Lesson plan

Bear River Bridge

The Bear River Bridge was located in Nevada County, California, from 1908 to 1963, replacing an earlier wooden structure. When built over the Bear River, it was the highest railway bridge in the state. The bridge was built by the Nevada County Narrow Gauge Railroad, under the management of Sarah Kidder. From the surface of the water, at an average stage, up to the track was . The total length was about , and at the time of construction there were no approaches, the opposite banks being abrupt. The pier foundations were built of reinforced concrete, requiring more than 500 cubic yards. The piers and superstructure were of structural steel, of which about 500 tons were used. All the steel material was furnished by the American Bridge Company of San Francisco, and the constructing contractors were Shattuck & Edinger Construction Company, also of San Francisco. The total cost of the bridge was approximately US$70,000. The engineering involved much difficulty—principally due to the unusual height of the structure. At the beginning of the work the contractors stretched a 2.25 inch diameter steel cable from bank to bank more than above the Bear River, and long. By means of this cable all of the structural steel material required, as well as the concrete, were hoisted and conveyed by a trolley to the required point and lowered to the proper position.…

Back to article

Article summary

The Bear River Bridge was located in Nevada County, California, from 1908 to 1963, replacing an earlier wooden structure. When built over the Bear River, it was the highest railway bridge in the state. The bridge was built by the Nevada County Narrow Gauge Railroad, under the management of Sarah Kidder. From the surface of the water, at an average stage, up to the track was . The total length was about , and at the time of construction there were no approaches, the opposite banks being abrupt. The pier foundations were built of reinforced concrete, requiring more than 500 cubic yards. The piers and superstructure were of structural steel, of which about 500 tons were used. All the steel material was furnished by the American Bridge Company of San Francisco, and the constructing contractors were Shattuck & Edinger Construction Company, also of San Francisco. The total cost of the bridge was approximately US$70,000. The engineering involved much difficulty—principally due to the unusual height of the structure. At the beginning of the work the contractors stretched a 2.25 inch diameter steel cable from bank to bank more than above the Bear River, and long. By means of this cable all of the structural steel material required, as well as the concrete, were hoisted and conveyed by a trolley to the required point and lowered to the proper position.…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.