Commercial Crew Program
≈ 12 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
The Commercial Crew Program (CCP) provides commercially operated crew transportation service to and from the International Space Station (ISS) under contract to NASA, conducting crew rotations between the expeditions of the International Space Station program. The American space manufacturer SpaceX began providing service in 2020, using Crew Dragon, and NASA plans to add Boeing when Starliner becomes human rated no earlier than 2030. The spacecraft are owned and operated by the vendor, and crew transportation is provided to NASA as a commercial service.
Each mission sends up to four astronauts to the ISS. Operational flights occur approximately once every six months for missions that last for approximately six months. A spacecraft remains docked to the ISS during its mission, and missions usually overlap by at least a few days. Between the retirement of the Space Shuttle in 2011 and the first operational CCP mission in 2020, NASA relied on the Soyuz program to transport its astronauts to the ISS.
A Crew Dragon spacecraft is launched to space atop a Falcon 9 Block 5 launch vehicle and the capsule returns to Earth via splashdown in the ocean near Florida. The program's first operational mission, SpaceX Crew-1, launched on 16 November 2020. Boeing Starliner spacecraft will participate no earlier than 2027 after additional flight tests, launched atop an Atlas V N22 launch vehicle.…
The Commercial Crew Program (CCP) provides commercially operated crew transportation service to and from the International Space Station (ISS) under contract to NASA, conducting crew rotations between the expeditions of the International Space Station program. The American space manufacturer SpaceX began providing service in 2020, using Crew Dragon, and NASA plans to add Boeing when Starliner becomes human rated no earlier than 2030. The spacecraft are owned and operated by the vendor, and crew transportation is provided to NASA as a commercial service.
Each mission sends up to four astronauts to the ISS. Operational flights occur approximately once every six months for missions that last for approximately six months. A spacecraft remains docked to the ISS during its mission, and missions usually overlap by at least a few days. Between the retirement of the Space Shuttle in 2011 and the first operational CCP mission in 2020, NASA relied on the Soyuz program to transport its astronauts to the ISS.
A Crew Dragon spacecraft is launched to space atop a Falcon 9 Block 5 launch vehicle and the capsule returns to Earth via splashdown in the ocean near Florida. The program's first operational mission, SpaceX Crew-1, launched on 16 November 2020. Boeing Starliner spacecraft will participate no earlier than 2027 after additional flight tests, launched atop an Atlas V N22 launch vehicle. Instead of a splashdown, a Starliner capsule will return on land with airbags at one of four designated sites in the western United States.
Development of the Commercial Crew Program began in 2011 as NASA shifted from internal development of crewed vehicles to perform ISS crew rotation to commercial industry development of transport to the ISS. A series of open competitions over the following two years saw successful bids from Boeing, Blue Origin, Sierra Nevada, and SpaceX to develop proposals for ISS crew transport vehicles. In 2014, NASA awarded separate fixed-price contracts to Boeing and SpaceX to develop their respective systems and to fly astronauts to the ISS.
Each contract required four successful demonstrations to achieve human rating for the system: pad abort, uncrewed orbital test, launch abort, and crewed orbital test. Operational missions were initially planned to begin in 2017, with missions alternating between the two providers. Delays required NASA to purchase additional seats on Soyuz spacecraft up to Soyuz MS-17 until Crew Dragon missions commenced in 2020. Crew Dragon continues to handle all missions until Starliner becomes operational no earlier than 2027.
Crew Dragon
SpaceX's Crew Dragon is a variant of the company's Dragon 2 class of spacecraft, which is an upgraded version of the first-generation Dragon. It measures wide, tall without its trunk, and with its trunk. While trunks are discarded prior to capsule reentry, crew cabins are designed to be reusable. After earlier plans of SpaceX to use new capsules for every crewed flight for NASA both agreed to reuse Crew Dragon capsules for NASA flights. In 2022, SpaceX stated that a capsule can be reused up to fifteen times.
Crew Dragon spacecraft can spend up to a week in free flight without being docked to the ISS. Each Crew Dragon capsule is equipped with a launch escape system consisting of eight of SpaceX's SuperDraco engines, which provide of thrust each.
These engines were originally intended to also perform a propulsive landing upon return to Earth, with the first test vehicle having been equipped for such capabilities, but these plans were ultimately abandoned in favor of a traditional splashdown return near Florida in either the Atlantic Ocean or the Gulf of Mexico.
SpaceX's CCtCap contract values each seat on a Crew Dragon flight to be between US$60–67 million on the first six missions, while the face value of each seat has been estimated by NASA's Office of Inspector General (OIG) to be around US$55 million. Per-mission cost for the first contract extension (missions 7, 8, and 9) is $258.7 million ($64.6 million/seat), and per-mission cost for the second contract extension (missions 10 through 14) is $288 million ($72 million/seat).
Starliner
Boeing's CST-100 Starliner – "CST" an acronym for "Crew Space Transportation" – measures in diameter and in height. The crew module of Starliner can be reused for up to ten flights, while the service module is expended during each flight. Various engines manufactured by Aerojet Rocketdyne for orbital maneuvering, attitude control, reaction control, and launch escape, are utilized by Starliner. Eight reaction control engines on the spacecraft's crew module and 28 reaction control engines on the spacecraft's service module provide and each, respectively.
Also located on the service module, 20 custom-made Orbital Maneuvering and Attitude Control (OMAC) engines provide of thrust each, while four RS-88 engines provide of thrust each in a launch abort scenario. During a nominal flight without a launch abort, Starliner can use unspent fuel reserved for its RS-88 engines to help its OMAC engines perform the orbital insertion burn, following separation from the Centaur upper stage during launch. Once in space, Starliner spacecraft can survive up to 60 hours in free flight.
Unlike Crew Dragon, Starliner is designed to return to Earth on land instead of ocean, using airbags to cushion the vehicle's impact with the ground. Four sites in the western contiguous United States – the Dugway Proving Ground in Utah, Edwards Air Force Base in California, White Sands Missile Range in New Mexico, and Willcox Playa in Arizona – will serve as landing ranges for returning Starliner spacecraft, though in an emergency scenario, it is also equipped to perform a splashdown return.
Boeing's CCtCap contract values each seat on a CST-100 flight to be between US$91–99 million, while the face value of each seat has been estimated by NASA's OIG to be around US$90 million.
Crew Dragon Missions
SpaceX's Crew-1 mission, the first operational flight in the program, carried Victor Glover, Mike Hopkins, Soichi Noguchi, and Shannon Walker to the ISS in November 2020 aboard Resilience. Resilience was originally planned to be used for Crew-2, but was reassigned following a scheduling change resulting from the accidental destruction of C204 during testing.
While NASA astronauts were given assignments to either Crew Dragon or Starliner flights, Noguchi – a JAXA astronaut – was open for assignment to whichever spacecraft would launch the first operational mission. With Chris Cassidy having arrived at the ISS during Soyuz MS-16, the arrival of the astronauts aboard Resilience marked the first time since the Space Shuttle program in which the US Orbital Segment of the ISS was completely staffed with four crew.
Crew-2 launched in April 2021, using a previously-flown Falcon 9 first-stage booster and a refurbished Crew Dragon for the first time. The mission carried Shane Kimbrough, Megan McArthur, Akihiko Hoshide and Thomas Pesquet aboard Endeavour. Crew-3 launched in November 2021, carrying Thomas Marshburn, Raja Chari, Matthias Maurer and Kayla Barron to the ISS, and Crew-4 launched Kjell Lindgren, Bob Hines, Samantha Cristoforetti and Jessica Watkins in April 2022.
US astronauts Josh Cassada, Nicole Aunapu Mann and JAXA astronaut Koichi Wakata initially assigned to Starliner crewed flights were reassigned to Crew-5 mission after delays in the Starliner program. The fourth astronaut on Crew-5 is filled by a Russian cosmonaut Anna Kikina and thus becoming to be a part of the Soyuz-Dragon crew swap system, that is, keeping at least one NASA astronaut and one Roscosmos cosmonaut on each of the crew rotation missions.
That would ensure both countries would have a presence on the station, and ability to maintain their separate systems, if either Soyuz or commercial crew vehicles are grounded for an extended period. On 3 December 2021, NASA made clear it would secure up to an additional three flights from SpaceX to maintain an uninterrupted U.S. capability for human access to the space station.
The background to this was that SpaceX was likely to launch its sixth flight in early 2023 potentially before Boeing's first operational flight, and NASA concluded that only SpaceX had the capability needed. NASA and Roscosmos agreed to a seat-swapping agreement initially for three flights each, starting with Crew-5 in 2022. A Russian cosmonaut was to fly on one Crew Dragon flight per year while an American astronaut was to fly on one Soyuz flight per year.
This arrangement ensures that ISS will have at least one crew member to operate essential services even if one or the other type of spacecraft is grounded. Starting with Crew-5 a cosmonaut has flown on each CCP Dragon flight and a NASA astronaut has flown on each Soyuz flight. The agreement has been extended to 2027. On 31 August 2022, NASA awarded SpaceX with an additional 5 flights bringing the total number of contracted Crew Dragon flights to 14. The additional flights will run through 2030.
The Crew-8 and Crew-9 missions were both modified in response to the unexpected need to support the crew of the Starliner Boeing Crew Flight Test (CFT), which visited ISS during the Crew-8 mission. Problems with the Starliner caused NASA to extend its mission and ultimately to bring the spacecraft back to Earth without crew. The Crew-8 mission was extended and its Dragon was fitted with two additional makeshift crew seats to allow it to serve as a "lifeboat" for the CFT crew if evacuation had been needed before Crew-9 arrived.
Crew-9 was modified to launch with only two crew members and two empty seats. Its launch was delayed for weeks until Starliner was able to undock from ISS and clear the docking port. When Crew-9 arrived at ISS, the crew of CFT became members of the Crew-9 crew and returned on Crew-9 at the end of its mission.
Boeing Starliner Missions
, the first operational flight has not been scheduled. The Starliner's inaugural Crewed Flight Test launched on June 5, 2024, had several serious problems including helium leaks during transit, five of the eight reaction control system failing during approach to the ISS, and an RCS oxidizer isolation valve failing to close after docking. Ultimately, NASA decided to re-enter Starliner to Earth without its crew, who instead joined SpaceX Crew-9 when it arrived at ISS in September 2024 and returned with it in March 2025.
Due to these problems, Starliner did not receive system certification. NASA continued to evaluate the problems, and in February 2026 announced that the failures constituted a "Type A mishap", the most serious NASA failure classification. NASA and Boeing agreed to modify their contract, and Starliner-1 will fly as an uncrewed cargo mission. If it is successful, Starliner will fly up to three crewed missions.
NASA hopes to extend the seat-swapping arrangement with Roscosmos to include Starliner flights after it has enough flights, which will be no earlier than the Starliner-3 flight. On May 18, 2026, NASA announced its intent to add six commercial crew missions to the Dragon 2, ordering and formally beginning preparations for the first three. These missions would have been Starliner missions. However, the craft is not yet certified so that SpaceX will launch all NASA missions to the ISS until 2030.
It is still possible a crewed Starliner mission to the ISS takes place, as some US Congressmen have called for its retirement to be pushed to 2032.
Operational CCP missions
Timeline
The CCP spacecraft missions usually overlap with brief intervals during which two are docked at the same time. Crew-2 did not overlap with Crew-3 because of an unexpected delay of the Crew-3 launch. Crew-11 returned before Crew-12 arrival due to a Crew-11 medical issue.
Text derived from https://en.wikipedia.org/w/index.php?oldid=1379022330 under CC BY-SA 4.0; modifications have been made.