Lesson plan

BDŽ class 76

After 1973 the acquisition of additional high-speed diesel locomotives was considered to complement the BDZ park for the Septemvri - Dobrinishte line and especially for the replacement of the steam tram along the line Cherven Bryag - Oryahovo. The acquisition of class 75 locomotives failed for a number of reasons. Thus a construction and supply contract was signed with the Romanian plant "23 August" (now FAUR) - Bucharest. The locomotives were built to the technical conditions of BDZ, reflecting the experience of the already 10 years of operation of the class 75 locomotives. Initially, a prototype of the locomotive was designated 76-15 (after the test runs the machine had to be returned to the factory for refurbishment when the locomotives 76-01 to 76-14 were already under construction) to be delivered as the last locomotive in the series. The program was implemented and all locomotives were put into operation from May to September 1977, and 76-15 arrived in February 1978. Initially, all class 76 locomotives were assigned to the Cherven Bryag depot. This replaced the steam traction on the line entirely. Later it was found that their number was bigger than required and five were sent to the Septemvri depot (76-11 to 76-15).…

Back to article

Article summary

After 1973 the acquisition of additional high-speed diesel locomotives was considered to complement the BDZ park for the Septemvri - Dobrinishte line and especially for the replacement of the steam tram along the line Cherven Bryag - Oryahovo. The acquisition of class 75 locomotives failed for a number of reasons. Thus a construction and supply contract was signed with the Romanian plant "23 August" (now FAUR) - Bucharest. The locomotives were built to the technical conditions of BDZ, reflecting the experience of the already 10 years of operation of the class 75 locomotives. Initially, a prototype of the locomotive was designated 76-15 (after the test runs the machine had to be returned to the factory for refurbishment when the locomotives 76-01 to 76-14 were already under construction) to be delivered as the last locomotive in the series. The program was implemented and all locomotives were put into operation from May to September 1977, and 76-15 arrived in February 1978. Initially, all class 76 locomotives were assigned to the Cherven Bryag depot. This replaced the steam traction on the line entirely. Later it was found that their number was bigger than required and five were sent to the Septemvri depot (76-11 to 76-15).…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.