A grid code is a technical specification which defines the parameters a facility connected to a public electric grid has to meet to ensure safe, secure and economic proper functioning of the electric system. The facility can be an electricity generating plant, a consumer, or another network.[1] The grid code is specified by an authority responsible for the system integrity and network operation. Its elaboration usually implicates network operators (distribution or transmission system operators), representatives of users and, to an extent varying between countries, the regulating body.[2]
Contents of a grid code vary depending on the transmission company's requirements. Typically, a grid code will specify the required behavior of a connected generator during system disturbances. These include voltage regulation, power factor limits and reactive power supply, response to a system fault (e.g. short-circuit), response to frequency changes on the grid, and requirement to "ride through" short interruptions of the connection.
There is not a common grid code in all countries and each electric grid has its own grid code. Even in North America, there is no grid code that applies to all territories.[3]
Independent power producers
edit edit sourceAll generators including Independent power producers like photovoltaic power stations[4] or wind farms[5] have to comply with the grid code.[6]
Categorizing
edit edit sourceGrid code requirements can be divided into two categories: static and dynamic requirements.[3]
See also
edit edit sourceReferences
edit edit source- ^ GmbH, Next Kraftwerke (2019-02-13). "The Grid Code: Rules for the power network". Virtual Power Plant | Power Trader | Aggregator. Retrieved 2019-07-04.
- ^ "Grid Code". National Grid ESO. 2018-10-17. Retrieved 2019-07-04.
- ^ a b "ABB Conversations > Standards and grid codes – the latest developments and trends". ABB Conversations. 2019-07-04. Retrieved 2019-07-04.
- ^ "Solar Energy Plants Grid Connection Code" (PDF). Archived from the original (PDF) on 2020-01-19. Retrieved 2019-07-04.
- ^ Harandi, Mahdi Jafari; Ghaseminejad Liasi, Sahand; Nikravesh, Esmail; Bina, Mohammad Tavakoli (2019-06-18). "An Improved Control Strategy for DFIG Low Voltage Ride-Through Using Optimal Demagnetizing method". 2019 10th International Power Electronics, Drive Systems and Technologies Conference (PEDSTC). pp. 464–469. doi:10.1109/PEDSTC.2019.8697267. ISBN 978-1-5386-9254-7.
- ^ Grid codes for renewable energy integration
External links
edit edit source- Indian grid code
- Italian grid code (for direct connections to TSO)
- Italian grid code (for connections to DSOs)
- UK grid codes
- International Grid Code Listing
- Automatic generation control
- Backfeeding
- Base load
- Demand factor
- Droop speed control
- Electric power
- Electric power quality
- Electrical fault
- Energy demand management
- Energy return on investment
- Grid code
- Grid strength
- Home energy storage
- Load-following
- Merit order
- Nameplate capacity
- Peak demand
- Power factor
- Power-flow study
- Power system reliability
- Repowering
- Utility frequency
- Variability
- Fossil fuel power station
- Nuclear
and distribution
- Ancillary services
- Balancing authority
- Contingency (electrical grid)
- Demand response
- Distributed generation
- Dynamic demand
- Electric power distribution
- Electric power system
- Electric power transmission
- Electrical busbar system
- Electrical grid
- Electricity retailing
- Grid balancing
- High-voltage direct current
- High-voltage shore connection
- Interconnector
- Load management
- Mains electricity by country
- Overhead power line
- Power station
- Pumped hydro
- Single-wire earth return
- Smart grid
- Substation
- Super grid
- Transformer
- Transmission system operator (TSO)
- Transmission tower
- Utility pole
- Voltage control and reactive power management
devices
and policies
- Availability factor
- Capacity factor
- Carbon offsets and credits
- Cost of electricity by source
- Energy subsidies
- Environmental tax
- Feed-in tariff
- Fossil fuel phase-out
- Load factor
- Net metering
- Pigouvian tax
- Renewable Energy Certificates
- Renewable energy commercialization
- Renewable Energy Payments
- Spark/Dark/Quark/Bark spread
production
Text derived from https://en.wikipedia.org/w/index.php?oldid=1331265732 under CC BY-SA 4.0; modifications have been made.