East Side Access (ESA) is a completed public works project in New York City that extended the Long Island Rail Road (LIRR) two miles from its Main Line in Queens to the new Grand Central Madison station under Grand Central Terminal on…

Uses your system voice; voice and rate in settings.

Snapshot

≈ 7 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

East Side Access (ESA) is a completed public works project in New York City that extended the Long Island Rail Road (LIRR) two miles from its Main Line in Queens to the new Grand Central Madison station under Grand Central Terminal on Manhattan's East Side. Previously, the only Manhattan stop for trains from Long Island was Pennsylvania Station, on the west side of the island.

The new station and tunnels opened with limited service to Jamaica station in Queens on January 25, 2023, before full service began the following month, on February 27. Built by the Metropolitan Transportation Authority (MTA), the project was originally scheduled to open in 2009 but was delayed by more than a decade.

The estimated cost of the project rose over threefold from to , making it one of the world's most expensive underground rail-construction projects. The new LIRR terminal contains eight tracks and four platforms in a two-level station below street level.

It was built in conjunction with several other LIRR expansion projects, including the construction of a third track along the Main Line between Floral Park and Hicksville. The project was intended to remove or reduce the need for subway transfers for a large number of riders with jobs on the east side of Manhattan.…

East Side Access (ESA) is a completed public works project in New York City that extended the Long Island Rail Road (LIRR) two miles from its Main Line in Queens to the new Grand Central Madison station under Grand Central Terminal on Manhattan's East Side. Previously, the only Manhattan stop for trains from Long Island was Pennsylvania Station, on the west side of the island.

The new station and tunnels opened with limited service to Jamaica station in Queens on January 25, 2023, before full service began the following month, on February 27. Built by the Metropolitan Transportation Authority (MTA), the project was originally scheduled to open in 2009 but was delayed by more than a decade.

The estimated cost of the project rose over threefold from to , making it one of the world's most expensive underground rail-construction projects. The new LIRR terminal contains eight tracks and four platforms in a two-level station below street level.

It was built in conjunction with several other LIRR expansion projects, including the construction of a third track along the Main Line between Floral Park and Hicksville. The project was intended to remove or reduce the need for subway transfers for a large number of riders with jobs on the east side of Manhattan.

East Side Access was based on transit plans from the 1950s, though an LIRR terminal on Manhattan's East Side was first proposed in 1963. The planned LIRR line was included in the 1968 Program for Action of transit improvements in the New York City area. Lack of funds prevented the construction of any part of the connection other than the 63rd Street Tunnel under the East River.

Plans for the LIRR connection were revived in the late 1990s. The project received federal funding in 2006, and construction began the following year. The tunnels on the Manhattan side were dug from 2007 to 2011, and the connecting tunnels on the Queens side were completed in 2012.

Afterward, work began on other facilities related to the line, such as new platforms at Grand Central, ventilation and ancillary buildings, communication and utility systems, and supporting rail infrastructure in Queens. The project's completion was delayed several times during construction.

Timetable overhaul

In anticipation of the completion of East Side Access and related projects, in 20221, the MTA overhauled LIRR timetables for the first time in more than 30 years. On June 2, 2022, the MTA released draft timetables that LIRR president Catherine Rinaldi pronounced "revolutionary", saying, "In one stroke, we are increasing service by 40%."

The public was invited to comment on the proposed changes at a virtual public meeting on July 13, 2022; after hundreds of people registered to speak, two more such meetings were added. These meetings notwithstanding, MTA officials said in December that the late-June draft would be implemented when Grand Central Madison opened for full service.

The revised timetables proposed a substantial increase in reverse-peak and off-peak service on most branches. This included half-hourly off-peak service on the Main Line to and from Ronkonkoma (increased from hourly) and hourly off-peak service on the West Hempstead Branch (increased from bihourly).

Additionally, due to the simultaneous completion of the Main Line Third Track project, reverse-peak service gaps of over 90 minutes along the Main Line were eliminated. Additionally, most branches received service to both Manhattan terminals, with a considerable increase in the total number of trains to and from Manhattan during peak hours.

The inconsistent service patterns of most branches were also restructured into simpler patterns with western zones (closer to New York City) and eastern zones (away from New York City). The draft timetables called for more evenly spaced trains. The timetables were also designed to accommodate repairs to the East River Tunnels to Penn Station following damage from Hurricane Sandy in 2012.

The reduction of tunnel capacity (from four to three operational tunnels) during renovation, resulting in the need to share additional track space with Amtrak and NJ Transit, was cited as a reason for reduction in service to Penn Station in the draft timetables. , renovation work was expected to begin no earlier than 2024 and take about three years to complete.

Implementation of changes

A shuttle service, Grand Central Direct, operated between Grand Central Madison and Jamaica between January 25 and February 26, 2023. Grand Central Direct trains ran hourly during rush hours in the peak direction stopping at Woodside.

Midday and weekend trains operated half-hourly, with one train making stops at Kew Gardens, Forest Hills, and Woodside, and one train running nonstop between Jamaica and Grand Central. On weekdays, the first train left Jamaica at 6:17 am, with the last train leaving Grand Central at 8:04 pm. Trains ran on weekends between 7 a.m. and 10 pm.

On February 8, 2023, the MTA announced that new timetables featuring full service to Grand Central Madison would come into effect on February 27, which were largely unchanged from the draft timetables released in June 2022. Full service was implemented as scheduled on February 27, 2023.

After full service was implemented, many riders reported that their trains were delayed and overcrowded. In particular, almost all commuters traveling to or from Brooklyn—who constituted 8 to 12 percent of morning rush-hour riders—had to transfer at Jamaica.

These commuters reported that the new schedules either did not give them enough time to transfer, or forced them to wait for long periods. In addition, although the MTA had predicted that 40 percent of riders would travel to Grand Central Madison, only 30 percent ended up doing so.

In response to these complaints, the MTA added trips and lengthened existing trains to and from Brooklyn, and they also lengthened trains to and from Penn Station. By November 2023, about two out of five LIRR commuters to Manhattan were traveling through Grand Central Madison.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1376006003 under CC BY-SA 4.0; modifications have been made.

References

1 claim could not be tied to a specific sentence and is listed in the table below instead.

  1. ↩Wikipedia “East Side Access” revision 1376006003 · retrieved 2026-10-20 release date (×1) · confidence 0.95 revision URL