Halton Railway

Halton Railway was a spur line from Wendover to RAF Halton used to transport coal and other goods to RAF Halton.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 2 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Halton Railway was a spur line from Wendover to RAF Halton used to transport coal and other goods to RAF Halton. It closed in 1963.

Opened in 1917 after an eight-week construction period, the branch line ran for and was constructed by German prisoners of war during World War I. The railway was originally built to carry building materials into the site for construction of the workshops and other units. It also forwarded coal to the boilers on camp.

It was later converted from a narrow gauge of to and was used to bring timber out of Halton woods. The conversion of boilers on the station from coal fired to oil fired, allowed road-tankers to take over the inward flow of fuel and accelerated the demise of the railway and the last train ran on 29 March 1963 with closure following two days afterwards.

The majority of the track has since been removed, including the original bridge over the Grand Union Canal which was replaced by a modern footbridge, however much of the line is designated a permissive footpath (rail trail).

Text derived from https://en.wikipedia.org/w/index.php?oldid=988563228 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

3 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.