Lesson plan

Cyclone Peter

Severe Tropical Cyclone Peter was at the time, the wettest tropical cyclone on record in Australia, until it was surpassed by Cyclone Jasper in 2023. The third system and first severe tropical cyclone of the 1978–79 season, Peter developed on 29 December from a weak low pressure area over the Gulf of Carpentaria. Peter moved southeastward and deepened while brushing Arnhem Land. Initially a tropical low, it strengthened into a Category 1 cyclone by 12:00 UTC on 29 December. Peter intensified further on 30 December and became a Category 2 cyclone. On the following day, the cyclone peaked with maximum sustained winds of 110 km/h (70 mph). Peter weakened to a Category 1 cyclone before making landfall near the mouth of the Edward River in Queensland. While crossing the Cape York Peninsula, the storm weakened slowly. After reaching Pacific Ocean near Cooktown, the storm decelerated and meandered offshore, but dissipated just offshore on 4 January. While trekking slowly offshore the east coast of Queensland, the storm dropped very heavy rainfall, peaking at at Mount Bellenden Ker, making it the wettest tropical cyclone on record in Australia at the time. Severe flooding occurred, especially in the Cairns area. The most severe damage was dealt to sugar cane, which suffered 70 to 90 percent destruction. Some flights were canceled at the Cairns Airport due to standing water.…

Back to article

Article summary

Severe Tropical Cyclone Peter was at the time, the wettest tropical cyclone on record in Australia, until it was surpassed by Cyclone Jasper in 2023. The third system and first severe tropical cyclone of the 1978–79 season, Peter developed on 29 December from a weak low pressure area over the Gulf of Carpentaria. Peter moved southeastward and deepened while brushing Arnhem Land. Initially a tropical low, it strengthened into a Category 1 cyclone by 12:00 UTC on 29 December. Peter intensified further on 30 December and became a Category 2 cyclone. On the following day, the cyclone peaked with maximum sustained winds of 110 km/h (70 mph). Peter weakened to a Category 1 cyclone before making landfall near the mouth of the Edward River in Queensland. While crossing the Cape York Peninsula, the storm weakened slowly. After reaching Pacific Ocean near Cooktown, the storm decelerated and meandered offshore, but dissipated just offshore on 4 January. While trekking slowly offshore the east coast of Queensland, the storm dropped very heavy rainfall, peaking at at Mount Bellenden Ker, making it the wettest tropical cyclone on record in Australia at the time. Severe flooding occurred, especially in the Cairns area. The most severe damage was dealt to sugar cane, which suffered 70 to 90 percent destruction. Some flights were canceled at the Cairns Airport due to standing water.…

Key claims

  1. area: 90 percent — source: Wikipedia, revision 1357429773, retrieved 2026-10-20 · confidence 0.95

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. The record states that the area is "90 percent". What evidence would count against this claim?
  3. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  4. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

  1. Wikipedia, “Cyclone Peter”, revision 1357429773, retrieved 2026-10-20 https://en.wikipedia.org/w/index.php?oldid=1357429773

Key claims and bibliography are generated from the same tracked claims and sources as the article page.