Lesson plan
Gelli Bridge
Gelli Bridge is a Grade II listed two-arch bridge spanning the River Syfynwy a few yards before its confluence with the Eastern Cleddau. The date of the bridge is not known, though projecting keystones suggest it is 18th century. It has been modified since its original construction. The unequal semicircular arches span 7 m and 4 m and the roadway is 2.4 m between the parapets, with wider approaches. It may originally have had a third, small arch to the east of the main span. The bridge is listed twice (with different IDs and dates) because it falls within two parishes. This listed bridge is not to be confused with several other bridges in the vicinity which carry road and rail across the Eastern Cleddau and another tributary.
Article summary
Gelli Bridge is a Grade II listed two-arch bridge spanning the River Syfynwy a few yards before its confluence with the Eastern Cleddau. The date of the bridge is not known, though projecting keystones suggest it is 18th century. It has been modified since its original construction. The unequal semicircular arches span 7 m and 4 m and the roadway is 2.4 m between the parapets, with wider approaches. It may originally have had a third, small arch to the east of the main span. The bridge is listed twice (with different IDs and dates) because it falls within two parishes. This listed bridge is not to be confused with several other bridges in the vicinity which carry road and rail across the Eastern Cleddau and another tributary.
Key claims
No claims recorded.
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
No sources recorded.
Key claims and bibliography are generated from the same tracked claims and sources as the article page.