The Central Interceptor is a diameter wastewater tunnel beneath the central isthmus in Auckland, New Zealand. It carries sewage from parts of the city to the Māngere Wastewater Treatment Plant. The construction of the sewer tunnel began in 2019 and it was in service by mid 2026. The tunnel is described as the backbone of the Auckland sewer system. The project was undertaken by Watercare Services.
The Central Interceptor is a diameter wastewater tunnel beneath the central isthmus in Auckland, New Zealand. It carries sewage from parts of the city to the Māngere Wastewater Treatment Plant. The construction of the sewer tunnel began in 2019 and it was in service by mid 2026. The tunnel is described as the backbone of the Auckland sewer system. The project was undertaken by Watercare Services.
Construction
The construction contract was signed in March 2019 with the Ghella-Abergeldie Joint Venture. Construction was initially expected to run from 2019 to 2024. Construction will be via a tunnel boring machine. Sixteen access shafts, up to deep, will be constructed. The route will take the tunnel underneath the Manukau Harbour, although in other areas it will be as much as below ground level, due to significant elevation changes on the isthmus. In May 2021, Watercare reported that the project was eight months into what was expected to be a five-year construction period. A long tunnel boring machine had been delivered and was being prepared for service, which was gifted a name by local school children: Hiwa-i-te-rangi.