing five mice that stayed in orbit with Evans. Mission planners had two primary goals in deciding on the landing site: to sample lunar highland material older than that at Mare Imbrium and to investigate the possibility of relatively recent volcanic activity. They therefore selected Taurus–Littrow, where formations that had been viewed and pictured from lunar orbit were thought to be volcanic in nature. Since all three crew members had backed up previous Apollo lunar missions, they were familiar with the Apollo spacecraft and had more time for geology training. Launched at 12:33 a.m. Eastern Standard Time (EST) on December 7, 1972, following the only launchpad delay in the Apollo program, which was caused by a hardware problem, Apollo 17 was a "J-type" mission that included three days on the lunar surface, expanded scientific capability, and the use of the third Lunar Roving Vehicle (LRV). Cernan and Schmitt landed in the Taurus–Littrow valley, completed three moonwalks, took lunar samples and deployed scientific instruments. Orange soil was discovered at Shorty crater; it proved to be volcanic in origin, although from early in the Moon's history. Evans remained in lunar orbit in the command and service module, taking scientific measurements and photographs. The spacecraft returned to Earth on December 19. It was the last human flight beyond low Earth orbit until the Artemis II lunar flyby in April 2026. The mission broke several records for crewed spaceflight, including the longest crewed lunar landing mission (12 days, 14 hours), greatest distance from a spacecraft during an extravehicular activity of any type (7.6 kilometers or 4.7 miles), longest time on the lunar surface (75 hours), longest total duration of lunar-surface extravehicular activities (22 hours, 4 minutes), largest lunar-sample return (approximately 115 kg or 254 lb), longest time in lunar orbit (6 days, 4 hours), and greatest number of lunar orbits (75).
Mission insignia and call signs
The insignia's most prominent feature is an image of the Greek sun god Apollo backdropped by a rendering of an American eagle, the red bars on the eagle mirroring those on the U.S. flag. Three white stars above the red bars represent the three crewmembers of the mission. The background includes the Moon, the planet Saturn, and a galaxy or nebula. The wing of the eagle partially overlays the Moon, suggesting humanity's established presence there. |alt=The Apollo seventeen emblem containing Apollo, an eagle made of lines, the Moon, and Saturn; around the outside of the emblem the text Apollo XVII, and then the names Cernan, Evans, and Schmitt. The insignia includes, along with the colors of the U.S. flag (red, white, and blue), the color gold, representative of a "golden age" of spaceflight that was to begin with Apollo 17. The image of Apollo in the mission insignia is a rendering of the Apollo Belvedere sculpture in the Vatican Museums. It looks forward into the future, towards the celestial objects shown in the insignia beyond the Moon. These represent humanity's goals, and the image symbolizes human intelligence, wisdom and ambition. The insignia was designed by artist Robert McCall, based on ideas from the crew. In deciding the call signs for the command module (CM) and Lunar Module (LM), the crew wished to pay tribute to the American public for their support of the Apollo program, and to the mission, and wanted names with a tradition within American history. The CM was given the call sign "America". According to Cernan, this evoked the 19th century sailing ships which were given that name, and was a thank-you to the people of the United States. The crew selected the name "Challenger" for the LM in lieu of an alternative, "Heritage". Cernan stated that the selected name "just seemed to describe more of what the future for America really held, and that was a challenge". After Schmitt stepped onto the Moon from Challenger, he stated, "I think the next generation ought to accept this as a challenge. Let's see them leave footprints like these." , in May 1972|alt=A photo of Gene Cernan standing on a rock with holding a stick while participating in geology training. As with previous lunar landings, the Apollo 17 astronauts undertook an extensive training program that included learning to collect samples on the surface, usage of the spacesuits, navigation in the Lunar Roving Vehicle, field geology training, survival training, splashdown and recovery training, and equipment training. The geology field trips were conducted as much as possible as if the astronauts were on the Moon: they would be provided with aerial images and maps, and briefed on features of the site and a suggested routing. The following day, they would follow the route, and have tasks and observations to be done at each of the stops. The geology field trips began with one to Big Bend National Park in Texas in October 1971. The early ones were not specifically tailored to prepare the astronauts for Taurus–Littrow, which was not selected until February 1972, but by June, the astronauts were going on field trips to sites specifically selected to prepare for Apollo 17's landing site. Both Cernan and Schmitt had served on backup crews for Apollo landing missions, and were familiar with many of the procedures. Their trainers, such as Gordon Swann, feared that Cernan would defer to Schmitt as a professional geologist on matters within his field. Cernan also had to adjust for the loss of Engle, with whom he had trained for Apollo 14. In spite of these issues, Cernan and Schmitt worked well together as a team, and Cernan became adept at describing what he was seeing on geology field trips, and working independently of Schmitt when necessary. The landing crew aimed for a division of labor so that, when they arrived in a new area, Cernan would perform tasks such as adjusting the antenna on the Lunar Roving Vehicle so as to transmit to Earth while Schmitt gave a report on the geological aspects of the site. The scientists in the geology "backroom" relied on Schmitt's reports to adjust the tasks planned for that site, which would be transmitted to the CapCom and then to Cernan and Schmitt. According to William R. Muehlberger, one of the scientists who trained the astronauts, "In effect [Schmitt] was running the mission from the Moon. But we set it up this way. All of those within the geological world certainly knew it, and I had a sneaking hunch that the top brass knew it too, but this is a practical way out, and they didn't object." Also participating in some of the geology field trips were the commander and lunar module pilot of the backup crew. The initial field trips took place before the Apollo 15 astronauts were assigned as the backup crew for Apollo 17 in February 1972. Either one or both of Scott and Irwin of Apollo 15 took part in four field trips, though both were present together for only two of them. After they were removed from the backup crew, the new backup commander and LMP, Young and Duke, took part in the final four field trips. On field trips, the backup crew would follow half an hour after the prime crew, performing identical tasks, and have their own simulated CapCom and Mission Control guiding them. The Apollo 17 astronauts had fourteen field trips—the Apollo 11 crew had only one. Evans did not go on the geology field trips, having his own set of trainers—by this time, geology training for the CMP was well-established. He would fly with a NASA geologist/pilot, Dick Laidley, over geologic features, with part of the exercise conducted at , and part at to . The higher altitude was equivalent to what could be seen from the planned lunar orbit of about 60 nmi with binoculars. Evans would be briefed for several hours before each exercise, and given study guides; afterwards, there would be debriefing and evaluation. Evans was trained in lunar geology by Farouk El-Baz late in the training cycle; this continued until close to launch. The CMP was given information regarding the lunar features he would overfly in the CSM and which he was expected to photograph.
Preparation and assembly
The first piece of the launch vehicle to arrive at Kennedy Space Center was the S-II second stage, on October 27, 1970; it was followed by the S-IVB on December 21; the S-IC first stage did not arrive until May 11, 1972, followed by the Instrument Unit on June 7. By then, LM-12 had arrived, the ascent stage on June 16, 1971, and the descent stage the following day; they were not mated until May 18, 1972. CM-114, SM-114 and SLA-21 all arrived on March 24, 1972. The rover reached Kennedy Space Center on June 2, 1972. , with the mockup Lunar Module in the background, August 1972|alt=Schmitt, (left), Cernan, (right) in a training LRV, with the Lunar Landing Module in the background. The CM and the service module (SM) were mated on March 28, 1972, and the testing of the spacecraft began that month. The CSM was placed in a vacuum chamber at Kennedy Space Center, and the testing was conducted under those conditions. The LM was also placed in a vacuum chamber; both the prime and the backup crews participated in testing the CSM and LM. During the testing, it was discovered that the LM's rendezvous radar assembly had received too much voltage during earlier tests; it was replaced by the manufacturer, Grumman. The LM's landing radar also malfunctioned intermittently and was also replaced. The front and rear steering motors of the Lunar Roving Vehicle (LRV) also had to be replaced, and it required several modifications. Following the July 1972 removal from the vacuum chamber, the LM's landing gear was installed, and it, the CSM and the SLA were mated to each other. The combined craft was moved into the Vehicle Assembly Building in August for further testing, after which it was mounted on the launch vehicle. After completing testing, including a simulated mission, the LRV was placed in the LM on August 13. Erection of the stages of the launch vehicle began on May 15, 1972, in High Bay 3 of the Vehicle Assembly Building, and was completed on June 27. Since the launch vehicles for Skylab 1 and Skylab 2 were being processed in that building at the same time, this marked the first time NASA had three launch vehicles there since the height of the Apollo program in 1969. After the spacecraft was mounted on the launch vehicle on August 24, it was rolled out to Pad 39-A on August 28. Although this was not the final time a Saturn V would fly (another would lift Skylab to orbit), area residents reacted as though it was, and 5,000 of them watched the rollout, during which the prime crew joined the operating crew from Bendix atop the crawler. At Pad 39-A, testing continued, and the CSM was electrically mated to the launch vehicle on October 11, 1972. Testing concluded with the countdown demonstration tests, accomplished on November 20 and 21. The countdown to launch began at 7:53 a.m. (12:53 UTC) on December 5, 1972.
Lunar surface science
. The Surface Electrical Properties (SEP) experiment receiver is the antenna on the right-rear of the vehicle|alt=Black and white photo of a lunar rover with a lunar landing module in the background. Like Apollo 15 and 16, Apollo 17 carried a Lunar Roving Vehicle. In addition to being used by the astronauts for transport from station to station on the mission's three moonwalks, the LRV was used to transport the astronauts' tools, communications equipment, and the lunar samples they gathered. The Apollo 17 LRV was also used to carry some of the scientific instruments, such as the Traverse Gravimeter Experiment (TGE) and Surface Electrical Properties (SEP) experiment. The Apollo 17 LRV traveled a cumulative distance of approximately in a total drive time of about four hours and twenty-six minutes; the greatest distance Cernan and Schmitt traveled from the lunar module was about . This was the only mission to carry the TGE, which was built by Draper Laboratory at the Massachusetts Institute of Technology. As gravimeters had been useful in studying the Earth's internal structure, the objective of this experiment was to do the same on the Moon. The gravimeter was used to obtain relative gravity measurements at the landing site in the immediate vicinity of the lunar module, as well as various locations on the mission's traverse routes. Scientists would then use this data to help determine the geological substructure of the landing site and the surrounding vicinity. Measurements were taken while the TGE was mounted on the LRV, and also while the device was placed on the lunar surface. A total of 26 measurements were taken with the TGE during the mission's three moonwalks, with productive results. The SEP was also unique to Apollo 17, and included two major components: a transmitting antenna deployed near the lunar module and a receiver mounted on the LRV. At different stops during the mission's traverses, electrical signals traveled from the transmitting device, through the ground, and were received at the LRV. The electrical properties of the lunar regolith could be determined by comparison of the transmitted and received electrical signals. The results of this experiment, which are consistent with lunar rock composition, show that there is almost no water in the area of the Moon in which Apollo 17 landed, to a depth of . A long, diameter device, the Lunar Neutron Probe was inserted into one of the holes drilled into the surface to collect core samples. It was designed to measure the quantity of neutrons which penetrated to the detectors it bore along its length. This was intended to measure the rate of the "gardening" process on the lunar surface, whereby the regolith on the surface is slowly mixed or buried due to micrometeorites and other events. Placed during the first EVA, it was retrieved during the third and final EVA. The astronauts brought it with them back to Earth, and the measurements from it were compared with the evidence of neutron flux in the core that had been removed from the hole it had been placed in. Results from the probe and from the cores were instrumental in current theories that the top centimeter of lunar regolith turns over every million years, whereas "gardening" to a depth of one meter takes about a billion years.
Orbital science
First EVA
During their approximately 75-hour stay on the lunar surface, Cernan and Schmitt performed three moonwalks (EVAs). The astronauts deployed the LRV, then emplaced the ALSEP and the seismic explosive charges. They drove the rover to nine planned geological-survey stations to collect samples and make observations. Additionally, twelve short sampling stops were made at Schmitt's discretion while riding the rover, during which the astronauts used a handled scoop to get a sample, without dismounting. During lunar-surface operations, Commander Cernan always drove the rover, while Lunar Module Pilot Schmitt was a passenger who assisted with navigation. This division of responsibilities between the two crew positions was used consistently throughout Apollo's J-missions. The first lunar excursion began four hours after landing, at 6:54 p.m. EST on December 11. After exiting through the hatch of the LM and descending the ladder to the footpad, Cernan took the first step on the lunar surface of the mission. Just before doing so, Cernan remarked, "I'm on the footpad. And, Houston, as I step off at the surface at Taurus–Littrow, we'd like to dedicate the first step of Apollo 17 to all those who made it possible." After Cernan surveyed the exterior of the LM and commented on the immediate landing site, Schmitt joined Cernan on the surface. The first task was to offload the rover and other equipment from the LM. While working near the rover, Cernan caught his hammer under the right-rear fender extension, accidentally breaking it off. A similar incident occurred on Apollo 16 as John Young maneuvered around the rover. Although this was not a mission-critical issue, the loss of the part caused Cernan and Schmitt to be covered with dust stirred up when the rover was in motion. The crew made a short-lived fix using duct tape at the beginning of the second EVA, attaching a paper map to the damaged fender. Lunar dust stuck to the tape's surface, however, preventing it from adhering properly. Following deployment and testing the maneuverability of the rover, the crew deployed the ALSEP just west of the landing site. The ALSEP deployment took longer than had been planned, with the drilling of core holes presenting some difficulty, meaning the geological portion of the first EVA would need to be shortened, cancelling a planned visit to Emory crater. Instead, following the deployment of the ALSEP, Cernan and Schmitt drove to Steno crater, to the south of the landing site. The objective at Steno was to sample the subsurface material excavated by the impact that formed the crater. The astronauts gathered of samples, took seven gravimeter measurements, and deployed two explosive packages. The explosive packages were later detonated remotely; the resulting explosions detected by geophones placed by the astronauts and also by seismometers left during previous missions. The first EVA ended after seven hours and twelve minutes. and the astronauts remained in the pressurized LM for the next 17 hours.
Second EVA
" On December 12, awakened by a recording of "Ride of the Valkyries" played from Mission Control, Cernan and Schmitt began their second lunar excursion. The first order of business was to provide the rover's fender a better fix. Overnight, the flight controllers devised a procedure communicated by John Young: taping together four stiff paper maps to form a "replacement fender extension" and then clamping it onto the fender. The astronauts carried out the new fix which did its job without failing until near the end of the third excursion. Cernan and Schmitt then departed for station 2—Nansen Crater, at the foot of the South Massif. When they arrived, their range from the Challenger was 7.6 kilometers (4.7 miles, 25,029 feet ). This remains the furthest distance any spacefarers have ever traveled away from the safety of a pressurizable spacecraft while on a planetary body, and also during an EVA of any type. The astronauts were at the extremity of their "walkback limit", a safety constraint meant to ensure that they could walk back to the LM if the rover failed. They began a return trip, traveling northeast in the rover. At station 3, Schmitt fell to the ground while working, looking so awkward that Parker jokingly told him that NASA's switchboard had lit up seeking Schmitt's services for Houston's ballet group, and the site of station 3 was in 2019 renamed Ballet Crater. Cernan took a sample at Station 3 that was to be maintained in vacuum until better analytical techniques became available, joking with the CAPCOM, Parker, about placing a note inside. The container remained unopened until 2022. Stopping at station 4—Shorty crater—the astronauts discovered orange soil, which proved to be very small beads of volcanic glass formed over 3.5 billion years ago. This discovery caused great excitement among the scientists at Mission Control, who felt that the astronauts may have discovered a volcanic vent. However, post-mission sample analysis revealed that Shorty is not a volcanic vent, but rather an impact crater. Analysis also found the orange soil to be a remnant of a lava fountain. This lava fountain sprayed molten lava high into the lunar sky in the Moon's early days, some 3.5 billion years ago and long before Shorty's creation. The orange volcanic beads were droplets of molten lava from the fountain that solidified and were buried by lava deposits until exposed by the impact that formed Shorty, less than 20 million years ago. The final stop before returning to the LM was Camelot crater; throughout the sojourn, the astronauts collected of samples, took another seven gravimeter measurements, and deployed three more explosive packages. Concluding the EVA at seven hours and thirty-seven minutes, Cernan and Schmitt had completed the longest-duration EVA in history to-date, traveling further away from a spacecraft and covering more ground on a planetary body during a single EVA than any other spacefarers. The improvised fender had remained intact throughout, causing the president of the "Auto Body Association of America" to award them honorary lifetime membership.
Third EVA
during EVA-3 The third moonwalk, the last of the Apollo program, began at 5:25 p.m. EST on December 13. Cernan and Schmitt rode the rover northeast of the landing site, exploring the base of the North Massif and the Sculptured Hills. Stopping at station 6, they examined a house-sized split boulder dubbed Tracy's Rock (or Split Rock), after Cernan's daughter. The ninth and final planned station was conducted at Van Serg crater. The crew collected of lunar samples and took another nine gravimeter measurements. Schmitt had seen a fine-grained rock, unusual for that vicinity, earlier in the mission and had stood it on its edge; before closing out the EVA, he went and got it. Subsequently, designated Sample 70215, it was, at , the largest rock brought back by Apollo 17. A small piece of it is on exhibit at the Smithsonian Institution, one of the few rocks from the Moon that the public may touch. Schmitt also collected a sample, designated as Sample 76535, at geology station 6 near the base of the North Massif; the sample, a troctolite, was later identified as the oldest known "unshocked" lunar rock, meaning it has not been damaged by high-impact geological events. Scientists have therefore used Sample 76535 in thermochronological studies to determine if the Moon formed a metallic core or, as study results suggest, a core dynamo. Before concluding the moonwalk, the crew collected a breccia rock, dedicating it to the nations of Earth, 70 of which were represented by students touring the U.S. and present in Mission Control Center in Houston, Texas, at the time. Portions of this sample, known as the Friendship Rock, were subsequently distributed to the nations represented by the students. A plaque located on the LM, commemorating the achievements made during the Apollo program, was then unveiled. Before reentering the LM for the final time, Cernan remarked, Cernan then followed Schmitt into the LM; the final lunar excursion had a duration of seven hours and fifteen minutes. Following closing of the LM hatch and repressurization of the LM cabin, Cernan and Schmitt removed their spacesuits and reconfigured the cabin for a final rest period on the lunar surface. As they did following each of the previous two EVAs, Cernan and Schmitt discussed their geological observations from the day's excursion with mission control while preparing to rest. "The Final Flight" – Excerpt from the September 1973 issue of National Geographic magazine