Lesson plan
Flytoget
Flytoget ( ) is an airport railway service connecting Oslo Airport to Oslo Central Station. Run by Flytoget AS (formerly NSB Gardermobanen AS), it operates on the Gardermoen Line using sixteen GMB Class 71 electric trains. Normal service frequency is once every ten minutes, with five of the services each hour continuing westwards beyond Oslo Central. The journey takes nineteen minutes, with extended services serving nine stops within Greater Oslo and taking up to 60 minutes. Flytoget transported 5.4 million passengers in 2007, a 34-percent market share of airport ground transport. The service, which has a top speed of , is the only high-speed rail service in Norway. Construction started in 1994 and high-speed trains began serving Gardermoen Airport from the date of its opening on 8 October 1998, although full operation using the Romerike Tunnel had to wait another ten and a half months after severe leaks caused by the tunnel's construction led to the partial depletion of two lakes. Formed in 1992 as a subsidiary of Norwegian State Railways, the company has been owned since 2001 by the Norwegian Ministry of Trade and Industry.
Article summary
Flytoget ( ) is an airport railway service connecting Oslo Airport to Oslo Central Station. Run by Flytoget AS (formerly NSB Gardermobanen AS), it operates on the Gardermoen Line using sixteen GMB Class 71 electric trains. Normal service frequency is once every ten minutes, with five of the services each hour continuing westwards beyond Oslo Central. The journey takes nineteen minutes, with extended services serving nine stops within Greater Oslo and taking up to 60 minutes. Flytoget transported 5.4 million passengers in 2007, a 34-percent market share of airport ground transport. The service, which has a top speed of , is the only high-speed rail service in Norway. Construction started in 1994 and high-speed trains began serving Gardermoen Airport from the date of its opening on 8 October 1998, although full operation using the Romerike Tunnel had to wait another ten and a half months after severe leaks caused by the tunnel's construction led to the partial depletion of two lakes. Formed in 1992 as a subsidiary of Norwegian State Railways, the company has been owned since 2001 by the Norwegian Ministry of Trade and Industry.
Key claims
- date of formation: 1992 — source: Wikipedia, revision 1375641871, retrieved 2026-10-20 · confidence 0.95
- date of foundation: 1992-11-24 — source: Wikipedia, revision 1375641871, retrieved 2026-10-20 · confidence 0.95
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- The record states that the date of formation is "1992". What evidence would count against this claim?
- The record states that the date of foundation is "1992-11-24". What evidence would count against this claim?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
- Wikipedia, “Flytoget”, revision 1375641871, retrieved 2026-10-20 https://en.wikipedia.org/w/index.php?oldid=1375641871
Key claims and bibliography are generated from the same tracked claims and sources as the article page.