Lesson plan

Cadder Yard

Cadder Yard is the railway yard situated between Bishopbriggs and Lenzie on the Edinburgh and Glasgow Railway (E&G). Cadder is a district of the town of Bishopbriggs. It was a hump shunting yard built by the North British Railway (NBR) in October 1901 as part of the Sighthill Goods Yard and High Street Goods Yard modernisation scheme. In the early days the majority of the railway workings were on the north side of the E&G, i.e., the up-yard. The hump was located to the North-West. With the modern changes of emphasis in British Rail freight almost all of the rail workings on the north side and signal boxes were removed in the 1970s and 1980s. The passing loops on either side of the main line have been retained and are used on a daily basis. The north side, beyond the up-loop, is a large Green Link tree-planting project. On the south side, beyond the down-loops, are maintenance sidings. Direct Rail Services (DRS) leased the site from July 2006 - May 2011 where it was used as a wagon maintenance and storage location. Subsequently, DRS opted to move these operations to Motherwell TMD. This move might have been due to the lack of covered facilities, or to the EGIP construction plans. In 2016, Cadder Down Yard was the site of EGIP electrification construction depot.…

Back to article

Article summary

Cadder Yard is the railway yard situated between Bishopbriggs and Lenzie on the Edinburgh and Glasgow Railway (E&G). Cadder is a district of the town of Bishopbriggs. It was a hump shunting yard built by the North British Railway (NBR) in October 1901 as part of the Sighthill Goods Yard and High Street Goods Yard modernisation scheme. In the early days the majority of the railway workings were on the north side of the E&G, i.e., the up-yard. The hump was located to the North-West. With the modern changes of emphasis in British Rail freight almost all of the rail workings on the north side and signal boxes were removed in the 1970s and 1980s. The passing loops on either side of the main line have been retained and are used on a daily basis. The north side, beyond the up-loop, is a large Green Link tree-planting project. On the south side, beyond the down-loops, are maintenance sidings. Direct Rail Services (DRS) leased the site from July 2006 - May 2011 where it was used as a wagon maintenance and storage location. Subsequently, DRS opted to move these operations to Motherwell TMD. This move might have been due to the lack of covered facilities, or to the EGIP construction plans. In 2016, Cadder Down Yard was the site of EGIP electrification construction depot.…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.