Flower Pot Interchange

The Flower Pot Interchange is an elevated dual carriageway in Ghana with an asphalt concrete surfacing.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 2 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The Flower Pot Interchange is an elevated dual carriageway in Ghana with an asphalt concrete surfacing. It consists of a 140-meter ramp from Shiashie onto the viaduct towards Airport Hills, and an 80-meter ramp connecting the viaduct to the Motorway towards Tema. It was constructed by the Chinese Railway Engineering and commissioned by President Nana Akufo-Addo on 19 November 2024.

The project was originally allotted ¢69.5 million in 2016 and then a total of ¢147 million in 2017. When the project ended up costing more than ¢1 billion, some MPs questioned the expense. The Flower Pot Interchange is a significant infrastructure project in Accra, Ghana, designed to improve traffic flow between the northern and southern corridors of the Accra-Tema Motorway.

It benefits commuters in areas such as Cantonments, Burma Camp, East Legon, Spintex, and Tema.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1347033890 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

5 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.