Gemini 9A
≈ 6 min read
Names in other languages
- bgДжемини 9А
- فارسیجمینای ۹-آ
- EnglishGemini 9A
- EspañolGemini 9A
- MagyarGemini–9A
- ČeštinaGemini 9
- DeutschGemini 9
- fiGemini 9
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
Gemini 9A (officially Gemini IX-A) was a 1966 crewed spaceflight in NASA's Gemini program. It was the seventh crewed Gemini flight, the 15th crewed American flight and the 23rd spaceflight of all time (includes X-15 flights over ). The original crew for Gemini 9, command pilot Elliot See and pilot Charles Bassett, were killed in a crash on February 28, 1966, while flying a T-38 jet trainer to the McDonnell Aircraft plant in St. Louis, Missouri to inspect their spacecraft. Their deaths promoted the backup crew, Thomas P.
Stafford and Eugene Cernan, to the prime crew. The mission was renamed Gemini 9A after the original May 17 launch was scrubbed when the mission's Agena Target Vehicle was destroyed after a launch failure. The mission was flown June 3–6, 1966, after launch of the backup Augmented Target Docking Adaptor (ATDA). Stafford and Cernan rendezvoused with the ATDA, but were unable to dock with it because the nose fairing had failed to eject from the docking target due to a launch preparation error.
Cernan performed a two-hour extravehicular activity, during which it was planned for him to demonstrate free flight in a self-contained rocket pack, the USAF Astronaut Maneuvering Unit. He was unable to accomplish this due to stress, fatigue, and overheating.
Gemini 9A (officially Gemini IX-A) was a 1966 crewed spaceflight in NASA's Gemini program. It was the seventh crewed Gemini flight, the 15th crewed American flight and the 23rd spaceflight of all time (includes X-15 flights over ). The original crew for Gemini 9, command pilot Elliot See and pilot Charles Bassett, were killed in a crash on February 28, 1966, while flying a T-38 jet trainer to the McDonnell Aircraft plant in St. Louis, Missouri to inspect their spacecraft. Their deaths promoted the backup crew, Thomas P.
Stafford and Eugene Cernan, to the prime crew. The mission was renamed Gemini 9A after the original May 17 launch was scrubbed when the mission's Agena Target Vehicle was destroyed after a launch failure. The mission was flown June 3–6, 1966, after launch of the backup Augmented Target Docking Adaptor (ATDA). Stafford and Cernan rendezvoused with the ATDA, but were unable to dock with it because the nose fairing had failed to eject from the docking target due to a launch preparation error.
Cernan performed a two-hour extravehicular activity, during which it was planned for him to demonstrate free flight in a self-contained rocket pack, the USAF Astronaut Maneuvering Unit. He was unable to accomplish this due to stress, fatigue, and overheating.
Original prime crew
On February 28, 1966, See and Bassett were flying from Texas to inspect the Gemini 9 spacecraft at the McDonnell Aircraft plant in St. Louis, Missouri. The conditions at Lambert Field were poor and, as a consequence, in attempting a visual approach and landing, See hit one of the assembly buildings of the factory and caused the aircraft to crash, killing himself and Bassett instantly. As a consequence, the backup crew was promoted to prime crew, the first time this had occurred since the flight of Mercury-Atlas 7 in 1962.
Original backup crew and new prime crew
Target vehicle launch
Gemini 9's Agena Target Vehicle (ATV) was launched on May 17, 1966, on an Atlas launch vehicle. The Atlas malfunctioned in flight and the ATV failed to reach orbit. This forced the cancellation of the Gemini 9 launch scheduled for later that morning. The Augmented Target Docking Adapter (ATDA) had been designed for use as a contingency for the ATV, which had failed during the original Gemini 6 launch. Built by Gemini spacecraft manufacturer McDonnell Aircraft Corporation, the ATDA replaced the Agena rocket with the reentry control section of a Gemini.
It was built using already tested equipment, and successfully launched on June 1, 1966, into a orbit using the Atlas SLV-3 rocket. Because the ATDA had no propulsion system of its own, the launch necessitated an extended Atlas sustainer burn—while SECO would normally take place at T+300 seconds, it was extended to T+348 seconds. A sustainer burn this long had never been attempted in almost 300 Atlas launches to date—a double-sized lubricant oil tank was used to ensure enough oil for turbopump operation.
The experiment worked and sustainer performance during the extended burn phase was uneventful. The vernier solo phase lasted another 18 seconds and ATDA separation occurred at T+383 seconds. After launch, telemetry indicated that the launch shroud had failed to open properly.
Gemini spacecraft launch
Replanning the mission to accommodate the May 17 ATV failure forced the redesignation of the Gemini mission as Gemini 9A, the same as had happened to the original Gemini 6 mission on October 25, 1965. The first launch attempt was scheduled to occur shortly after the ATDA launch. But at T−3 minutes, the ground computers lost contact with the Gemini computers for an unknown reason, and the 40 second launch window opened and closed without launch. This earned Tom Stafford the title of "Mayor of Pad 19". The second launch attempt on June 3 went perfectly, with the spacecraft entering into orbit. With this launch, Stafford could say that he had been strapped into a Gemini spacecraft six times for only 2 launches. Launch vehicle performance was very close to nominal. Two small roll transients were evident at liftoff and pogo effects were the lowest yet recorded on a Gemini launch.
References
NASA Space Science Data Coordinated Archive U.S. Space Objects Registry https://web.archive.org/web/20090521121750/http://usspaceobjectsregistry.state.gov/search/index.cfm Walking to Olympus: An EVA Chronology: https://history.nasa.gov/monograph7.pdf
Text derived from https://en.wikipedia.org/w/index.php?oldid=1367804562 under CC BY-SA 4.0; modifications have been made.