In telecommunications, electronics and the electrical power industry, the term demand factor is used to refer to the fractional amount of some quantity being used relative to the maximum amount that could be used by the same system.

Uses your system voice; voice and rate in settings.

≈ 4 min read

Cite, export and learn8 citation formats · 8 exports · lesson and quiz

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

In telecommunications, electronics and the electrical power industry, the term demand factor is used to refer to the fractional amount of some quantity being used relative to the maximum amount that could be used by the same system. The demand factor is always less than or equal to one. As the amount of demand is a time dependent quantity so is the demand factor.

fDemand(t)=DemandMaximum possible demand

The demand factor is often implicitly averaged over time when the time period of demand is understood by the context.

Electrical engineering

edit edit source

In electrical engineering the demand factor is taken as a time independent quantity where the numerator is taken as the maximum demand in the specified time period instead of the averaged or instantaneous demand.

fDemand=Maximum load in given time periodMaximum possible load

This is the peak in the load profile divided by the full load of the device.

Example: If a residence has equipment which could draw 6,000 W when all equipment was drawing a full load, drew a maximum of 3,000 W in a specified time, then the demand factor = 3,000 W / 6,000 W = 0.5

This quantity is relevant when trying to establish the amount of load for which a system should be rated. In the above example, it would be unlikely that the system would be rated to 6,000 W, even though there may be a slight possibility that this amount of power can be drawn. This is closely related to the load factor which is the average load divided by the peak load in a specified time period.

fLoad=Average loadMaximum load in given time period

See also

edit edit source

References

edit edit source Electricity deliveryConcepts Sources Generation Transmission
and distribution Failure modes Protective
devices Economics
and policies Statistics and
production

Text derived from https://en.wikipedia.org/w/index.php?oldid=1244036648 under CC BY-SA 4.0; modifications have been made.

Words in each sectionElectrical engineeringElectrical engineeringElectrical engineering: 189 words189See alsoSee alsoSee also: 14 words14
Words in each section. Measured from the stored article body; sections below the minimum are not plotted.

Provenance

snapshot enwiki-001244036648 · captured 2024-09-04 · ledger · version history

Cite this page as: encyclopegia.org, “Demand factor”, snapshot enwiki-001244036648. https://encyclopegia.org/a/demand-factor

Sources cited in this revision

No external citation was extracted for this revision. That is a statement about the source, not a claim that none exists.