Enbridge
≈ 14 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
Enbridge Inc. is a Canadian pipeline and energy company headquartered in Calgary, Alberta, Canada. Enbridge owns and operates pipelines throughout Canada and the United States, transporting crude oil, natural gas, and natural gas liquids, and also generates renewable energy. Enbridge's pipeline system is the longest in North America and the largest oil export pipeline network in the world. Its crude oil system consists of 28,661 kilometres (17,809 miles) of pipelines.
Its 38,300 kilometre (23,800 mile) natural gas pipeline system connects multiple Canadian provinces, several US states, and the Gulf of Mexico. The company was formed by Imperial Oil in 19491 as the Interprovincial Pipe Line Company Limited to transport Alberta oil to refineries. Over time, it has grown through acquisition of other existing pipeline companies and the expansion of their projects.
Enbridge has been responsible for several oil spills, including the Line 3 oil spill, which was the largest inland oil spill in the US, and the Kalamazoo River oil spill, which was another major inland oil spill in the US.
Enbridge Inc. is a Canadian pipeline and energy company headquartered in Calgary, Alberta, Canada. Enbridge owns and operates pipelines throughout Canada and the United States, transporting crude oil, natural gas, and natural gas liquids, and also generates renewable energy. Enbridge's pipeline system is the longest in North America and the largest oil export pipeline network in the world. Its crude oil system consists of 28,661 kilometres (17,809 miles) of pipelines.
Its 38,300 kilometre (23,800 mile) natural gas pipeline system connects multiple Canadian provinces, several US states, and the Gulf of Mexico. The company was formed by Imperial Oil in 1949 as the Interprovincial Pipe Line Company Limited to transport Alberta oil to refineries. Over time, it has grown through acquisition of other existing pipeline companies and the expansion of their projects.
Enbridge has been responsible for several oil spills, including the Line 3 oil spill, which was the largest inland oil spill in the US, and the Kalamazoo River oil spill, which was another major inland oil spill in the US.
History
terminal delivers crude oil to the Co-op Refinery Complex]] The company was initially incorporated by Imperial Oil as Interprovincial Pipe Line Company (IPL) on April 30, 1949, after Canada's first major oil discovery, in 1947, at Leduc, Alberta. In the same year, the company built its first oil pipeline from Leduc to Regina, Saskatchewan. In 1950, it was expanded through Gretna, Manitoba, to Superior, Wisconsin, in the United States.
To operate the United States portion of the pipeline, the Lakehead Pipe Line Company (now Enbridge Energy Partners) was created. In 1953, the pipeline was expanded to Sarnia, Ontario, and in 1956 to Toronto and Buffalo, New York. In 1953, IPL was listed on the Toronto and Montreal stock exchanges. In 1983, IPL built the Norman Wells pipeline and joined Frontier Pipeline Company. In 1986, through a series of stakes exchanges, IPL gained control of Home Oil and in 1988, it changed its name to Interhome Energy Inc.
In 1991, it changed its name to Interprovincial Pipe Line Inc. In 1992, Interprovincial Pipe Line Inc. was acquired by Interprovincial Pipe Line System Inc., which changed its name to IPL Energy Inc. in 1994, after the acquisition of Consumers' Gas (now Enbridge Gas Inc.) and diversification into the gas distribution business. In addition, it acquired stakes in AltaGas Services and the electric utility of Cornwall, Ontario. Through the 1990s, the company expanded its gas pipeline network and acquired a stake in the Chicap oil pipeline.
It also built the Athabasca Pipeline from northeastern Alberta to the main pipeline system. In 1995, the company expanded its activities outside of North America by taking a stake in the Ocensa pipeline. This stake was sold in 2009. IPL Energy became Enbridge Inc in 1998. The Enbridge name is a portmanteau from "energy" and "bridge". In the 2000s, Enbridge introduced several large projects. Enbridge made their first investment into renewable energy in 2002 with the purchase of a wind farm.
In 20061, it announced the Enbridge Northern Gateway Pipelines Project from Athabasca to Kitimat, British Columbia. The same year, it announced the Alberta Clipper pipeline project from Hardisty, Alberta, to Superior, Wisconsin, to connect oil sands production area with the existing network. This pipeline became operational in 2010. In 2009, Enbridge bought the Sarnia Photovoltaic Power Plant and expanded it up to 80 MW, which was the world's largest photovoltaic power station at that time.
In January 2017, Enbridge acquired Midcoast Energy Partners for $170 million in cash, and later in 2018, ArcLight acquired Midcoast Operating, L.P. from Enbridge for $1.1 billion. Enbridge released its first annual sustainability report in 20011, and in November 2020, Enbridge expanded its environmental, social and governance (ESG) goals and targets. The company aims to achieve net-zero greenhouse gas emissions by 2050, with an interim target to reduce emissions intensity by 35% by 2030.
That same year, President and CEO Al Monaco said that renewable power is now "the fourth Enbridge platform." Enbridge's ESG goals also aim to diversify its workforce with 28% representation from racial and ethnic groups and 40% from women by 2025. In 2021, Enbridge was recognized as one of Canada's top 100 employers for the 18th time, and as one of Canada's best diversity employers for the seventh time.
In September 2023, it was announced Enbridge had agreed to acquire East Ohio Gas, Questar Gas, and Public Service Co. of North Carolina, from Dominion Energy for a total enterprise value worth $14 billion. The acquisition will result in Enbridge being the largest natural gas utility franchise in North America. In September 2026, Enbridge announces the acquisition of Tallgrass Energy following a $2.55 billion agreement.
Merger with Spectra Energy
On September 6, 2016, Enbridge agreed to buy Spectra Energy in an all-stock deal valued at about $28 billion. Spectra, headquartered in Houston, Texas, operated in three key areas of the natural gas industry: transmission and storage, distribution, and gathering and processing. Spectra was formed in late 2006 as a spin-off from Duke Energy. Spectra owned the Texas Eastern Pipeline (TETCo), a major natural gas pipeline transporting gas from the Gulf of Mexico coast in Texas to the New York City area; TETCo was one of the largest pipeline systems in the United States. Spectra also operated three oil pipelines, numerous other gas pipelines and was proposing to build still 3 more gas pipelines in the U.S. The merger was completed on February 27, 2017.
Operations
Crude oil and liquids pipelines
The company is the largest transporter of crude oil in Canada with 3 million barrels per day of oil and liquids. The Enbridge Pipeline System is the world's longest crude oil and liquids pipeline system, with 27,564 km (17,127 mi) of active crude pipeline in both Canada and the United States. This pipeline network delivers 3 million barrels of oil per day. Enbridge delivered more than 3.77 billion barrels of crude oil in 2020, and more than 29.5 billion barrels over the past decade, from 2011 through 2020 inclusive.
Enbridge has several new capacities and expansion projects, including the expansion of the Alberta Clipper, replacing of Line 6B, reversal of Line 9 and others. Its Light Oil Market Access initiative is a project to deliver light crude oil from North Dakota and Western Canada to refineries in Ontario, Quebec, and the U.S. Midwest. Eastern Access, including a reversal of Line 9, is a project to deliver oil to Western Canada and Bakken to refineries in Eastern Canada and the midwest and eastern U.S.
Western Gulf Coast Access, including reversal and expansion of the Seaway Pipeline and the Flanagan South Pipeline, is a plan to connect Canadian heavy oil supply to refineries along the Gulf Coast of the United States. Enbridge's oil pipelines cross North America, with 13,833 km (8,672 mi) of active pipe in the United States and 13,681 km (8500 mi) of active pipe in Canada. The list below outlines eight of those lines.
Line 1 is a 1,767 km (1,098 mi) pipeline that starts in Enbridge's Edmonton Terminal in Alberta, and runs to its Superior Terminal in Wisconsin. On average, this pipeline delivers 237,000 barrels of light crude, natural gas liquids, and refined products daily. Line 2A is a 966 km (600 mi) pipeline that runs from an Enbridge terminal in Edmonton, Alberta, to its Cromer Terminal in Manitoba. On average, per day this pipeline carries 442,000 barrels of condensates, light crude, and heavy crude.
Line 2B is an 808 km (502 mi) pipeline that runs from the same Cromer Terminal to the Superior Terminal in Wisconsin. That pipeline delivers on average 442,000 barrels of light crude oil per day. Line 3 is a 1,769 km (1,099 mi) pipeline that runs from the Edmonton terminal to the Superior Terminal. Over half (1,070 km) of the pipeline is located in Canada, between Alberta and Manitoba. Per day, the pipeline transports an average of 390,000 barrels of light, medium and heavy crude oil.
Line 4 is a 1,722 km (1,101 mi) crude oil pipeline starting at the Edmonton terminal to the Superior terminal. This pipeline carries, on average, 390,000 barrels of light, medium and heavy crude oil per day. Line 5 is a 1,038 km (645 mi) crude oil pipeline running from the Superior terminal in Wisconsin to Sarnia, Ontario. On average, this pipeline moves 540,000 barrels of natural gas liquids and light crude oil per day. Alberta clipper Pipeline (Line 67) is a 1,790 km (1,112 mi) pipeline that runs from Hardisty, Alberta to Superior, Wisconsin.
An average of 800,000 barrels of heavy crude oil is moved through this pipeline per day. Southern Lights Pipeline (Line 13) is a 2,560 km (1,591 mi) pipeline that runs from Manhattan, Illinois to the Edmonton terminal. This pipeline carries on average, 180,000 barrels of diluent per day.
Natural gas pipelines
Enbridge's pipelines transport 20% of the natural gas consumed in the United States. It owns and operates Canada's largest natural gas distribution network, providing distribution services in Ontario and Quebec. Union Gas in Ontario now fully operates under Enbridge Gas Inc. In Quebec, Enbridge has interest ownership in Gazifère. Enbridge builds, owns and operates a network of natural gas transmission pipelines across North America, connecting the continent's natural gas supply to major markets in Canada, the United States, Mexico, and further abroad. Enbridge's natural gas network currently covers 38,375 km (23,850 mi) across five Canadian provinces, 30 U.S. states, and offshore in the Gulf of Mexico, transporting roughly 16.2 Bcf (billions of cubic feet per day) of natural gas.
Power transmission
In February 2020, Enbridge sold its shares of Montana-Alberta Tie-Line (MATL) to Berkshire Hathaway Energy. The MATL project is a 300-megawatt (MW), 230-kilovolt (kV) electrical transmission line allowing movement of power between Alberta and Montana. The MATL project, which was placed in service the fall of 2013, supports ongoing development of a rich wind-powered generation resource and allows electrical energy to flow in both directions. The transmission line is 210 miles (345 km) long and runs between the Lethbridge, Alberta area and the Great Falls, Montana area. Roughly one-third of the line is in Canada and two-thirds in the U.S.
Protests
In May 2012, West Coast First Nations members and supporters protested near Enbridge's Annual Shareholder's meeting, against the proposed Northern Gateway Project and on May 31, 2012, the Vancouver Observer reported about 40 protesters outside the Canadian Oil and Gas Export Summit, protesting the proposed Enbridge Northern Gateway Project. On July 17, 2012, a group calling itself "We are the Kalamazoo" protested against Enbridge's response to the Kalamazoo spill and its plans to construct the line 6B pipeline.
This protest was on the second anniversary of the Kalamazoo spill. On November 12, 2012, the Lansing State Journal reported that the head of the Line 6B Pipeline project stated that he had never seen as much organized landowner resistance despite 30 years in the pipeline industry. They noted that this was probably because of the 2010 Kalamazoo River spill. In May 2013, Hamilton area residents protested the reversal of flow in Line 9 and temporarily closed Ontario Highway 6.
Later that year, on June 6, 2013, a group called Hamilton 350 sent a letter of complaint to the Hamilton (Ontario) police service (HPS) for accepting over $44,000 in donations from Enbridge. The letter questions whether police officers would be impartial during any anti-Enbridge protests, given the donation. On June 26, 2013, Hamilton Police arrested at least 10 people who occupied an Enbridge compound for six days to protest the expansion of Enbridge's Line 9 and intent to ship diluted bitumen through the line.
On July 22, 2013, a group of protesters locked themselves to equipment at an Enbridge pipeline construction site in Stockbridge, Michigan.
Protesters stated that they had to take matters into their own hands given that state regulators were failing the public, "We felt that there was no other option." A September 16, 2013, "Inside Climate News" report by journalist David Hasemeyer describes how many Michigan landowners are concerned about the safety of new Enbridge pipeline being laid within a few feet of their homes, and the lack of regulations for how close a pipeline can be constructed to an existing home.
The article quotes Richard Kuprewicz, President of an engineering consulting company and an adviser to Pipeline Hazardous Materials Administration: "Clearly the pipeline safety regulations aren't adequate in this area and the siting regulations aren't adequate," Kuprewicz said. "It's a bad combination." In September 2016, a group of Native Americans protested the construction of the Dakota Access Pipeline, which Enbridge had announced plans to acquire a portion of in a $2 billion deal.
In November 2020, Michigan Governor Gretchen Whitmer revoked a 1953 easement for an Enbridge pipeline connecting two parts of the Great Lakes through the Straits of Mackinac. In June 2021, Enbridge resumed construction on the Line 3 replacement project in Northern Minnesota after taking a brief planned break. Enbridge's plans to expand its Line 3 pipeline in Minnesota along a new route have been met with prolonged resistance from Native communities and activists calling themselves water protectors.
In January 2022, a group of about 400 met in front of a Bank of America location in Austin to protest Enbridge's plans to expand the Moda Ingleside Energy Center onto historic Karankawa land in Corpus Christi, Texas. In September, 2023, in a trial flawed by numerous protocol breaches on the part of the prosecution and local authorities, Mylene Vialard was found guilty of felony obstruction.
According to the article, Vialard was among more than a thousand arrests by Minnesota law enforcement – which along with other agencies received at least $8.6m in payments from Enbridge. In 2024, the film Bad River was released. The film documented Enbridge's trespassing on the Bad River reservation with Line 5 and the local community's struggle to get the pipeline removed. It also covered how Enbridge attempted to influence the Bad River tribal elections.
See also
Enbridge Gas New Brunswick Enbridge Line 5 Enbridge Northern Gateway Pipelines Enbridge Pipelines Nautilus Pipeline
References
External links
Enbridge Asset Map (current)
Text derived from https://en.wikipedia.org/w/index.php?oldid=1378074671 under CC BY-SA 4.0; modifications have been made.
References
- ↩Wikipedia “Enbridge” release date (×3) · confidence 0.95 revision URL