CryoSat-2

CryoSat-2 is a European Space Agency (ESA) Earth Explorer Mission that launched on April 8, 2010.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 5 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

CryoSat-2 is a European Space Agency (ESA) Earth Explorer Mission that launched on April 8, 2010. CryoSat-2 is dedicated to measuring polar sea ice thickness and monitoring changes in ice sheets. Its primary objective is to measure the thinning of Arctic sea ice, but has applications to other regions and scientific purposes, such as Antarctica and oceanography.

CryoSat-2 was built as a replacement for CryoSat-1, which failed to reach orbit following a launch failure in October 2005. CryoSat-2 was successfully launched five years later in 2010, with upgraded software aiming to measure changes in ice thickness to an accuracy of ~10% of the expected interannual variation.

Unlike previous satellite altimetry missions, CryoSat-2 provides unparalleled Arctic coverage, reaching 88˚N (previous missions were limited to 81.5˚N). The primary payload of the mission is a synthetic aperture radar (SAR) Interferometric Radar Altimeter (SIRAL), which measures surface elevation. By subtracting the difference between the surface height of the ocean and the surface height of sea ice, the sea ice freeboard (the portion of ice floating above the sea surface) can be calculated.

Freeboard can be converted to sea ice thickness by assuming the sea ice is floating in hydrostatic equilibrium. CryoSat-2 is part of ESA's wider CryoSat mission in the Living Planet Programme.…

CryoSat-2 is a European Space Agency (ESA) Earth Explorer Mission that launched on April 8, 2010. CryoSat-2 is dedicated to measuring polar sea ice thickness and monitoring changes in ice sheets. Its primary objective is to measure the thinning of Arctic sea ice, but has applications to other regions and scientific purposes, such as Antarctica and oceanography.

CryoSat-2 was built as a replacement for CryoSat-1, which failed to reach orbit following a launch failure in October 2005. CryoSat-2 was successfully launched five years later in 2010, with upgraded software aiming to measure changes in ice thickness to an accuracy of ~10% of the expected interannual variation.

Unlike previous satellite altimetry missions, CryoSat-2 provides unparalleled Arctic coverage, reaching 88˚N (previous missions were limited to 81.5˚N). The primary payload of the mission is a synthetic aperture radar (SAR) Interferometric Radar Altimeter (SIRAL), which measures surface elevation. By subtracting the difference between the surface height of the ocean and the surface height of sea ice, the sea ice freeboard (the portion of ice floating above the sea surface) can be calculated.

Freeboard can be converted to sea ice thickness by assuming the sea ice is floating in hydrostatic equilibrium. CryoSat-2 is part of ESA's wider CryoSat mission in the Living Planet Programme.

The spacecraft was constructed by EADS Astrium, and launched by ISC Kosmotras using a Dnepr carrier rocket. ; CryoSat-2 is designed to study Earth's polar ice caps|alt=Satellite photograph of a large white ice cap in a dark blue ocean]] The initial proposal for the CryoSat programme was submitted as part of a call for proposals in July 1998 for Earth Explorer missions as part of the European Space Agency's Living Planet programme. It was selected for further studies in 1999, and following completion of a feasibility study the mission was authorised.

The construction phase began in 2001, and in 2002 EADS Astrium was awarded a contract to build the spacecraft. A contract was also signed with Eurockot, to conduct the launch of the satellite using a Rokot/Briz-KM carrier rocket. Construction of the original spacecraft was completed in August 2004.

Following testing, the spacecraft was shipped to the Plesetsk Cosmodrome in Russia during August 2005 and arrived on 1 September. The launch occurred from Site 133/3 on 8 October; however, due to a missing command in the rocket's flight control system, the second-stage engine did not shut down at the end of its planned burn, and instead the stage burned to depletion.

This prevented the second stage and Briz-KM from separating, and as a result the rocket failed to achieve orbit. The spacecraft was lost when it reentered over the Arctic Ocean, north of Greenland. Due to the importance of the CryoSat mission for understanding global warming and reductions in polar ice caps, a replacement satellite was proposed.

The development of CryoSat-2 was authorised in February 2006, less than five months after the failure. CryoSat successfully achieved its mission objectives following the launch of CryoSat-2.

CryoSat pages at ESA CryoSat on ESA Earth Online CryoSat on ESA eoportal

Text derived from https://en.wikipedia.org/w/index.php?oldid=1378634641 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

25 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.