Compact Linear Collider
≈ 5 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
The Compact Linear Collider (CLIC) is a concept for a future linear particle accelerator that aims to explore the next energy frontier. CLIC would collide electrons with positrons and is currently the only mature option for a multi-TeV linear collider. The accelerator would be between long, more than ten times longer than the existing Stanford Linear Accelerator (SLAC) in California, US.
Impact
CLIC is proposed to be built at CERN, across the border between France and Switzerland near Geneva, with first beams starting by the time the Large Hadron Collider (LHC) has finished operations around 2035. The CLIC accelerator would use a novel two-beam acceleration technique at an acceleration gradient of 100 MV/m, and its staged construction would provide collisions at three centre-of-mass energies up to 3 TeV for optimal physics reach.
Background
Research and development (R&D) are being carried out to achieve the high precision physics goals under challenging beam and background conditions. CLIC aims to discover new physics beyond the Standard Model of particle physics, through precision measurements of Standard Model properties as well as direct detection of new particles. The collider would offer high sensitivity to electroweak states, exceeding the predicted precision of the full LHC programme. The current CLIC design includes the possibility for electron beam polarisation.…
The Compact Linear Collider (CLIC) is a concept for a future linear particle accelerator that aims to explore the next energy frontier. CLIC would collide electrons with positrons and is currently the only mature option for a multi-TeV linear collider. The accelerator would be between long, more than ten times longer than the existing Stanford Linear Accelerator (SLAC) in California, US.
CLIC is proposed to be built at CERN, across the border between France and Switzerland near Geneva, with first beams starting by the time the Large Hadron Collider (LHC) has finished operations around 2035. The CLIC accelerator would use a novel two-beam acceleration technique at an acceleration gradient of 100 MV/m, and its staged construction would provide collisions at three centre-of-mass energies up to 3 TeV for optimal physics reach.
Research and development (R&D) are being carried out to achieve the high precision physics goals under challenging beam and background conditions. CLIC aims to discover new physics beyond the Standard Model of particle physics, through precision measurements of Standard Model properties as well as direct detection of new particles. The collider would offer high sensitivity to electroweak states, exceeding the predicted precision of the full LHC programme. The current CLIC design includes the possibility for electron beam polarisation.
How it works
The CLIC collaboration produced a Conceptual Design Report (CDR) in 2012, complemented by an updated energy staging scenario in 2016. Additional detailed studies of the physics case for CLIC, an advanced design of the accelerator complex and the detector, as well as numerous R&D results are summarised in a recent series of CERN Yellow Reports.
Each Drive Beam complex is composed of a 2.5 km-long linac, followed by a Drive Beam Recombination Complex: a system of delay lines and combiner rings where the incoming beam pulses are interleaved to ultimately form a 12 GHz sequence and a local beam current as high as 100A. Each 2.5 km-long Drive Beam linac is powered by 1 GHz klystrons. This produces a 148 μs-long beam (for the 1.5 TeV energy stage scenario) with a bunching frequency of 0.5 GHz.
Every 244 ns the bunching phase is switched by 180 degrees, i.e. odd and even buckets at 1 GHz are filled alternately. This phase-coding allows the first factor two recombination: the odd bunches are delayed in a Delay Loop (DL), while the even bunches bypass it. The time of flight of the DL is about 244 ns and tuned at the picosecond level such that the two trains of bunches can merge, forming several 244 ns-long trains with bunching frequency at 1 GHz, separated by 244 ns of empty space.
This new time-structure allows for further factor 3 and factor 4 recombination in the following combiner rings with a similar mechanism as in the DL. The final time structure of the beam is made of several (up to 25) 244 ns-long trains of bunches at 12 GHz, spaced by gaps of about 5.5 μs. The recombination is timed such that each combined train arrives in its own decelerator sector, synchronized with the arrival of the Main Beam.
The use of low-frequency (1 GHz), long-pulse-length (148 μs) klystrons for accelerating the Drive Beam and the beam recombination makes it more convenient than using klystrons to directly accelerate the Main Beam. ). The beam travels from left to right.|alt=|280x280px]] Articles and videos on CLIC: CLIC CLICdp CERN CLIC test facility [https://www.youtube.com/watch?v=LKChKOJpml4
Text derived from https://en.wikipedia.org/w/index.php?oldid=1375780714 under CC BY-SA 4.0; modifications have been made.