Lesson plan

Florence Bridge

The Florence Bridge is a vertical-lift bridge that carries Illinois Route 100 (IL 100) and IL 106 across the Illinois River from Florence to Scott County, Illinois. The bridge is the middle of the three Illinois River crossings on IL 100, with the other two in Hardin (South of Florence) and Beardstown (North of Florence). From its opening in 1929 until 1991, it carried U.S. Route 36 (US 36) and IL 100. In 1991, Interstate 72 (I-72) and the Valley City Eagle Bridges were completed upstream, and US 36 was designated onto I-72, with the old route signed as IL 106 (IL 100 was not rerouted). The bridge was rehabilitated in 1981, and again in 2004. The second time, the bridge was closed due to the need to replace the deck. Traffic was detoured to I-72. In 2012, the bridge's lifting mechanism that allows barge traffic to pass under the bridge had serious problems, and continued use could affect the structural integrity of the span. Therefore, the span was raised and the bridge closed for nine months for repairs, using I-72 as a detour. The bridge reopened on April 22, 2013. On June 20, 2019, barges pushed by a tugboat struck the bridge in multiple places, causing visible damage. The bridge was closed for emergency repairs, and traffic was detoured over I-72.

Back to article

Article summary

The Florence Bridge is a vertical-lift bridge that carries Illinois Route 100 (IL 100) and IL 106 across the Illinois River from Florence to Scott County, Illinois. The bridge is the middle of the three Illinois River crossings on IL 100, with the other two in Hardin (South of Florence) and Beardstown (North of Florence). From its opening in 1929 until 1991, it carried U.S. Route 36 (US 36) and IL 100. In 1991, Interstate 72 (I-72) and the Valley City Eagle Bridges were completed upstream, and US 36 was designated onto I-72, with the old route signed as IL 106 (IL 100 was not rerouted). The bridge was rehabilitated in 1981, and again in 2004. The second time, the bridge was closed due to the need to replace the deck. Traffic was detoured to I-72. In 2012, the bridge's lifting mechanism that allows barge traffic to pass under the bridge had serious problems, and continued use could affect the structural integrity of the span. Therefore, the span was raised and the bridge closed for nine months for repairs, using I-72 as a detour. The bridge reopened on April 22, 2013. On June 20, 2019, barges pushed by a tugboat struck the bridge in multiple places, causing visible damage. The bridge was closed for emergency repairs, and traffic was detoured over I-72.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.