Avon Dam
The Avon Dam is a gravity dam across the Avon River, located at Avon, in the New South Wales Southern Highlands, Australia.
≈ 6 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
The Avon Dam is a gravity dam across the Avon River, located at Avon, in the New South Wales Southern Highlands, Australia. It is one of four dams and weirs in the catchment of the Upper Nepean Scheme, providing water to the Macarthur and Illawarra regions, the Wollondilly Shire, and metropolitan Sydney.
The dam was completed in 1927 under the supervision of Ernest Macartney de Burgh, and is currently managed by WaterNSW. The dam was added to the New South Wales State Heritage Register in 1999.
History
The Upper Nepean Scheme was commenced in 1880 after it was realised that the Botany Swamps scheme was insufficient to meet Sydney's water supply needs. The Nepean project consisted of the construction of a weir across the Nepean River to divert the rivers Cataract, Cordeaux, Avon and Nepean, to the Prospect Reservoir.
By 1902 the original Nepean scheme was found also to be inadequate, after a severe drought had again depleted the water supply. A Royal Commission was appointed in 1902 to report on the water supply situation and in that same year, it recommended the construction of the Cataract Dam, to impound the waters of the Cataract River at a site upstream of Broughton's Pass.
Construction of the dam was completed about the end of 1907. From 1907, rainfall on the catchment area was very low and it was not until January 1911 that Cataract Dam first filled to capacity. This, together with the greatly increased rate of consumption of water, stressed the need for additional water storage.
The Nepean River watershed, from a topographical standpoint, was found to be very favourable for the construction of large water storage works at moderate cost. Rivers such as the Cordeaux, Avon and Nepean, located in narrow gorges, provided very suitable dam sites, with solid rock foundations at a shallow depth.
Sandstone could easily be quarried into rough rectangular blocks and used for the construction. These features led to the recommendation that more dams be built. A site for a second storage dam, Cordeaux, to be built on the Cordeaux River, was selected by the Water Board in the latter part of the 1911 and a gauging weir was constructed.
Preliminary plans and estimates were prepared and the foundations tested. Following this, further investigations were carried out by the Public Works Department. Good rainfall occurred throughout the succeeding years (except for a dry period in 1915–1916) and, because of this and the intervention of World War I, construction on the Cordeaux Dam was not commenced until 1918.
In November of that year a Special Board of Experts consisting of engineers from the Public Authorities was appointed by the Government to draw up recommendations for the amplification of the Sydney water supply. This body not only endorsed the construction of the Cordeaux Dam but recommended the construction of the Avon and Nepean Dams as well.
In 1921, three years after the Cordeaux Dam was commenced and five years before it was completed, the Public Works Department commenced work on a third and much higher dam at a site selected on the Avon River, a tributary of the upper Nepean. The Avon Dam was also designed and constructed by the Public Works engineers under the direction of the Chief Engineer for Water Supply and Sewerage, E.M. De Burgh.
The resident engineer, during its construction, was Gerald Haskins. As with the previous dams, Cataract and Cordeaux, Avon Dam was built using cyclopean masonry. This consisted of sandstone blocks, quarried from the site, which were fitted into an irregular pattern and packed with sandstone concrete.
However, in this case the rock was quarried to make a deep cut through a ridge to a neighbouring creek to provide the spillway for the dam. Like its predecessors, Avon also had the upstream face of the dam sheathed with a layer of basaltic concrete that is thick for watertightness and to resist wave and other erosion forces.
The concrete was all manufactured on the site in special metal-crushing, concrete mixing plants. These included Jacques roll-jaw crushers, pulverising mills and Mullimix drum-type batchmixers. From the mixers, the concrete was discharged into concrete skips especially designed to facilitate the distribution of the concrete on the dam wall.
All the plant was electrically operated and the current obtained from the State Power Station at Port Kembla by transmission lines in length. A road long was constructed from Bargo railway station to transport all the materials. Other plant used on the site included two Lidgerwood cableways, three locomotive cranes and four stiff-leg type derrick cranes.
All of these were designed and constructed in Australia. The water storage area for the dam was cleared of all timber and brush except for stumps high. Any hardwood timber of commercial value was cut into sleepers, fencing posts and rails and used in the construction of the works railway to the Nepean Dam then under construction.
An extensive area of coachwood timber (Ceratopetalum apetalum) was found in the storage basin. This was cut at a special sawmill erected at the Dam and a fleet of punts and launches transported the logs down the river to the mill. About 1 million superficial feet (3,540 m 3 ) of sawn and dressed timber was produced.
It was used in the construction of buildings in the Nepean Dam township, for wall forms for both the Avon and Nepean Dams and the remainder was sold. Accommodation for workmen was provided near the construction site in a single-storey barracks for single men.
Land was placed at the disposal of the married men who were assisted in constructing temporary houses for themselves and their families. Avon Dam was completed in 1927 and handed over to the Sydney Water Board on 20 January 1928. It was built at the cost of A£1,047,000.
The dam served the Sydney area until the completion of Warragamba Dam in 1960, after which, in 1963, its storage was reserved to meet the increased water supply needs of the Wollongong area. An electrical pumping station located in Flying Fox Creek, at the end of the stored water remote from the wall, pumps water over the Divide to Wollongong and Port Kembla.
In 1973, as part of a plan to interconnect the various water supply systems for Sydney, Wollongong and Sutherland, a tunnel was constructed between the Nepean Dam and the Avon Dam. This allows water to be transferred in either direction, as required.
See also
List of reservoirs and dams in New South Wales Sydney Water Shoalhaven Scheme Upper Canal System Gerald Haskins
Further reading
WaterNSW -
Text derived from https://en.wikipedia.org/w/index.php?oldid=1369823644 under CC BY-SA 4.0; modifications have been made.