Cloud Arch

Uses your system voice; voice and rate in settings.

Snapshot

≈ 3 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Cloud Arch is a proposed public artwork by Junya Ishigami for George Street, Sydney. The sculpture is proposed to be a ribbon of twisted, white stainless steel, representing the shape of a cloud, originally designed to be and with a span of 53 metres (174 ft). It is intended to "frame" the Sydney Town Hall, and be visible from all approach directions as part of the pedestrianisation of the street. The arch would span the tram tracks of the light rail line running up George Street. The feet of Cloud Arch will be placed on diagonally opposite corners of one of Sydney's busiest intersections, George and Park Street; the sculpture will stand among the Town Hall, the Queen Victoria Building, and The Galeries Victoria. Originally it was to be installed in 2019 but due to the increased costs ($22m, over the initial estimate of $9m) and disputes about site access during the construction of the light rail, planning for the project was postponed until 2020. As of 2022, the project is on hold.

Cloud Arch is a proposed public artwork by Junya Ishigami for George Street, Sydney. The sculpture is proposed to be a ribbon of twisted, white stainless steel, representing the shape of a cloud, originally designed to be and with a span of 53 metres (174 ft). It is intended to "frame" the Sydney Town Hall, and be visible from all approach directions as part of the pedestrianisation of the street. The arch would span the tram tracks of the light rail line running up George Street. The feet of Cloud Arch will be placed on diagonally opposite corners of one of Sydney's busiest intersections, George and Park Street; the sculpture will stand among the Town Hall, the Queen Victoria Building, and The Galeries Victoria. Originally it was to be installed in 2019 but due to the increased costs ($22m, over the initial estimate of $9m) and disputes about site access during the construction of the light rail, planning for the project was postponed until 2020. As of 2022, the project is on hold.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1318930734 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

17 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.