Lesson plan
Apollo 4
Apollo 4 (November 9, 1967), also known as SA-501, was the uncrewed first test flight of the Saturn V launch vehicle, the rocket that eventually took astronauts to the Moon. The space vehicle was assembled in the Vehicle Assembly Building, and was the first to be launched from Kennedy Space Center (KSC) in Florida, ascending from Launch Complex 39, where facilities built especially for the Saturn V had been constructed. Apollo 4 was an "all-up" test, meaning all rocket stages and spacecraft were fully functional on the initial flight, a first for NASA. It was the first time the S-IC first stage and S-II second stage flew. It also demonstrated the S-IVB third stage's first in-flight restart. The mission used a Block I command and service module modified to test several key Block II revisions, including its heat shield at simulated lunar-return velocity and angle. The launch was planned for early 1967, but delayed to November 9 because of problems with various elements of the spacecraft and difficulties during pre-flight testing. Additional inspections were also required after a fire killed the Apollo 1 crew in January 1967. The mission splashed down in the Pacific Ocean slightly less than nine hours after launch, having achieved its objectives.…
Article summary
Apollo 4 (November 9, 1967), also known as SA-501, was the uncrewed first test flight of the Saturn V launch vehicle, the rocket that eventually took astronauts to the Moon. The space vehicle was assembled in the Vehicle Assembly Building, and was the first to be launched from Kennedy Space Center (KSC) in Florida, ascending from Launch Complex 39, where facilities built especially for the Saturn V had been constructed. Apollo 4 was an "all-up" test, meaning all rocket stages and spacecraft were fully functional on the initial flight, a first for NASA. It was the first time the S-IC first stage and S-II second stage flew. It also demonstrated the S-IVB third stage's first in-flight restart. The mission used a Block I command and service module modified to test several key Block II revisions, including its heat shield at simulated lunar-return velocity and angle. The launch was planned for early 1967, but delayed to November 9 because of problems with various elements of the spacecraft and difficulties during pre-flight testing. Additional inspections were also required after a fire killed the Apollo 1 crew in January 1967. The mission splashed down in the Pacific Ocean slightly less than nine hours after launch, having achieved its objectives.…
Key claims
- employees: 43 employees — source: Wikipedia, revision 1358551336, retrieved 2026-10-20 · confidence 0.95
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- The record states that the employees is "43 employees". What evidence would count against this claim?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
- Wikipedia, “Apollo 4”, revision 1358551336, retrieved 2026-10-20 https://en.wikipedia.org/w/index.php?oldid=1358551336
Key claims and bibliography are generated from the same tracked claims and sources as the article page.