Cyclone Maila
≈ 7 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
Severe Tropical Cyclone Maila was a very erratic and exceptionally rare tropical cyclone in the Australian region, becoming the first tropical cyclone to be named by the Tropical Cyclone Warning Center in Port Moresby, Papua New Guinea since Cyclone Guba in 2007. It was also the strongest tropical cyclone in the Port Moresby's area of responsibility in recorded history. Maila was the twenty-third tropical low, eleventh tropical cyclone, and seventh severe tropical cyclone of the 2025–26 Australian region cyclone season.
The origins of Maila stemmed from a tropical low, designated 37U by the Bureau of Meteorology, which was first designated on 2 April, located between Papua New Guinea and Solomon Islands. The tropical low crossed the 155th meridian east into Port Moresby's area of responsibility on 4 April, where it would begin to consolidate, being given the name Maila. Later that day and was upgraded to a Category 1 cyclone on the Australian scale.
Maila began to quickly strengthen while moving sluggishly and erratically, and by the next day, the cyclone was upgraded to a Category 3 severe tropical cyclone, or a Category 1 on the Saffir-Simpson scale.…
Severe Tropical Cyclone Maila was a very erratic and exceptionally rare tropical cyclone in the Australian region, becoming the first tropical cyclone to be named by the Tropical Cyclone Warning Center in Port Moresby, Papua New Guinea since Cyclone Guba in 2007. It was also the strongest tropical cyclone in the Port Moresby's area of responsibility in recorded history. Maila was the twenty-third tropical low, eleventh tropical cyclone, and seventh severe tropical cyclone of the 2025–26 Australian region cyclone season.
The origins of Maila stemmed from a tropical low, designated 37U by the Bureau of Meteorology, which was first designated on 2 April, located between Papua New Guinea and Solomon Islands. The tropical low crossed the 155th meridian east into Port Moresby's area of responsibility on 4 April, where it would begin to consolidate, being given the name Maila. Later that day and was upgraded to a Category 1 cyclone on the Australian scale.
Maila began to quickly strengthen while moving sluggishly and erratically, and by the next day, the cyclone was upgraded to a Category 3 severe tropical cyclone, or a Category 1 on the Saffir-Simpson scale. Over the next few days, Maila would slowly drift eastward whilst maintaining Category 3 status on the Australian scale, by 7 April, the cyclone would resume its intensification, reaching Category 4 status on the Australian scale, or Category 3 on the Saffir-Simpson scale.
Its rapid intensification would continue into the next morning, where it achieved Category 5 status on the Australian scale and Category 4 on the Saffir-Simpson scale.
Meteorological history
On 2 April, Tropical Low 37U formed in the northeastern Coral Sea, between Papua New Guinea and Solomon Islands. On 4 April, the system crossed 155°E into the area of responsibility of TCWC Port Moresby and was given the name Maila. Maila was the first tropical cyclone to be named by TCWC Port Moresby since Cyclone Guba in 2007. Just to the north of the equator, Typhoon Sinlaku formed as a twin cyclone to Maila, forming from the same moisture and wind patterns along with Cyclone Vaianu in the east.
Rapid strengthening and gradual northwestward movement occurred throughout the remainder of the day. By 5 April, Maila intensified and reached Category 3 status on the Australian scale, or Category 1 on the Saffir-Simpson scale. Followed by that, Maila's intensification would slow down and begin to fluctuate for the next two days as it drifted to the east. Intensification resumed on 7 April where it was upgraded to a Category 4 cyclone on the Australian scale (Category 3 on the Saffir-Simpson scale).
By the next morning, Maila had rapidly intensified into a Category 5 cyclone on the Australian scale (Category 4 on the Saffir-Simpson scale), albeit the eastern periphery of the storm's structure began to become uneven due to its own oceanic upwelling and was eventually reclassified as an ex-tropical cyclone on 11 April, with the cloud tops dissipated after upwelling. of the Earth through a window captures Cyclone Maila (center) shortly after becoming a tropical low, as well as the disturbance that would eventually become Cyclone Vaianu (far left), during the Artemis II mission. over the Solomon Sea on 7 April Maila was automatically retired as per usual for systems named by the Port Moresby TCWC.
Preparations and impact
Responses
Australia has offered A$2.5 million in aid to support the clean-up effort in the nation, with foreign minister Penny Wong announcing A$1 million for impacts in Bougainville and Milne Bay. A provincial relief team for Milne Bay was organized in the aftermath. HMPNGS Rochus Lokinap, HMPNGS Francis Agwi, HMPNGS Agiwau, and HMPNGS Lokinap were dispatched to Alotau with relief supplies.
The Papua New Guinea Red Cross Society began prioritizing access in hard-to-access, heavily impacted areas such as Bougainville and Milne Bay, though noted that access could take two to three days. By late April 2026, New Zealand delivered a NZ$3 million aid support package to Solomon Islands and Papua New Guinea. In addition, New Zealand Defence Force personnel and aircraft distributed humanitarian relief supplies, tools, medical equipment and power generators to cyclone-affected communities in both countries.
A Royal New Zealand Air Force P8-A Poseidon also conducted survey flights in cyclone-damage parts of Solomon Islands on behalf of the Solomons government. New Zealand Police personnel stationed in Bougainville Island also assisted local authorities with evacuating the wounded, purchasing emergency water supplies and transporting Red Cross members to isolated communities. The Ministry of Foreign Affairs and Trade also partnered with Papuan and New Zealand NGOs to provide disaster relief and early recovery efforts.
Naming, records, and retirement
The name Maila was retired by the World Meteorological Organization. Tropical cyclones that form in TCWC Port Moresby's Area of Responsibility are assigned a certain name only once, as they are automatically removed after their usage. Maila was the first tropical cyclone to be assigned a name from Port Moresby's name lists since Cyclone Guba in 2007. It was also the most powerful tropical cyclone in Port Moresby’s area of responsibility. Overall, Maila was the eighth name to be used (and retired) from Port Moresby's naming list after Manu, Agi, Aivu, Adel, Upia, Epi and Guba.
See also
Weather of 2026 Tropical cyclones in 2026
Text derived from https://en.wikipedia.org/w/index.php?oldid=1378655468 under CC BY-SA 4.0; modifications have been made.