Eastside Trail

The Eastside Trail is a walking and biking trail running roughly north-south through the Eastside of Atlanta, forming part of the Beltline ring of trails and parks.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 4 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The Eastside Trail is a walking and biking trail running roughly north-south through the Eastside of Atlanta, forming part of the Beltline ring of trails and parks. It is lined with numerous notable industrial buildings adapted into restaurants, shops, apartments, condos, and two major food halls and mixed-use developments.

The corridor between Ponce City Market and the Old Fourth Ward is frequently cited as the busiest stretch of the Beltline trail network, drawing heavy foot and bike traffic especially on weekends. The first stretch opened in October 2012, from Piedmont Park to the Krog Street Tunnel. It was extended from Krog Street to Kirkwood Avenue in November 2017.

A second extension brought it to Memorial Drive in July 2019. Memorial Drive is no longer the trail's southern endpoint; the path continues south into Reynoldstown, where it connects to the Southeast Trail toward Glenwood Park. At its northern end, the Eastside Trail meets the Northeast Trail at the intersection of 10th Street and Monroe Drive.

Northeast Trail – Segment 1, a 0.9-mile section running through Piedmont Park from Monroe Drive to Westminster Drive, opened in late 2024 after groundbreaking in August 2023, providing a continuous paved connection from the Eastside Trail through the park toward Ansley Park, Piedmont Heights, and ultimately the Lindbergh MARTA station once later segments are complete.…

The Eastside Trail is a walking and biking trail running roughly north-south through the Eastside of Atlanta, forming part of the Beltline ring of trails and parks. It is lined with numerous notable industrial buildings adapted into restaurants, shops, apartments, condos, and two major food halls and mixed-use developments.

The corridor between Ponce City Market and the Old Fourth Ward is frequently cited as the busiest stretch of the Beltline trail network, drawing heavy foot and bike traffic especially on weekends. The first stretch opened in October 2012, from Piedmont Park to the Krog Street Tunnel. It was extended from Krog Street to Kirkwood Avenue in November 2017.

A second extension brought it to Memorial Drive in July 2019. Memorial Drive is no longer the trail's southern endpoint; the path continues south into Reynoldstown, where it connects to the Southeast Trail toward Glenwood Park. At its northern end, the Eastside Trail meets the Northeast Trail at the intersection of 10th Street and Monroe Drive.

Northeast Trail – Segment 1, a 0.9-mile section running through Piedmont Park from Monroe Drive to Westminster Drive, opened in late 2024 after groundbreaking in August 2023, providing a continuous paved connection from the Eastside Trail through the park toward Ansley Park, Piedmont Heights, and ultimately the Lindbergh MARTA station once later segments are complete. A separate project along Ponce de Leon Avenue, part of a broader streetscape improvement effort, added a new elevated access ramp linking the Eastside Trail directly to Ponce de Leon Avenue near Ponce City Market at the northwestern corner of the Ponce de Leon Avenue bridge.

More than a decade in planning, the ramp opened to the public in November 2025, following the Atlanta Beltline's announcement in late October 2025 that the associated Ponce de Leon Avenue streetscape project was complete.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1359849196 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

12 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.