Crowchild Trail
Crowchild Trail is a major expressway in western Calgary, Alberta.
≈ 3 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
Crowchild Trail is a major expressway in western Calgary, Alberta. The segment from the 12 Mile Coulee Road at the edge of the city to Stoney Trail is designated as Highway 1A by Alberta Transportation; however, prior to the completion of Stoney Trail the Highway 1A designation formerly extended to 16 Avenue NW (Trans-Canada Highway, Highway 1).
The road is a critical north–south link in West Calgary for both downtown-bound traffic and travel between the two quadrants of the city it passes through. Although planned to be one single freeway from Glenmore Trail to the city limits, the route is divided by a section of slow-moving arterial road with four signalized intersections between 24 Avenue and Memorial Drive.
This separates the freeway in the northwest from the freeway south of the Bow River. Filling the gap and making the whole route a minimum six-lane freeway is planned for construction beyond 2027.
Crowchild Trail is a major expressway in western Calgary, Alberta. The segment from the 12 Mile Coulee Road at the edge of the city to Stoney Trail is designated as Highway 1A by Alberta Transportation; however, prior to the completion of Stoney Trail the Highway 1A designation formerly extended to 16 Avenue NW (Trans-Canada Highway, Highway 1).
The road is a critical north–south link in West Calgary for both downtown-bound traffic and travel between the two quadrants of the city it passes through. Although planned to be one single freeway from Glenmore Trail to the city limits, the route is divided by a section of slow-moving arterial road with four signalized intersections between 24 Avenue and Memorial Drive.
This separates the freeway in the northwest from the freeway south of the Bow River. Filling the gap and making the whole route a minimum six-lane freeway is planned for construction beyond 2027.
Major intersections
From south to north, the following intersections are observed along Crowchild Trail.
Gallery
File:Arbor Lake-Aerial.JPG|Crowchild Trail at the interchange with Stoney Trail File:Bow River Calgary 2.jpg|Bridge over Bow River File:TuscanyRockyRidgeStubs.JPG|C-Train tracks along Crowchild Trail File:Crowchildtrail.jpg|Looking south just north of 5 Ave NW
See also
Highway 1A Transportation in Calgary
External links
Crowchild Trail Upgrades - City of Calgary
Text derived from https://en.wikipedia.org/w/index.php?oldid=1375241691 under CC BY-SA 4.0; modifications have been made.