Lesson plan

DSDP 367

The DSDP 367 was an area that was drilled as part of the Deep Sea Drilling Project that took place below the Cape Verde Basin.

Back to article

Article summary

The DSDP 367 was an area that was drilled as part of the Deep Sea Drilling Project that took place below the Cape Verde Basin.

Key claims

  1. area: 250 meters — source: Wikipedia, revision 1241472845, retrieved 2026-10-20 · confidence 0.95

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. The record states that the area is "250 meters". What evidence would count against this claim?
  3. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  4. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

  1. Wikipedia, “DSDP 367”, revision 1241472845, retrieved 2026-10-20 https://en.wikipedia.org/w/index.php?oldid=1241472845

Key claims and bibliography are generated from the same tracked claims and sources as the article page.