Lesson plan
Cycleway 4
Cycleway 4 is a fully segregated cycle path in London originally planned to run from Tower Bridge to Woolwich and coordinated by Transport for London. First proposed in 2008 but first consulted on as Cycle Superhighway 4 between Tower Bridge and Greenwich in 2017, the cycle lane has been in lengthy development. The section from Tower Bridge to Rotherhithe Roundabout, and the section on Evelyn Street and Creek Road, has been built as a permanent scheme. In response to the COVID-19 pandemic, TfL have extended Cycleway 4 in multiple places. Temporary, lightly segregated lanes using wands have been created on London Bridge, which has also been restricted to buses and cyclists only from 7am to 7pm, Monday to Friday. An extension of Cycleway 4 on Tooley Street and Duke Street Hill has been constructed to connect this to the permanent section at Tower Bridge. At the other end of the planned route, a temporary extension from the Royal Naval College, Greenwich, to Angerstein Roundabout has been built using light segregation, which is being extended again to Anchor and Hope Lane. The future permanent construction of the other segments of the cycleway depends on TfL's healthy streets budget, which has had a £300 million decrease in available money due to the COVID-19 pandemic.
Article summary
Cycleway 4 is a fully segregated cycle path in London originally planned to run from Tower Bridge to Woolwich and coordinated by Transport for London. First proposed in 2008 but first consulted on as Cycle Superhighway 4 between Tower Bridge and Greenwich in 2017, the cycle lane has been in lengthy development. The section from Tower Bridge to Rotherhithe Roundabout, and the section on Evelyn Street and Creek Road, has been built as a permanent scheme. In response to the COVID-19 pandemic, TfL have extended Cycleway 4 in multiple places. Temporary, lightly segregated lanes using wands have been created on London Bridge, which has also been restricted to buses and cyclists only from 7am to 7pm, Monday to Friday. An extension of Cycleway 4 on Tooley Street and Duke Street Hill has been constructed to connect this to the permanent section at Tower Bridge. At the other end of the planned route, a temporary extension from the Royal Naval College, Greenwich, to Angerstein Roundabout has been built using light segregation, which is being extended again to Anchor and Hope Lane. The future permanent construction of the other segments of the cycleway depends on TfL's healthy streets budget, which has had a £300 million decrease in available money due to the COVID-19 pandemic.
Key claims
No claims recorded.
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
No sources recorded.
Key claims and bibliography are generated from the same tracked claims and sources as the article page.