__NOTOC__ The original Black Hawk Bridge spanned the Mississippi River, joining the town of Lansing, in Allamakee County, Iowa, to rural Crawford County, Wisconsin.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 3 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

__NOTOC__ The original Black Hawk Bridge spanned the Mississippi River, joining the town of Lansing, in Allamakee County, Iowa, to rural Crawford County, Wisconsin. It was demolished with explosives on December 19, 2025. A temporary car ferry operates while the replacement bridge is under construction. Completion of the new bridge is estimated for November 2026.

Closure

The bridge was subject to periodic closures: in August 2011 the bridge was briefly closed for repairs after a crack was found in a floor beam. The Iowa Department of Transportation again closed the Black Hawk Bridge temporarily on February 25, 2024, citing structural integrity concerns following movement of two bridge piers.

The department performed emergency repairs, reopening the bridge to traffic on April 20, 2024. On May 18, 2025, the bridge was closed again due to a shifting pier, with a temporary passenger-only water taxi service beginning June 4, 2025. The bridge was re-opened June 9, 2025; additional closes were expected related to construction of the new bridge.

The old bridge permanently closed on October 20, 2025, to safely allow for continued construction of the new bridge and demolition of the old bridge; leaving no direct road crossing for about 2 years. A temporary car ferry service across the river began November 3, 2025.

The old bridge was imploded on December 19, 2025, with its large central superstructure dropped into the Mississippi River.

Replacement

The old bridge had a sufficiency rating of 39.9 percent, which mainly reflected its obsolete nature. The Iowa Department of Transportation began planning for a replacement bridge with feasibility studies beginning in 2004.

It was revealed during a meeting on June 15, 2021, that the replacement bridge's design would be extremely similar to the current bridge's design while either retaining the pier's design or adopting a newer wave design. A design similar to the original bridge was ultimately chosen; construction of the new bridge began in September 2023.

The old bridge was featured in a scene from the 1999 film The Straight Story, when Alvin Straight is depicted crossing the Mississippi River near the end of his journey.

See also

List of crossings of the Upper Mississippi River List of bridges documented by the Historic American Engineering Record in Iowa List of bridges documented by the Historic American Engineering Record in Wisconsin

References

Iowa Department of Transportation, retrieved July 28, 2007 Black Hawk Bridge Superb site, with pictures and statistics, retrieved July 28, 2007 NationalBridges.com, retrieved August 7, 2007 . Lansing Bridge Project – Iowa Department of Transportation.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1373918775 under CC BY-SA 4.0; modifications have been made.