Lesson plan
Atos
showing train delay information from ATOS or is a computerized control system used by the East Japan Railway Company to regulate train traffic on railway lines in metropolitan Tokyo, Japan. It was designed by Hitachi. The first deployment was on the Chūō Main Line in 1996. It is now used on fourteen lines listed below. On ATOS-enabled lines, each train station has electronic displays, which show scheduled arrival times and train destinations in Japanese and English, warn passengers when trains are arriving or passing through, send updates on system delays and accidents, and display messages to advertise JR products or warn passengers not to smoke. Pre-recorded voice announcements in train stations are also automated by ATOS. ATOS also directs train drivers through 16-by-16 lamp matrices, which flash messages telling the train driver to speed up, slow down, or adjust their scheduled departure time in order to keep the entire network running on schedule. Several JR lines in the Kantō region use CTC or PRC systems in lieu of ATOS.
Article summary
showing train delay information from ATOS or is a computerized control system used by the East Japan Railway Company to regulate train traffic on railway lines in metropolitan Tokyo, Japan. It was designed by Hitachi. The first deployment was on the Chūō Main Line in 1996. It is now used on fourteen lines listed below. On ATOS-enabled lines, each train station has electronic displays, which show scheduled arrival times and train destinations in Japanese and English, warn passengers when trains are arriving or passing through, send updates on system delays and accidents, and display messages to advertise JR products or warn passengers not to smoke. Pre-recorded voice announcements in train stations are also automated by ATOS. ATOS also directs train drivers through 16-by-16 lamp matrices, which flash messages telling the train driver to speed up, slow down, or adjust their scheduled departure time in order to keep the entire network running on schedule. Several JR lines in the Kantō region use CTC or PRC systems in lieu of ATOS.
Key claims
- date of formation: 1997 — source: Wikipedia · confidence 0.95
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- The record states that the date of formation is "1997". What evidence would count against this claim?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
- Wikipedia https://en.wikipedia.org/w/index.php?oldid=1359336591
Key claims and bibliography are generated from the same tracked claims and sources as the article page.