High Speed 1

High Speed 1 (HS1), officially the Channel Tunnel Rail Link (CTRL), is a high-speed railway linking London with the Channel Tunnel.

Uses your system voice; voice and rate in settings.

Snapshot

≈ 4 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

High Speed 1 (HS1), officially the Channel Tunnel Rail Link (CTRL), is a high-speed railway linking London with the Channel Tunnel. It is part of the line carrying international passenger traffic between the United Kingdom and mainland Europe; it also carries domestic passenger traffic to and from stations in Kent and east London, and continental European loading gauge freight traffic.

From the Channel Tunnel, the line crosses the River Medway, and tunnels under the River Thames, terminating at London St Pancras International station on the north side of central London. It cost £6.84 billion to build and opened on 14 November 2007. Trains run at speeds of up to on HS1.

There are intermediate stations at in London, Ebbsfleet International in northern Kent and Ashford International in southern Kent. International passenger services are provided by Eurostar International, with journey times from London St Pancras International to Paris Gare du Nord in 2 hours 15 minutes, and London St Pancras International to Brussels South/Bruxelles-Midi/Brussel Zuid in 1 hour 51 minutes.

As of 2026, Eurostar uses a fleet of 8 Class 373 multi-system trains capable of and 17 Class 374 trains capable of . Domestic high-speed commuter services serving intermediate stations and beyond began on 13 December 2009. The fleet of 29 Class 395 passenger trains reach speeds of .…

High Speed 1 (HS1), officially the Channel Tunnel Rail Link (CTRL), is a high-speed railway linking London with the Channel Tunnel. It is part of the line carrying international passenger traffic between the United Kingdom and mainland Europe; it also carries domestic passenger traffic to and from stations in Kent and east London, and continental European loading gauge freight traffic.

From the Channel Tunnel, the line crosses the River Medway, and tunnels under the River Thames, terminating at London St Pancras International station on the north side of central London. It cost £6.84 billion to build and opened on 14 November 2007. Trains run at speeds of up to on HS1.

There are intermediate stations at in London, Ebbsfleet International in northern Kent and Ashford International in southern Kent. International passenger services are provided by Eurostar International, with journey times from London St Pancras International to Paris Gare du Nord in 2 hours 15 minutes, and London St Pancras International to Brussels South/Bruxelles-Midi/Brussel Zuid in 1 hour 51 minutes.

As of 2026, Eurostar uses a fleet of 8 Class 373 multi-system trains capable of and 17 Class 374 trains capable of . Domestic high-speed commuter services serving intermediate stations and beyond began on 13 December 2009. The fleet of 29 Class 395 passenger trains reach speeds of .

DB Cargo UK run freight services on High Speed 1 using adapted Class 92 locomotives, enabling flat wagons carrying continental-size swap body containers to reach London for the first time. The CTRL project saw new bridges and tunnels built, with a combined length nearly as long as the Channel Tunnel itself, and significant archaeological research undertaken.

In 2002, the CTRL project was awarded the Major Project Award at the British Construction Industry Awards.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1373061447 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

21 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.