Hualong One

(red), steam generators (purple), pressurizer (blue), and pumps (green) in the three coolant loop Hualong One design The Hualong One ( ) is a Chinese Generation III pressurized water nuclear reactor jointly developed by the China General…

Uses your system voice; voice and rate in settings.

≈ 5 min read

Cite, export and learn8 citation formats · 8 exports · lesson and quiz

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

(red), steam generators (purple), pressurizer (blue), and pumps (green) in the three coolant loop Hualong One design The Hualong One ( ) is a Chinese Generation III pressurized water nuclear reactor jointly developed by the China General Nuclear Power Group (CGN) and the China National Nuclear Corporation (CNNC). The CGN version, and its derived export version, is called HPR1000.

It is commonly mistakenly referred to in media as the "ACPR1000" and "ACP1000", which are in fact earlier reactors design programs by CGN and CNNC. Unit 5 of the Fuqing Nuclear Power Plant was the first Hualong One to enter commercial service on 30 January 2021.

Merger of ACP-1000 and ACPR-1000 into Hualong One

Since 2012, CNNC has been progressively merging its ACP-1000 nuclear power station design with the CGN ACPR-1000 design, while allowing some differences, under direction of the Chinese nuclear regulator. Both are three-loop designs originally based on the same French M310 design used in Daya Bay with 157 fuel assemblies, but went through different development processes (CNNC's ACP-1000 has a more domestic design with 177 fuel assemblies while CGN's ACPR-1000 is a closer copy with 157 fuel assemblies).

In early 2014, it was announced that the merged design was moving from preliminary design to detailed design. Power output will be 1150 MWe, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment. CNNC's 177 fuel assembly design was retained.

Initially the merged design was to be called the ACC-1000, but ultimately it was named Hualong One. In August 2014 the Chinese nuclear regulator review panel classified the design as a Generation III reactor design, with independently owned intellectual property rights. As a result of the success of the merger, ACP-1000 and ACPR-1000 designs are no longer being offered.

After the merger, both companies retain their own supply chain and their versions of the Hualong One will differ slightly (units built by CGN will retain some features from the ACPR1000) but the design is considered to be standardised. CNNC version emphasizes more passive safety due to influence from Westinghouse AP1000, with increased containment volume and two active safety trains, while CGN version has three active safety trains due to influence from Areva EPR.

Some 90% of its components will be made domestically. The Hualong One power output will be 1170 MWe gross, 1090 MWe net, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment. It has a 177 assembly core design with an 18-month refuelling cycle.

The power plant's utilisation rate is as high as 90%. CNNC has said its active and passive safety systems, double-layer containment and other technologies meet the highest international safety standards. According to CNNC, the Hualong One has a construction cost of CNY17,000 per kW.

A the end of August 2014, Chinese regulators were satisfied that Hualong One was a Generation III design and that intellectual property rights were fully held in China. Chinese media reports that all core components are manufactured in China and that 17 universities and research institutions, 58 state-owned enterprises and over 140 private firms across China worked on Hualong One's development to ensure all core components were able to be produced domestically.

EU approval

In November 2021, the European Utility Requirements (EUR) organisation formally certified the Hualong One (HPR1000) as compliant after a four-step process which began in August 2017. The requirements covered a broad range of conditions for nuclear power plants to operate efficiently and safely.

UK approval

In February 2022, UK regulators announced that the Hualong One (HPR1000) had passed the four-step Generic Design Assessment (GDA) which started in August 2017 and was thus suitable for construction in the UK, possibly in the Bradwell B nuclear power station project. The Office for Nuclear Regulation issued a Design Acceptance Confirmation (DAC) and the UK Environment Agency issued a Statement of Design Acceptability (SoDA).

Hualong Two

In the same year that the first Hualong One entered commercial operation, CNNC indicated plans to start building a follow-on version, Hualong Two, by 2024. It would be a more economical version using similar technology, reducing build time from 5 years to 4, and reducing costs by around a fourth from 17,000 yuan per kW to 13,000 yuan per kW.

Construction on a next-generation unit did not commence by that time, but in 2025, regulators approved the "Hualong One version 2.0" which was subsequently used in demonstration projects. During 31 July 2026 meeting of State Council, chaired by Chinese Premier Li Qiang, it was decided that the 3rd and 4th units of Jinqimen plant and 5th and 6th units of Taipingling plant will be Hualong One 2.0.

See also

Generation III reactor Nuclear power in China

Text derived from https://en.wikipedia.org/w/index.php?oldid=1378497870 under CC BY-SA 4.0; modifications have been made.

Words in each sectionMerger of ACP-1000 and …Merger of ACP-1000 and ACPR-1000 into Hualong OneMerger of ACP-1000 and ACPR-1000 into Hualong One: 442 words442Hualong TwoHualong TwoHualong Two: 133 words133UK approvalUK approvalUK approval: 65 words65EU approvalEU approvalEU approval: 43 words43See alsoSee alsoSee also: 28 words28
Words in each section. Measured from the stored article body; sections below the minimum are not plotted.

Provenance

snapshot enwiki-001378497870 · captured 2026-10-04 · ledger · version history

Cite this page as: encyclopegia.org, “Hualong One”, snapshot enwiki-001378497870. https://encyclopegia.org/a/hualong-one

Sources cited in this revision

30 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.