Caltrain (reporting mark JPBX) is a commuter rail line in California, serving the San Francisco Peninsula and Santa Clara County. The southern terminus is in San Jose at the Tamien station, with weekday rush-hour service extending to Gilroy. The northern terminus of the line is in San Francisco at 4th and King Street. Caltrain has express, limited, and local services. There are 28 regular stops, one limited-service weekday-only stop (College Park), one weekend-only stop (Broadway), and one stop that is only served on football game days (Stanford). While average weekday ridership in 2019 exceeded 63,000, impacts of the COVID-19 pandemic have been significant: in March 2026, Caltrain had an average weekday ridership of 41,968 passengers. Caltrain is governed by the Peninsula Corridor Joint Powers Board (PCJPB) which consists of transit agencies from the three counties served by Caltrain: Santa Clara, San Francisco, and San Mateo. Each member agency has three representatives on a nine-member Board of Directors. The member agencies are the Santa Clara Valley Transportation Authority, the San Francisco Municipal Transportation Agency, and the San Mateo County Transit District (SamTrans).…

Caltrain (reporting mark JPBX) is a commuter rail line in California, serving the San Francisco Peninsula and Santa Clara County. The southern terminus is in San Jose at the Tamien station, with weekday rush-hour service extending to Gilroy. The northern terminus of the line is in San Francisco at 4th and King Street. Caltrain has express, limited, and local services. There are 28 regular stops, one limited-service weekday-only stop (College Park), one weekend-only stop (Broadway), and one stop that is only served on football game days (Stanford). While average weekday ridership in 2019 exceeded 63,000, impacts of the COVID-19 pandemic have been significant: in March 2026, Caltrain had an average weekday ridership of 41,968 passengers. Caltrain is governed by the Peninsula Corridor Joint Powers Board (PCJPB) which consists of transit agencies from the three counties served by Caltrain: Santa Clara, San Francisco, and San Mateo. Each member agency has three representatives on a nine-member Board of Directors. The member agencies are the Santa Clara Valley Transportation Authority, the San Francisco Municipal Transportation Agency, and the San Mateo County Transit District (SamTrans). After historically relying on diesel locomotives, Caltrain electrified of its route between San Francisco and Tamien, and has transitioned to electric service, with diesel trains remaining in service between San Jose and Gilroy.

History

Southern Pacific service

locomotive pulls a Peninsula Commute train past Bayshore in April 1985. The original commuter railroad was built in 1863 under the authority of the San Francisco & San Jose Railroad; it was purchased by Southern Pacific (SP) in 1870. SP double-tracked the line in 1904 and rerouted it via the Bayshore Cutoff. After 1945, ridership declined with the rise in automobile use; in 1977 SP petitioned the state Public Utilities Commission to discontinue the commuter operation because of ongoing losses. California legislators wrote Assembly Bill 1853 in 1977 to allow local transit districts along the line to make bulk purchases of tickets for resale at a loss, subsidizing commuters reliant on the Peninsula Commute until 1980; more importantly, the bill also authorized Caltrans to begin negotiating with SP to operate the passenger rail service and acquire the right-of-way between San Bruno and Daly City. To preserve the commuter service, in 1980 Caltrans contracted with SP and began to subsidize the Peninsula Commute. Caltrans purchased new locomotives and rolling stock, replacing SP equipment in 1985. Caltrans also upgraded stations, added shuttle buses to nearby employers, and dubbed the operation CalTrain.

Joint Powers Board

The Peninsula Corridor Joint Powers Board was formed in 19871 to manage the line. Subsequently, San Mateo and Santa Clara Counties commissioned Earth Metrics, Inc., to prepare an Environmental Impact Report on right-of-way acquisition and expansion of operations. With state and local funding, the PCJPB bought the railroad right of way between San Francisco and San Jose from SP in 1991. As SamTrans advanced most of the local funds used to purchased the right-of-way, it was also agreed that SamTrans would serve as the managing agency until San Francisco and Santa Clara Counties could repay their portions. The following year, PCJPB took responsibility for CalTrain operations and selected Amtrak as the contract operator. PCJPB extended the CalTrain service from San Jose to Gilroy, connecting to VTA light rail at Tamien station in San Jose. In July 1995, CalTrain became accessible to passengers with wheelchairs, excepting 22nd Street station, which has no step-free access. Five months later, CalTrain increased the bicycle limit to 24 per train, making the service attractive to commuters in bicycle-friendly cities such as San Francisco and Palo Alto. In July 1997, the current logo was adopted, and the official name became Caltrain, dropping the capitalized "T". In 1998, the San Francisco Municipal Railway extended the N Judah line from Market Street to the San Francisco Caltrain station at 4th and King streets, providing a direct connection between Caltrain and the Muni Metro system. A year later, VTA extended its light rail service from north Santa Clara to the Mountain View station. Starting in 1999, Caltrain reconstructed several stations and upgraded tracks and level crossings under the "Ponderosa Project". In June 2003, a passenger connection for the Bay Area Rapid Transit (BART) and Caltrain systems opened at Millbrae station just south of the San Francisco International Airport. In 2008, Caltrain reached a then all-time high of 98 trains each weekday. Caltrain announced on August 19, 2011, a staff recommendation to sign a five-year, $62.5 million contract with TransitAmerica Services, after taking proposals from three other firms, including Amtrak California, which had provided operating employees since 1992. The new operating contract was approved by the full Joint Powers Board at its scheduled September 1 meeting. TransitAmerica Services took over not only the conductor and engineer jobs on the trains, but also dispatching and maintenance of equipment, track, and right-of-way from Amtrak. On May 26, 2012, TransitAmerica took over full operations.

Baby Bullet service

locomotives; they have since been replaced by new electric train sets, but still see service on the South County Connector. In June 2004, Caltrain finished its two-year CTX (Caltrain Express) project for a new express service called the Baby Bullet. The project entailed new bypass tracks in Brisbane and Sunnyvale as well as a new centralized traffic control system. The Baby Bullet trains reduced travel time by stopping at only four or five stations between San Francisco and San Jose Diridon station; the express trains could overtake local trains at the two locations (near Bayshore and Lawrence stations) where passing loops were added. Travel time for about 46.75 miles between San Francisco and San Jose is 57 minutes (four stops), 59 minutes (five stops) or 61 minutes (six stops), compared to 1 hour 30 minutes for local trains. The Baby Bullets have the same top speed of as other trains, but fewer stops save time. The CTX project included the purchase of new Bombardier BiLevel Coaches along with MPI MP36PH-3C locomotives. The Baby Bullets proved popular, but many riders had longer commutes on non-bullet trains, some of which would wait for Baby Bullet trains to pass.

Budget crises

In May 2005 Caltrain started a series of fare increases and schedule changes in response to a projected budget shortfall. The frequency of the popular Baby Bullet express trains was increased; two express trains were added in May and another ten were added in August. New Baby Bullet stops, Pattern B stops, were introduced. Another increase of $0.25 in basic fare came in January 2006. On April 2, 2010, Caltrain announced the need to cut its services by around 50%, as it was required to cut $30 million from its $97 million budget because all three authorities that fund the line were facing financial problems themselves and $10 million a year in previous state funding had been cut. Revenues for both local and state agencies had been steadily declining, as well as ticket revenues at Caltrain itself, and had left all "beyond broke." On January 1, 2011, Caltrain cut four midday trains but upgraded four weekend trains to Baby Bullet service as a pilot program. This reduced its schedule from 90 to 86 trains each weekday. At the same time, it raised fares $0.25 and continued to contemplate cutting weekday service to 48 trains during commute hours only. By April 2011, Caltrain's board had approved a budget with fare increases to take effect on July 1, 2011, and no service cuts. The budget gap would be closed with another $0.25 fare increase, a $1 parking fee increase to $4, and additional money from other transit agencies and the MTC. On February 17, 2017, California State Senator Jerry Hill introduced SB 797, which would permit the Peninsula Corridor Joint Powers Board to submit a regional measure for sales tax increase of th of one cent to the voters in the three counties served by Caltrain. The regional measure would require a two-thirds majority (aggregated among the three counties) to pass, and would provide Caltrain with a dedicated revenue source estimated at $100 million per year. For comparison, in fiscal year 2016 (ending June 30, 2016), the operating expenses for Caltrain were $118 million, and farebox revenues were $87 million, leaving approximately $31 million in expenses to be funded by the PCJPB through its member agencies and county government contributions. SB 797 passed the California State Senate in May, and the State Assembly in September, and Governor Brown signed the bill into law in October. (US 101), seen here in San Mateo near Hillsdale Boulevard (2005) Advocates for the increased tax cited its potential benefits to alleviate congestion along U.S. Route 101, which Carl Guardino quipped "has become so congested that we've changed its name to the '101 Parking Lot'." Detractors pointed to Caltrain's bureaucracy and stated fares should be increased to improve services instead. A poll of 1,200 voters in early May indicated support was strong enough to pass the sales tax increase, if the tax would result in expanding ridership capacity. The poll was sponsored by the Silicon Valley Leadership Group (SVLG), headed by Guardino, which predicted that daily ridership could rise to 250,000 with the improvements in service funded by the dedicated sales tax increase. Potential capital projects which could use the dedicated funding include additional electric multiple units (making electric trains 8-EMU consists, rather than 6-EMU), extended boarding platforms, and the proposed Downtown Rail Extension (now known as The Portal) to the Salesforce Transit Center. A dedicated tax was proposed in 2011, contemporaneously with the prior budget crisis, but polls at the time indicated insufficient support. After SVLG's May 2017 poll indicated strong support, they petitioned Hill to act. By early 2020, the joint powers board was planning to propose a one-eighth-cent sales tax for voter approval later in the year, to provide an estimated $ of dedicated funding for the system, which currently relies on rider fares for 70% of its revenue. This funding would have enabled Caltrain to run 168 trains per weekday, with rush-hour headways of 10 minutes, with the completion of electrification in 2022. BART-like service levels were projected to increase ridership significantly. In March 2020, Caltrain's ridership dropped by 95% due to the COVID-19 pandemic, resulting in losses of $ per month. The joint powers board recast the sales tax proposal as a way to keep the system afloat. Due to the COVID-19 measures and subsequent loss of approximately 75% of its ridership, Caltrain discontinued Baby Bullet service starting March 17, 2020. Two weeks later, due to continued loss of ridership, Caltrain further cut service from 92 to 42 trains per weekday, starting March 30. Average weekday ridership plummeted from approximately 65,000 (pre-pandemic) to 1,300. By June 15, service was increased to 70 trains per weekday, and limited (skip-stop) service was reinstated; later that month, ridership had recovered to 3,200 per weekday. In July, after the San Francisco Board of Supervisors initially declined to consider the ballot proposal, citing concerns about the system's governance structure, Caltrain officials warned that the agency would run out of operating funds and be forced to suspend service by the end of the year. In August, San Mateo County officials agreed to make Caltrain more independent from SamTrans in exchange for placing the sales tax on the ballot. In November 2020, Measure RR passed which created dedicated funding of a one-eighth cent sales tax. The schedule was adjusted again starting December 14, with slightly fewer weekday trains (68) but more frequent off-peak and weekend service to support essential workers. The number of weekday trains returned to 70 starting March 22, 2021, and the schedule was adjusted to facilitate transfers to BART at Millbrae. Caltrain began operation with a new schedule that exceeds pre-pandemic service on August 30, 2021; there are 104 trains operated per weekday, including reinstated Baby Bullet service. Headways for popular stations are as low as 15 minutes during peak commute hours (6–9 a.m. and 4–7 p.m.) and 30 minutes throughout the day before 11 p.m. for most stations. The separate Saturday and Sunday schedules were consolidated into a single weekend schedule with 32 trains per weekend day. All stations have a maximum headway of 60 minutes, including weekends, except for a 90–120 minute gap between the earliest weekend trains. In addition, fares were cut in half for September. Gilroy service was increased to four weekday round trips on September 25, 2023. Despite ridership increases after electrification, by 2026 Caltrain projected a $75 million annual budget deficit over the following 15 years. In April 2026, the agency indicated potential service reductions that would be necessary if a regional funding measure is not passed in the November 2026 elections. They could include closure of one-third of stations, elimination of late evening and weekend service, frequency reduction to one train per hour, and closure of segments of the service.

Modernization and electrification

The Caltrain Modernization Program electrified the main line between San Francisco and the San Jose Tamien station, allowing transition from diesel-electric locomotive power to electric rolling stock. Proponents said electrification would improve service times via faster acceleration, allow better scheduling and reduce air pollution and noise. Electrification would also allow future expansion to downtown San Francisco. Electrified vehicles require less maintenance, but electrification will increase required track maintenance by about the same dollar amount, at least initially. The plan called to electrify the system between San Francisco and San Jose Tamien station. Originally scheduled for completion by 2020, the first electric multiple unit services started on August 11, 2024, with full electrification achieved and diesel trains retired on September 21, 2024. Electrification resulted in faster trip times thanks to better acceleration on the new electric multiple unit trains. A scheduled local train trip from San Jose Tamien to San Francisco was shortened from 115 minutes with a diesel train to 83 minutes with electric service, an improvement of 32 minutes. Electric express service added more stops but still improved trip times - a 7-stop diesel express train from San Jose Diridon to San Francisco was scheduled at 66 minutes, while a 10-stop electric express train went down to 59 minutes despite making more stops. A UC Berkeley study found electrification delivered significant air quality improvements both onboard trains and at stations, as well as the areas surrounding stations. The electrification project between San Francisco and Tamien is the first phase, the second phase being from Tamien station to Gilroy. Cost, excluding electric rolling stock, for the first phase was estimated at $471 million (2006 dollars). By 2016, costs had increased to $1.7 billion. Notably, in 2021, Caltrain stated that the overall cost of electrification had risen to $2.44 billion. As part of the Caltrain Modernization Program and mandated by the federal government, positive train control (PTC) was installed along the route between San Francisco and San Jose by late 2015. Caltrain planned to use lighter electric multiple units that do not comply with the Federal Railroad Administration (FRA) crashworthiness standards, but instead comply with the International Union of Railways (UIC) standards, on the electrified lines. The FRA granted Caltrain a waiver to operate these units, which were previously banned on mixed-use lines with other FRA-compliant rolling stock due to concerns over crashworthiness, after Caltrain submitted simulation data showing UIC-compliant rolling stock performed no worse or even better than FRA-compliant rolling stock in crashes. Caltrain plans to retain its newer diesel-electric rolling stock for use on the Dumbarton Extension and service south of Tamien. Caltrain awarded the electrification and EMU contracts at the July 7, 2016, PCJPB board meeting to Balfour Beatty and Stadler Rail, respectively, signaling the start of modernization efforts that will make Caltrain more akin to rapid-transit services such as Bay Area Rapid Transit (BART) than traditional commuter services, and allow the future California High-Speed Rail trains to reach San Francisco utilizing Caltrain tracks. In August 2016, Caltrain ordered sixteen six-car double-decker Stadler KISS electric multiple unit sets from Stadler Rail. The price is $166m for the 16 units, or $551m including an option of 96 more EMU cars. However, the plans for an electrified Caltrain were put in jeopardy in February 2017 by the Trump administration when US Secretary of Transportation Elaine Chao decided to indefinitely delay granting the federal funding for the Caltrain electrification project that had been approved by the Obama administration. One month later, in March 2017, the American Public Transportation Association (APTA) sent a letter to Secretary Chao calling the Caltrain delay "concerning." In more than two decades, the APTA wrote, "no project has failed to secure final signature after successfully meeting evaluation criteria." In February 2017, Caltrain fired Parsons Transportation Group and sued them for delays in designing the custom technologies necessary for the PTC system. They then went on to sign a contract with Wabtec, who would offer them the industry-standard PTC system. On April 30, legislators in the United States Congress included $100 million for the Caltrain electrification project in the proposed 2017 federal spending bill, which was signed into law by President Trump on May 6. The $100 million represents the federal funding for fiscal year 2017 of the total $647 million grant, with the balance expected in future years. Secretary Chao claimed she could not sign the grant without the full grant being budgeted, which was disputed by Caltrain and both California Senators Dianne Feinstein and Kamala Harris. On May 22, the FTA announced its intent to sign the funding grant, restoring the final piece of funding for the electrification project. The official grant was finally signed on May 23, and Caltrain broke ground for the Peninsula Corridor Electrification Project on July 21, 2017, in a ceremony attended by local and state officials at the Millbrae station. In December 2018, it was reported that Caltrain was again behind schedule in installing PTC for the rail corridor, and had requested a two-year extension. The Federal Railroad Administration certified Caltrain's PTC project in December 2020. The first electric trainset was shipped to the Transportation Technology Center for testing in February 2021. In June 2021, Caltrain announced that the start of revenue service with electric multiple units would be delayed to late 2024. In February 2022, the last foundation required for the new overhead catenary system was completed, with the entire line planned to be energized by summer 2022. Testing of the line would then begin using a AEM-7 electric locomotive, with revenue service planned for 2024. On March 10, 2022, a southbound train struck a contractor's crane in San Bruno, injuring 13 people. Caltrain began public operation of its electrified trainsets on August 11, 2024, with two trainsets, adding more each week until the full rollout of electric service between San Francisco and Tamien on September 21. As part of the transition, a new schedule was implemented. The new schedule provides for 104 trains on weekdays (52 in each direction) between San Francisco and San Jose Diridon, with local service running every 30 minutes, and alternating trains continuing to Tamien. During weekday rush hours, local service is supplemented by express (stopping only at 22nd Street, South San Francisco, Millbrae, San Mateo, Hillsdale, Redwood City, Palo Alto, Mountain View and Sunnyvale) and limited-stop trains (running express between San Francisco and Redwood City, then local between Redwood City and San Jose). Diesel trains continue to be used for South County Connector service between San Jose and Gilroy, with 4 trains in each direction, with these trains scheduled to provide timed cross-platform transfers to and from limited-stop or express electric trains at Diridon. Weekend service was doubled to 66 trains (33 in each direction), with local service running every 30 minutes between San Francisco and San Jose Diridon, and alternating trains continuing to Tamien.

Grade separation

(2005) , there were 41 vehicular at-grade crossings remaining along the PCJPB-owned right-of-way from San Francisco to Tamien: 2 in San Francisco: Mission Bay Dr, 16th St 29 in San Mateo County South San Francisco: Linden Ave San Bruno: Scott St Millbrae: Center St Burlingame: Broadway, Oak Grove, North Lane, Howard Ave, Bayswater, Peninsula San Mateo: Peninsula, Villa Terrace, Bellevue, 1st, 2nd, 3rd, 4th, 5th, 9th Redwood City: Whipple, Brewster, Broadway, Maple, Main, Chestnut Atherton: Fair Oaks Ln, Watkins Menlo Park: Encinal, Glenwood, Oak Grove, Ravenswood 10 in Santa Clara County Palo Alto: Palo Alto, Churchill, Meadow, Charleston Mountain View: Rengstorff Ave, Castro St Sunnyvale: Mary, Sunnyvale San Jose: Auzerais, West Virginia In addition, there are 28 more at-grade crossings in Santa Clara County along the UP-owned right-of-way between Tamien and Gilroy, including crossings at Skyway Drive, Branham Lane, Chynoweth Avenue in south San Jose. (2020) The first grade separation project under PCJPB was completed in 1994, building a flyover for Oyster Point Boulevard in South San Francisco. Additional grade separations were completed in 1995 (Fifth Ave in North Fair Oaks, depressed under rails), 1996 (Millbrae Ave in Millbrae, elevated above rails), and 1999 (Jefferson Ave in Redwood City, depressed under rails). Grade separation projects near the Belmont and San Carlos stations (for Ralston, Harbor, Holly, Brittan, and Howard) were completed in 1995, and 2000; these were "hybrid" crossings, executed as a combination of road depression and rails elevated on berms. The San Bruno station reconstruction was completed in 2014, separating the crossings at San Bruno, San Mateo, and Angus by elevating the rails on a long, curved berm. In 2021, a similar hybrid grade separation project (25th, 28th, and 31st Avenues in San Mateo) was completed near the Hillsdale station, which was relocated north during the grade separation. In 2018, gates were down for an average of approximately 11 minutes at each crossing during a typical peak weekday commute hour. The anticipated increase in rail traffic resulting from the completion of PCEP and implementation of CAHSR will result in additional road traffic delays for the remaining at-grade crossings along the Peninsula Corridor. File:SP 3193 with Train 149 at San Mateo, CA in August 1980 (32938025271).jpg|SP No. 3193 wears "Bloody Nose" pulling 3-car consist past San Mateo (1980) File:CalTrain's Experimental Paint Scheme Was Only on GP9E 3187 (30588506922).jpg|SP No. 3187 repainted in experimental CALTRAIN "Rainbow" livery (1985) File:CalTrain 916 named "California" waiting its turn at the 4th & Townsend station in San Francisco, CA in October 1985 (30591257451).jpg|916 "California" wears blue and teal stripes under state control (1985) File:CDTX 907 with painted gallery cars Apr 1985xrp.jpg|907 "Mountain View" carrying original Caltrans blue-and-teal stripes, pulling the three "Rainbow" gallery cars CDTX 3700, 3701, 3702 (1985) File:Gilroy Station 2024 07.JPG|914 "Atherton" F40PH repainted with new logo and new livery (2012) File:Caltrain-927.jpg|MPI MP36 locomotives carry as-ordered gray and red livery (2007, locomotive 927) File:Caltrain train 518 passing through Bayshore January 2026 3.jpg|Stadler KISS EMUs are painted with red-on-white livery (2026) File:CaltrainLogo (1982).svg|1982 logo used only on SP No. 3187 File:CaltrainLogo02.svg|1985–1997 logo File:Caltrain logo.svg|1997–present logo File:Caltrain roundel.svg|1997–present roundel

Train numbering scheme

indicates train number and final destination (San Francisco). Each train on the schedule is assigned a three-digit number indicating direction, sequence and stop pattern. With the transition to fully electric service between San Francisco and Tamien, using Stadler KISS EMUs, the entire three-digit train number and final destination are displayed on electronic destination signs visible on the leading (cab) car and the side windows of other cars. Caltrain adopted a modified train numbering scheme starting in September 2024: The first digit still indicates the service/stop pattern: 1xx trains are weekday local trains that make all regular stops. 4xx trains are weekday limited-service trains that run skip-stop between San Francisco and Redwood City, and local between Redwood City and San Jose Diridon. 5xx trains are weekday express trains, similar to the legacy Baby Bullet trains with a few additional stops. 6xx trains are weekend local trains that make all regular stops. 8xx trains are South County Connector diesel services operating between San Jose and Gilroy. The second and third digits are assigned sequentially within each stop pattern, starting from x01. The second and third digits still indicate the direction of the train; odd-numbered trains run northbound, and even-numbered trains run southbound. For example, 501 is the first northbound train that operates with the 5xx express service stop pattern, and 502 would be the first southbound train with the same 5xx stop pattern. Thus x03 is the second northbound train, x04 is the second southbound train, etc.

Legacy schemes

The practice of placarding train numbers, which provides basic information about the train's direction and type of service, dates back to when the trains were operated by Southern Pacific. The train number placard was displayed on each leading element (locomotive or cab car), using a physical or electronic sign which may be changed by the engineer. The train number should not be confused with the locomotive or equipment number, which is the 9xx number permanently stenciled on each locomotive, or the three or four-digit number similarly painted on each piece of rolling stock. Until 2021 All train number placards were physical signs capable of displaying two digits only until the MPI MP36 locomotives entered service in 2004, which can display three digits on an electronic sign. Prior to 2021, two-digit physical train number placards reflected the sequential train number, which are the last two digits of the three-digit train number. The first digit of the number posted on the trains indicated the stop pattern. The first digit for weekday trains was always 1, 2 or 3. 1xx trains were local trains that made all regular stops. 2xx trains were limited-service trains that skipped some stations. Each limited-service train used one of three or four stop patterns: local south of Redwood City, local north of Redwood City, or express services with approximately double the number of stops compared to Baby Bullet trains. In general, the split-local limited trains offered timed transfers at Menlo Park, Redwood City, and San Carlos. 3xx trains were Baby Bullet trains, which made the fewest stops. The first digit for weekend trains was always 4 or 8. 4xx trains were local trains that made all stops. 8xx trains were Weekend Baby Bullet trains that made fewer stops. The second and third digits indicated the sequence number of the train. For instance, x01 was the first train of the day. These digits also indicated the direction of the train; odd-numbered trains run northbound, and even-numbered trains run southbound. Thus x02 is the first southbound train of the day, x03 is the second northbound train of the day, etc. 2021 – 2024 Between August 30, 2021, and September 2024, Caltrain used a modified numbering scheme. The first digit reflects the stopping pattern: 1xx were local weekday trains making all regular stops 2xx were local weekend trains making all regular stops 3xx were limited weekday trains which skip selected stops, running local service between Lawrence and Redwood City 4xx were limited weekday trains which skip selected stops, running local between San Mateo and San Bruno 5xx were limited weekday trains which skip selected stops, running local between Palo Alto and Redwood City 7xx were Baby Bullet/express weekday trains which have the fewest stops, either seven southbound or eight northbound stops between San Jose and San Francisco The second and third digits are assigned sequentially within the service type These continue to reflect the direction of travel, so even numbers = southbound and odd = northbound. For example, 504 is the second southbound train within the 5xx stopping pattern. In addition, during this period, the information provided on the two-digit physical placards on the leading element of the train (either the control car, for northbound trains, or the locomotive, for southbound trains) was changed to provide the stop pattern only. Two-digit train placards combined the basic stopping scheme (L for local or limited, B for Baby Bullet service) with the first digit of the train number; for example, train 501 is the first northbound train with the 5xx limited stop pattern, and would carry "L5" on the physical placard; in the pre-2021 scheme, this train would have carried "01" instead.

Rolling stock

Electric multiple units

File:Caltrain Stadler KISS in San Jose 2023 dllu.jpg|New Caltrain Stadler KISS EMU train undergoing testing in San Jose (Nov 2023) File:Caltrain EMU interior upper deck.jpg|Upper deck of Caltrain EMU passenger car (Sep 2022) File:Interior of Caltrain Stadler KISS EMU (August 2024).jpg|Lower entrance door, vestibule stairs, and gangway areas inside EMU passenger cars (Aug 2024) File:Caltrain (JPBX) 305, Anna Eshoo (side).jpg|No. 305 named for Rep. Anna Eshoo (Jan 2025) In August 2016, Caltrain awarded a $551 million contract to Stadler Rail, which would produce the trainsets needed for running on the electrified line. The award was for 96 Stadler KISS EMU cars arranged into 16 trainsets, scheduled to be delivered for testing by August 2019. Under the contract, Caltrain had the option to procure an additional 96 units in the future for an additional $385 million. In December 2018, Caltrain was reportedly carrying 65,000 passengers a day, and expected to have 240,000 daily riders in 2040. Therefore, after funding was received from the California State Transportation Agency's Transit and Intercity Rail Capital Program, Caltrain's board approved the purchase of additional cars from Stadler, increasing the order from 16 six-car sets to 19 seven-car sets. In August 2023, Caltrain exercised an option order for four additional seven-car EMU trainsets ($220 million) and a single four-car battery electric multiple unit (BEMU) trainset ($80 million). This will result in a fleet of 23 EMU trainsets, six diesel-hauled trainsets, and one BEMU trainset by 2030, with over 90% of service using electric trains. The BEMU trainset will be used on the non-electrified portion of the corridor between Tamien and Gilroy. New trains are double-decked and equipped for both platform heights in anticipation of sharing facilities with California High-Speed Rail trains. The six-car EMU trainsets would have been long; as delivered, the seven-car EMU trains are . Units can reach speeds of , though operations will likely be limited to . Acceleration and deceleration of the EMUs are substantially better than the legacy diesel-electric trains. The legacy locomotives offer a starting tractive effort of for an EMD F40PH-2 and for an MPI M36PH-3C, while a seven-car KISS EMU set has a starting tractive effort of . The first Stadler KISS was completed by Stadler's Salt Lake City factory in July 2020. It was taken to the Transportation Technology Center in Pueblo, Colorado, for high-speed testing. Caltrain began public operation of its electrified trainsets on August 11, 2024, with two trainsets, adding more trains each week until the full rollout of electric service on September 21.

Locomotives

Prior to 1985, Caltrain used equipment leased from Southern Pacific, including SP/CDTX 3187, an EMD GP9 repainted in prototype Caltrain livery and other locomotives that had been used for the Peninsula Commute service. Since 1985, Caltrain has used the following locomotives, which are almost all powered by diesel engines: Caltrain also leased a number of Amtrak F40PH's in 1998 and 1999 while Caltrain's F40PH-2's were being overhauled. Since September 2024, newer diesel locomotives have been retained for service between Gilroy and San Jose. Revenue service between San Francisco and Tamien is provided by electric multiple units. Older diesel locomotives (built before 1987) were sold to Lima, Peru.

Legacy passenger cars

Before the rollout of all-electric service between San Francisco and Tamien in September 2024, Caltrain diesel trains consisted of one locomotive and a five- or six-car consist. Trains ran in a puller configuration (led by the locomotive) towards San Jose and in a pusher configuration (led by the cab car) towards San Francisco, so the orientation of cars remained consistent. File:Nippon Sharyo bi-level passenger car interior hallway.JPG|Interior of a Nippon Sharyo gallery car File:Inside Caltrain.JPG|Structural trusses on a crowded gallery car File:Caltrain trains 11 2018-09-09.jpg|Single seats on upper deck of a gallery car File:Caltrain Bombardier BiLevel Coach interior, SF.JPG|Upper deck of a Bombardier BiLevel car Caltrain had 93 Nippon Sharyo bi-level Gallery-type cars and 41 Bombardier BiLevel Coaches in revenue service in 2017. Each revenue train consist was made up of a single type of car, i.e., the passenger cars in trains were either all gallery or all bilevel, never mixed. Of the Gallery cars, 66 were coaches and 27 were bike-accessible cab cars. Caltrans purchased the first 63 gallery cars in 1985 when it began subsidizing the commuter rail service. The other 30 were purchased by Caltrain in 2000, and the older cars were rebuilt by Nippon Sharyo around the same time. The first 17 Bombardier BiLevel Coaches were purchased as surplus from Sounder Commuter Rail in 2002, of which 10 are coaches, 5 are cab-bike cars, and 2 are cab-wheelchair cars. Caltrain purchased an additional eight cars in 2008 to meet short-term passenger growth and to increase spare ratio. These Bombardier cars were initially only used on Baby Bullet express trains, but were later also used on limited-stop and local trains. Caltrain bought 14 remanufactured Budd Rail Diesel Car ("Boise Budd") single-level cars from Virginia Railway Express around 2000 for use on Special-Event trains. A seven-car special train took fans to the first game at Pac Bell Park on March 31, 2000. The northbound train ran at an estimated 125% of capacity and skipped stops after Hillsdale because it was already well above seated capacity. These cars were sold in 2005 after Bombardier cars were delivered and are now in service on the Grand Canyon Railway. car in Caltrain service Caltrain purchased 16 used Bombardier BiLevel Coaches from Metrolink in 2014 to cope with increasing ridership by lengthening certain Bombardier sets from five to six cars. The $15 million purchase was financed by a farebox revenue fund. Since the cars had retired from Metrolink service, they required rehabilitation before being placed in service with Caltrain. The ex-Metrolink cars were of older Series 1 and 2 that have riveted bodies, instead of the welded bodies in the Series 6 and 7 cars that Caltrain had purchased starting from 2002. Ex-Metrolink cars retained their Metrolink blue-on-white livery, but Metrolink logos were painted over and rolling stock numbers were repainted with JPBX numbers. All five-car Bombardier sets were lengthened to six-car Bombardier sets using surplus ex-Metrolink cars in May 2015. In July 2016, six-car Bombardier sets replaced some five-car gallery sets to relieve overcrowding. In November 2016, Caltrain rolled out six-car gallery sets for certain trains to further relieve overcrowding; the longer trains were a temporary measure to increase capacity until more frequent service can be achieved with electrification. After September 2024, electric multiple units displaced the legacy diesel locomotive and passenger car fleet for service between San Francisco and Tamien. The newer MPI diesel locomotives and bilevel passenger cars have been retained for service on the southern segment between San Jose and Gilroy. 19 locomotives and 90 gallery cars, built between 1985 and 1987, have been sold at a nominal price of US$6 million to Lima, Peru, and will be used in a new commuter rail service; the service is predicted to displace the equivalent of 4,000 cars per day between the eastern suburbs (Chosica) and the seashore (Callao) in the Lima metropolitan area.

Miscellaneous/Maintenance-of-Way

Caltrain has several cars used for track maintenance, such as JPBX 505, a track geometry car. Some other rolling stock is infrequently used for special service, such as on the Holiday Train, an annual non-revenue train decorated with lights, carrying volunteer carolers, and making limited stops for toy donations. The annual event began in 2001. It is sponsored by the Silicon Valley Community Foundation.

Equipment lease to Caltrans

In September 2025, Caltrain approved a 5-year lease with the option of purchase, of 3 MPI F40PH-2C locomotives, 13 Bombardier BiLevel trailer cars, and 3 Bombardier BiLevel cab cars to Caltrans in order to relieve equipment shortages on Amtrak California's Capitol Corridor and Gold Runner routes due to maintenances, repairs, and overhauls.

Bicycle access

Caltrain was one of the first commuter rail services to add bicycle capacity to its trains, inaugurating bicycle service in 1992 by allowing four bikes on certain trains. By 2016, up to 80 bicycles could be carried per train in two or three bike cars. After the EMU fleet entered revenue service in 2024, each seven-car train has two bike cars.

Bicycle policies

Legacy gallery and bilevel passenger cars with bike racks have a yellow "Bike Car" sign posted on the exterior next to the door. EMU bike cars have white bicycles stenciled on the windows of the doors. Cyclists are required to tie their bicycle to the rack with the bungee cord provided, and must be racked so they do not protrude into the aisle. Each rack can accommodate four bicycles. Because the bikes are stacked together against the racks, most riders place a destination tag, available from a conductor, on their bicycles to optimize placement and minimize shuffling. Cyclists must be at least six years old, and cyclists younger than 12 must be accompanied by an adult and capable of carrying their own bike on and off the train. Bicycles must be single-rider, with a maximum of in length, and tandem or three-wheel bikes are not allowed. Bulky attachments such as training wheels, trailers, saddlebags, and baskets are similarly not allowed. Folding bicycles are not restricted and can be carried on any car when folded; they may not be placed on seats or block aisles.

History of bikes on Caltrain

File:Bike Car (559390353).jpg|Caltrain gallery car, looking towards vestibule File:Caltrain Bombardier (Metrolink) (29018434103) (2).jpg|Caltrain Bombardier bilevel car (ex-Metrolink) File:Interior overview of Caltrain EMU car 3236.jpg|Caltrain Stadler KISS EMU The initial pilot program launched in 1992 allowed up to four bikes per train for off-peak service, and bicycles were carried in the cab car (northernmost car). Bicycle capacity was expanded to twelve bikes per train for all trains in 1995, followed by a doubling to 24 bikes per train for all trains in 1996. Only the cab/control car of each train consist was modified for bicycle service. Starting in 2001, additional gallery cars were modified for bicycle service. Gallery cars modified for bicycle service removed seats from the lower level in the north half of the car, resulting in space to carry 32 bicycles per car. By 2006, Bombardier cars were also modified for bicycle service by partially removing seats from the lower level of the car, resulting in space to carry 16 bicycles per car. Additional bicycle capacity was proposed by removing some seats from bicycle cars. Initially Caltrain rejected this idea because some trains are operated at seated capacity and the seat removal would take space from other passengers. However, in early 2009 Caltrain announced that it would be expanding bicycle capacity by 8 spots by removing some seats in the bike cars, bringing bike capacity to 40 bikes on gallery cars and 24 bikes on Bombardier cars. The expansion started several months later. After this, bike capacity on trains has been expanded by increasing the number of bike cars in a consist, rather than further modifying cars. In fall 2009, all Bombardier consists and some gallery consists substituted a second bike car for one of the passenger trailers. The remaining gallery consists continued with a single bike car, resulting in a carrying capacity of 48 bicycles on Bombardier consists or 40–80 bicycles on gallery consists with one or two bike cars, respectively. Due to demand, in 2011, the remaining gallery sets modified a passenger trailer to take bicycles, giving two bike cars to all consists, increasing capacity on all gallery consists to 80 bicycles per train. 10 gallery trailer cars, 3826-3835, had their lower-level seats removed in 2011. Although the Baby Bullet runs initially used five-car Bombardier consists, many of the Baby Bullet runs returned to five-car gallery sets due to their superior bicycle capacity, since demand for bicycle car access was high. Prior to 2016, both Bombardier and gallery trains used five-car consists. With the purchase of Bombardier cars from Metrolink, Caltrain announced in January 2015 that roughly half of the additional ex-Metrolink cars will be converted to bike cars with capacity for 24 bikes, so some trains running Bombardier cars will be six-car consists, of which three will be bike cars. Six-car Bombardier consists started running in May 2015, but the third car was not converted for bike service until March 2016. Five of the Bombardier cars were refurbished as bike cars and entered service in March 2016. All Bombardier consists are now six-car sets with three bike cars and three passenger cars. The third bike car is just south of the existing southern bike car. The third bike car is being placed next to the other bike car to help conductors to manage bike capacity. Official bike capacity for six-car Bombardier consists is 72 (24 bikes × 3 cars), comparable to the 80-bike capacity of five-car gallery consists (40 bikes × 2 cars). The EMUs which began revenue service in 2024 have two bicycle cars with a total capacity of 72 bikes per train, carrying 36 bicycles in each car.

Capacity issues

The variation on bicycle capacity between trainsets generated criticisms from the bicycling community, as cyclists may be denied boarding when a train reaches its bicycle capacity. The Baby Bullets, favored by many cyclists, often used lower bike-capacity Bombardier cars and some cyclists had to wait for slower trains with higher-capacity gallery cars, or seek alternate transportation. Due to equipment rotation and maintenance concerns, Caltrain said in 2009 that it could not dedicate cars with higher bike capacity on trains with high bike demand. Eventually, two bike cars were added to every train consist by 2011, and in 2016, a third bike car was added to Bombardier consists. To provide an alternative to bringing bicycles on board the trains, Caltrain has installed bicycle lockers at most stations, and constructed a new bicycle station at the San Francisco station. In early 2008, Caltrain sponsored Warm Planet bicycle station opened at the 4th and Townsend terminus. A bicycle station was open at the Palo Alto station from April 1999 to October 2004, and reopened in February 2007. Nearly all stations have racks and/or lockers available to park bicycles.

See also

List of San Francisco Bay Area trains South Bay Historical Railroad Society Southern Pacific Peninsula Commute Southern Pacific Transportation Company

Notes

References

External links