Gatwick Express

Uses your system voice; voice and rate in settings.

Snapshot

≈ 7 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Gatwick Express is an express rail passenger service between , , and in South East England. It is the brand name used by Greater Thameslink Railway, a train operating company which has been state-owned since 31 May 2026. Trains have regularly served Gatwick Airport since the opening of its rebuilt railway station in May 1958.

Prior to the 1980s, these services were relatively slow and without any particular priority; this led to the Gatwick Liaison Group advocating for a non-stop service to London during the late 1970s and early 1980s. Accordingly, during May 1984, the Gatwick Express service was launched using air-conditioned InterCity carriages. British Rail operated Gatwick Express through to its privatisation in April 1996, after which National Express took over operations under a franchising arrangement.

One of the franchise commitments made by National Express was the replacement of the inherited rolling stock with new-build trains for Gatwick Express; this led to the introduction of the Class 460 Junipers during the late 1990s and early 2000s. In June 2008, Gatwick Express ceased to exist as a separate franchise; it was merged into the Southern train operating company, although it continued to be maintained as a separate identity. Additional rolling stock in the form of the 442 (5WES) Wessex Electrics were introduced.…

Gatwick Express is an express rail passenger service between , , and in South East England. It is the brand name used by Greater Thameslink Railway, a train operating company which has been state-owned since 31 May 2026. Trains have regularly served Gatwick Airport since the opening of its rebuilt railway station in May 1958.

Prior to the 1980s, these services were relatively slow and without any particular priority; this led to the Gatwick Liaison Group advocating for a non-stop service to London during the late 1970s and early 1980s. Accordingly, during May 1984, the Gatwick Express service was launched using air-conditioned InterCity carriages. British Rail operated Gatwick Express through to its privatisation in April 1996, after which National Express took over operations under a franchising arrangement.

One of the franchise commitments made by National Express was the replacement of the inherited rolling stock with new-build trains for Gatwick Express; this led to the introduction of the Class 460 Junipers during the late 1990s and early 2000s. In June 2008, Gatwick Express ceased to exist as a separate franchise; it was merged into the Southern train operating company, although it continued to be maintained as a separate identity. Additional rolling stock in the form of the 442 (5WES) Wessex Electrics were introduced.

However, figures such as the Chairman of Gatwick Airport, Roy McNulty, publicly criticised Gatwick Express, claiming its services to be overcrowded and the rolling stock outdated. In July 2015, Southern including the Gatwick Express service was merged into Govia Thameslink Railway.

Since January 2016, both Oyster cards and contactless payment cards have been accepted for travel between London Victoria and Gatwick Airport. The introduction of s during the 2010s was objected to by the Associated Society of Locomotive Engineers and Firemen (ASLEF) trade union, but the dispute was later resolved.

All Gatwick Express services were suspended on 30 March 2020 as a result of the COVID-19 pandemic. Limited services resumed briefly during December 2021, but were suspended again only weeks later due to redevelopment works at Gatwick Airport station as well as COVID-related factors.

A reduced service of two trains per hour resumed on 3 April 2022, and the full four trains per hour service will resume from December 2026. Gatwick Express passenger services, along with all others operated by Govia Thameslink Railway, transferred to state-owned Greater Thameslink Railway on 31 May 2026.

Background

During the early 1950s, Gatwick Airport expanded substantially, leading to Gatwick railway station being rebuilt and integrated into the airport's terminal via an upper level concourse designed by British Rail Southern Region. On 27 May 1958, the rebuilt station, Gatwick Airport, opened with a regular train service.

Initially, the rail service was provided entirely by standard London to Brighton stopping services; however, more trains began to call with the introduction of the summer timetable in June 1958. One of the key elements of this expanded service was the extension of Three Bridges to Bognor Regis stopping services to start and terminate at London Victoria.

These trains would run through a reversible platform at Gatwick where a portion would detach and wait in the platform for passengers until the next up train from Bognor Regis was attached and the train would depart for Victoria. For this service British Rail used a small batch of seven Class 402 2HALs in order to work with the trains used on the Bognor Regis services, suitable for airport link use because of their larger luggage space.

This situation lasted until the early 1970s when increased passenger and luggage travel to the station was rendering the old system obsolete. British Rail therefore decided to adapt a number of Class 423 4VEPs with increased luggage capacity (at the expense of fewer second class seats) and were redesignated as Class 427 4VEGs.

The service however remained much the same, with the units attaching and detaching from Bognor Regis bound services running via Redhill. This led to somewhat extended journey times which meant the service lacked any real purpose, as the faster services began calling at Gatwick Airport from the early 1970s, and made the option of travelling to Gatwick from London on the service lack appeal to those who knew better.

At first the service from Bognor Regis, which by this stage only stopped at East Croydon, was branded Rapid City Link. During 1975, British Airports Authority airport director John Mulkern, British Caledonian Airways chairman Adam Thomson and British Rail's Southern Region regional manager Bob Reid, formed the Gatwick Liaison Group to discuss matters of mutual interest.

A subsidiary of this entity, the Gatwick Promotion Group, under the chairmanship of the airport's public relations manager David Hurst, was formed to market the airport. It was a long-term aim of the group to have a non-stop service between the airport and central London in order to counter the perceived distance from the capital, for both domestic and overseas passengers.

One of the first successes of the group was to persuade the British Rail board to redevelop Gatwick station by building a raft over the platforms, and this was opened by British Rail chairman Peter Parker in 1980. Gatwick Express operates an express commuter and airport transfer service between London Victoria, Gatwick Airport, Haywards Heath and Brighton.

Between 6:00 am and 9:00 am on weekdays, northbound services call additionally at Preston Park, Hassocks and Burgess Hill. Services stop additionally at the same stations in the southbound direction between 5:00 pm and 8:00 pm.

As of May 2025, the off-peak Monday Saturday, with frequencies in 'trains per hour' (tph), consists of: On Sundays, Gatwick Express operates a half-hourly shuttle service between London Victoria and Gatwick Airport only.

See also

Heathrow Express Luton Airport Express Stansted Express Airport rail link

Text derived from https://en.wikipedia.org/w/index.php?oldid=1376484818 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

25 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.