GSAT-6A
GSAT-6A was a communication satellite launched by the Indian Space Research Organisation (ISRO).
≈ 2 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
GSAT-6A was a communication satellite launched by the Indian Space Research Organisation (ISRO). It featured a unfurlable S-band antenna similar to the one used on GSAT-6. Around 17 minutes after lift-off, the three stage GSLV Mk.II rocket flying on GSLV F08 mission successfully injected the satellite into a geosynchronous transfer orbit.
Due to power failure during its orbit raising burns the communication was lost with GSAT-6A before it could reach its final circular geostationary orbit (GSO).
History
GSAT-6A was launched to complement GSAT-6 satellite which was launched in August 2015 by ISRO. The cost of building GSAT-6A was around ₹270 crore. GSAT-6A was to provide mobile communication services to the Indian Armed Forces.
Loss of communication
The first orbit raising maneuver for GSAT-6A was carried out as planned on 30 March 2018 by firing the Liquid Apogee Motor (LAM) for 2188 seconds from 09:22 AM IST. The second orbit raising maneuver was carried out at 10:00 AM on 31 March 2018.
As the satellite was on-course for its third and final orbit raising maneuver on 1 April 2018, communication with it was lost and the spacecraft was temporarily untraceable. After regaining its track, efforts to re-establish communication with the satellite could not succeed. Power system malfunction was suspected to be the reason behind loss of contact.
See also
Indian military satellites
Text derived from https://en.wikipedia.org/w/index.php?oldid=1303971422 under CC BY-SA 4.0; modifications have been made.