---
title: Artemis program
slug: artemis-program
qid: 
snapshot: enwiki-001378556685
content_hash: 
license: CC BY-SA 4.0
source: https://en.wikipedia.org/w/index.php?oldid=1378556685
tags: [112072568, 125876068, 127051190, 127955526, 20136053, 20400212, 22985424, 22985471, 22985536, 23118434, 23190028, 23603337, 24623845, 24745107, 24745122, 24745139, 28269683, 30525120, 32308905, 44446176, 49529085, 55837921, 585056, 585057, 65710263, 6810859, 68328988, 72287065, 81199107, 89061521]
---

# Artemis program

> [!note] Provenance
> Snapshot `enwiki-001378556685` · content root `…`
> Derived from <https://en.wikipedia.org/w/index.php?oldid=1378556685> · Licensed CC BY-SA 4.0

The Artemis program is a Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA), aimed at returning humans to the Moon for the first time since the Apollo program and building a permanent lunar base. It was formally established via Space Policy Directive-1 in 2017 by President Donald Trump. As of 2026, it has flown two successful missions, Artemis I and Artemis II, with three more planned through the end of 2028. Among the principal elements of the Artemis program are Space Shuttle–derived hardware, such as the Space Launch System's (SLS) core stage, its RS-25 engines, and solid rocket boosters, as well as systems originating from the canceled Constellation program, including the Orion spacecraft (paired with the European Service Module) and booster upgrades initially developed for Ares V. Other elements, such as the Human Landing System (HLS), are in development by private spaceflight companies under contract. International collaborations are bound by the Artemis Accords. The uncrewed Artemis I mission sent an Orion spacecraft to lunar orbit in 2022. Artemis II sent four astronauts on a lunar flyby in 2026, becoming the only crewed flight beyond low Earth orbit not part of the Apollo program. Artemis III, scheduled for late 2027, is planned to test an HLS lunar lander in Earth orbit.…

The Artemis program is a Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA), aimed at returning humans to the Moon for the first time since the Apollo program and building a permanent lunar base. It was formally established via Space Policy Directive-1 in 2017 by President Donald Trump. As of 2026, it has flown two successful missions, Artemis I and Artemis II, with three more planned through the end of 2028. Among the principal elements of the Artemis program are Space Shuttle–derived hardware, such as the Space Launch System's (SLS) core stage, its RS-25 engines, and solid rocket boosters, as well as systems originating from the canceled Constellation program, including the Orion spacecraft (paired with the European Service Module) and booster upgrades initially developed for Ares V. Other elements, such as the Human Landing System (HLS), are in development by private spaceflight companies under contract. International collaborations are bound by the Artemis Accords. The uncrewed Artemis I mission sent an Orion spacecraft to lunar orbit in 2022. Artemis II sent four astronauts on a lunar flyby in 2026, becoming the only crewed flight beyond low Earth orbit not part of the Apollo program. Artemis III, scheduled for late 2027, is planned to test an HLS lunar lander in Earth orbit. Artemis IV, targeted for 2028, is planned to be the first crewed lunar landing since Apollo. Beginning with Artemis V, scheduled for no earlier than late 2028, NASA intends yearly lunar landings to develop a permanent lunar base, as a step toward human missions to Mars. ==Overview== The Artemis program is organized around a series of missions of increasing complexity, intended to be spaced about a year apart. NASA and its partners have planned missions Artemis I to Artemis V, with additional missions proposed. Each numbered mission centers on launching an SLS rocket carrying an Orion spacecraft. Missions after Artemis II will also rely on support missions by other organizations and spacecraft. Artemis planners have contemplated sending to the moon an archive of cultural works, dubbed Lunar Codex, from creators across the world. The core infrastructure of Artemis consists of SLS, Orion, and the HLS. Additional program elements include the Commercial Lunar Payload Services, Exploration Ground Systems, Artemis Base Camp, the Lunar Terrain Vehicle, and spacesuit development. Certain program choices, including the use of a near-rectilinear halo orbit and long-term sustainability plans, have drawn criticism. Orion's first launch on SLS, originally scheduled for 2016, was delayed repeatedly and ultimately flew on November 16, 2022, as Artemis I, carrying mannequins and robotic payloads. The crewed Artemis II (lunar fly-by) mission flew on April 1, 2026. The future Artemis III (Earth orbit) is planned for late 2027, Artemis IV (lunar landing) for early 2028 and Artemis V (lunar landing) for late 2028. NASA plans approximately annual lunar landings thereafter. ===SLS missions=== Artemis I (November 16, 2022) was the first uncrewed test flight of the SLS, Orion, and ESM. The mission sent Orion into a polar distant retrograde lunar orbit for about six days before returning to Earth, where the capsule re-entered the atmosphere and landed in the Pacific Ocean with parachutes. Although the mission was successful overall, Orion's ablative heat shield experienced greater-than-expected erosion during reentry. Artemis II (April 1, 2026) was the first crewed test flight of SLS and Orion. The four crew members performed extensive testing of the spacecraft in high Earth orbit before Orion was boosted into a free-return trajectory around the Moon, returning to Earth for re-entry and splashdown. The mission was broadly comparable to Apollo 7 and Apollo 8, although Artemis II did not orbit the Moon and flew a more distant lunar flyby than the Apollo missions. Artemis III (late 2027) is planned to be the second crewed Artemis mission. The crew will launch aboard SLS/Orion and conduct rendezvous and docking tests in Earth orbit with one or both commercially developed lunar landers launched separately—SpaceX's Starship HLS and Blue Origin's Blue Moon—as well as test the Axiom Extravehicular Mobility Unit (AxEMU) space suit. The mission is broadly comparable to Apollo 9. Artemis IV (early 2028) is planned to be the first American crewed lunar landing since Apollo 17 in December 1972. The mission depends on a prior support flight to place a lander in lunar orbit before the launch of SLS/Orion. After arrival, astronauts will transfer to the lander for descent to the lunar surface, conduct at least two extravehicular activities (EVAs), and then return to lunar orbit for rendezvous with Orion. Orion will subsequently return the four astronauts to Earth. Launch is scheduled for 2028. Artemis V (late 2028) is planned to be the second crewed lunar landing. This mission also is when NASA is expected to begin building its Moon base. ===Early history=== The Artemis program incorporates several major components of previously canceled NASA programs and missions, including the Constellation program and the Asteroid Redirect Mission. Originally legislated by the NASA Authorization Act of 2005, as the retirement of the Space Shuttle drew near, the Constellation program included the development of the Ares I and Ares V rockets along with the Orion spacecraft. In May 2009, US president Barack Obama established the Augustine Committee to take into account several objectives including support for the International Space Station, development of missions beyond low Earth orbit (including the Moon, Mars, and near-Earth objects), and use of the commercial space industry within defined budget limits. The committee concluded that the Constellation program was massively underfunded and that a 2020 Moon landing was impossible. Constellation was subsequently suspended. On April 15, 2010, President Obama spoke at the Kennedy Space Center, announcing the administration's plans for NASA and canceling the non-Orion elements of Constellation, saying that the program was not viable. He instead proposed US$6 billion in additional funding and called for the development of a new heavy-lift rocket program to be ready for construction by 2015 with crewed missions to Mars orbit by the mid-2030s. On October 11, 2010, President Obama signed into law the NASA Authorization Act of 2010, which included requirements for the immediate development of the SLS rocket and the Orion spacecraft to support missions beyond low Earth orbit starting in 2016, while making use of the workforce, assets, and capabilities of the Space Shuttle program, Constellation program, and other NASA programs. The law also invested in space technologies and robotics capabilities tied to the overall space exploration framework, ensured continued support for Commercial Orbital Transportation Services, Commercial Resupply Services, and expanded the Commercial Crew Development program. On June 30, 2017, President Donald Trump signed an executive order to re-establish the National Space Council, chaired by Vice President Mike Pence. The administration's first budget request kept Obama-era human spaceflight programs: Commercial Resupply Services, Commercial Crew Development, the Space Launch System, and the Orion spacecraft for deep space missions, while reducing Earth science research and calling for the elimination of NASA's education office. == Missions == ===SpaceX Starship=== The SpaceX Starship system is a fully-reusable super heavy-lift Earth-launch system which is under development. It consists of a first-stage booster named Super-Heavy and a second-stage space vehicle which is generally named Starship and which will have several variants. A Starship HLS mission will use three variants: a tanker, a propellant depot, and the Starship HLS itself which will be designed only for lunar landings and takeoffs, and not for Earth landings. Some variants will be able to return to Earth for reuse. The second-stage Starships are fully self-contained spacecraft, complete with their own propulsion systems. The combined Starship system using standard Starship variants for its second stage is planned to launch crews and cargo, which may then be used to support the various developmental needs of the Artemis program, and also to support the needs of other NASA and SpaceX programs. The SpaceX Starship is also qualified to be bid for Commercial Lunar Payload Services (CLPS) launches, and in 2021 was the winning NASA bid for a crewed lunar landing. === Human Landing System (HLS)=== ==Notes== ===Sources===
