Cigéo (an acronym for Centre Industriel de Stockage Géologique, or Industrial Centre for Geological Disposal) is a French project to construct a deep geological repository for radioactive waste.
≈ 5 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
Cigéo (an acronym for Centre Industriel de Stockage Géologique, or Industrial Centre for Geological Disposal) is a French project to construct a deep geological repository for radioactive waste. It is designed to store approximately of high-level waste (HLW) and intermediate-level waste (ILW) produced by French nuclear facilities, including during their decommissioning, and by nuclear reprocessing of spent fuel.
The Agence nationale pour la gestion des déchets radioactifs (Andra) manages the project. After over thirty years of research, including at the Meuse/Haute Marne Underground Research Laboratory, Andra applied in 2023 to the French nuclear safety authority (ASN) for construction authorization.
The facility is planned near the border of the Meuse and Haute-Marne departments, within the communes of Ribeaucourt, Bure, Mandres-en-Barrois, and Bonnet, in the drainage basin of the Seine, near the Meuse watershed. The waste will be stored in a layer of clay to ensure long-term containment. The principle of geological disposal was enshrined in French law in 2006.
A 2013 public debate concluded that disposal was not urgent and the project timeline required revision. The law also defines alternatives, such as long-term storage or transmutation of waste into radioisotopes with shorter half-lives.…
Cigéo (an acronym for Centre Industriel de Stockage Géologique, or Industrial Centre for Geological Disposal) is a French project to construct a deep geological repository for radioactive waste. It is designed to store approximately of high-level waste (HLW) and intermediate-level waste (ILW) produced by French nuclear facilities, including during their decommissioning, and by nuclear reprocessing of spent fuel.
The Agence nationale pour la gestion des déchets radioactifs (Andra) manages the project. After over thirty years of research, including at the Meuse/Haute Marne Underground Research Laboratory, Andra applied in 2023 to the French nuclear safety authority (ASN) for construction authorization.
The facility is planned near the border of the Meuse and Haute-Marne departments, within the communes of Ribeaucourt, Bure, Mandres-en-Barrois, and Bonnet, in the drainage basin of the Seine, near the Meuse watershed. The waste will be stored in a layer of clay to ensure long-term containment. The principle of geological disposal was enshrined in French law in 2006.
A 2013 public debate concluded that disposal was not urgent and the project timeline required revision. The law also defines alternatives, such as long-term storage or transmutation of waste into radioisotopes with shorter half-lives. Estimated costs range from 15 to 36 billion euros, with financing primarily the responsibility of waste producers but partly supported by the state budget.
Social acceptability is a key challenge, with one billion euros spent to address public concerns. Two departmental Public Interest Groups (GIPs) support the project: the Haute-Marne GIP, chaired by Nicolas Lacroix, and the Meuse GIP, chaired by Jérôme Dumont, presidents of their respective departmental councils.
Since 1996, Cigéo has faced controversies over funding, the reversibility of disposal, uncertainties about containment over , the volume of waste, and the perceived legitimacy of public debates. In accordance with the 2006 law on radioactive wastes, producers are legally obliged to evaluate the long-term costs posed by their wastes and to set aside funds to meet those costs.
These expenses are not accounted for in "gross value", but are discounted: dedicated assets are invested and earn financial interest. If, for example, the interest rate is 3.04%, a euro invested today will theoretically yield 1.0304^100= after a century, which makes it possible to balance an expenditure twenty times higher in a hundred years' time.
One difficulty raised by opponents of the project is that, due to this discounting process, the provisions made by waste producers only partially cover the future costs of the storage centre, with the remainder expected to come from investment returns. High discount rates (5% and/or 3%) allow operators to allocate only €5 billion for the Cigéo project, although it is expected to cost at least seven times more.
Critics fear that if these provisions prove insufficient, "our children will inherit only the waste." This objection is based on the ability of financial investments to perform over the long term.
However, the discount rate used by waste producers is not fixed, but is itself constrained: "it cannot exceed the rate of return, as expected with a high degree of confidence, of the hedging assets, managed with a degree of security and liquidity sufficient to meet their purpose" and must be assessed annually. If the financial return is lower than expected, producers must reassess their charges upward, which can unbalance their expense accounts.
In such cases, "the administrative authority identifies deficiencies or inadequacies in the evaluation of costs, the calculation of provisions, or their amount, and may prescribe the necessary measures to regularize the situation, specifying deadlines for implementation." Operators are then required to increase provisions to rebalance their long-term expense accounts.
The State has decided not to cover the CEA's expenses from its own assets, but will ensure its financing through the budget; for operators whose costs are mainly long-term, the deadline for complying with this coverage rule was extended from 2011 to 2014.