EV-E801 series
Japanese battery electric multiple unit train type
≈ 3 min read
Names in other languages
- FrançaisJR East série EV-E801
- 中文JR东日本EV-E801系电力动车组
- DeutschBaureihe EV-E801
- 日本語JR東日本EV-E801系電車
- EnglishEV-E801 series
- mulEV-E801 series
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
The is a two-car battery electric multiple unit (BEMU) train type operated by East Japan Railway Company (JR East) on the Oga Line in Akita Prefecture in northern Japan since 4 March 2017. The train is branded as .
Overview
The train is derived from the experimental 817 series BEMU train developed by JR Kyushu, and will incorporate modifications to cope with the colder climate of Akita Prefecture. The two-car EV-E801 series train operates as an electric multiple unit (EMU) under the 20 kV AC overhead wire of the Ou Main Line between and , a distance of , and on battery power over the non-electrified Oga Line tracks between Oiwake and , a distance of , replacing existing KiHa 40 diesel multiple unit (DMU) trains.
It can also be recharged via its pantograph at a 20 kV AC recharging facility specially built at Oga Station. The EV-E800 car is equipped with lithium-ion storage batteries with a total capacity of 360 kWh (at 1,598 V), and operates at a maximum speed of under overhead wires and at on battery power over non-electrified tracks.
Formation
The two-car train is formed as shown below, with one driving motor ("Mc") and one driving trailer ("Tc") car. The Mc car is fitted with one single-arm pantograph.
Interior
Internally, the train uses LED lighting throughout. Seating accommodation consists of longitudinal bench seating. Both cars have a toilet.
History
Initial details of the new train were formally announced by JR East on 20 November 2015. The train underwent evaluation and proving trials on the Oga Line prior to scheduled services in March 2017. The two-car trainset was delivered from the Hitachi factory in Kudamatsu, Yamaguchi to Akita Depot in December 2016.
On November 2, 2020, two new sets G2 and G3 were delivered from Hitachi and arrived at Akita depot on November 4. The sets were coupled to each other and transported by a freight locomotive. Additionally on November 16, 2020, three more sets G4, G5, and G6 were delivered and arrived at Akita depot two days later.
In December 2023, a winter snowstorm stranded sets G5/G6 in the middle of Oga Line at a passing loop station, requiring a DE10 diesel locomotive to rescue both sets at the same time.
See also
Smart BEST, a self-charging BEMU train developed by Kinki Sharyo in 2012 EV-E301 series, a DC BEMU introduced by JR East on the Karasuyama Line in 2014 BEC819 series, an AC BEMU introduced by JR Kyushu in 2016
External links
JR East news release published 20 November 2015
Text derived from https://en.wikipedia.org/w/index.php?oldid=1330766967 under CC BY-SA 4.0; modifications have been made.
References
1 claim could not be tied to a specific sentence and is listed in the table below instead.