Lesson plan
Hunterston
Hunterston, by the Firth of Clyde, is a coastal area in Ayrshire, Scotland. It is the seat and estate of the Hunter family. As an area of flat land adjacent to deep natural water, it has been the site of considerable actual and proposed industrial development in the 20th century. The nearest town is West Kilbride. The Hunterston Brooch was found there. Actual or proposed developments on this site have included: * Hunterston A nuclear power station, the closed Magnox power station * Hunterston B nuclear power station, the shut-down Advanced gas-cooled reactor power station * Western HVDC Link, the 2.2 GW undersea power cable to Flintshire Bridge, North Wales * Hunterston Terminal, the deep-water ore terminal and associated railhead built by British Steel * A construction yard, used to build oil platforms between 1978 and 1983, a Trident dry dock between 1988 and 1993 and a Gravity base Tank between 1993 and 1996 * A proposed Oil Refinery by Chevron in 1969 and 1973 * An integrated direct-reduction steel blast furnace proposed by British Steel Corporation. This was unused as its gas and fuel requirements were too great. The plant was moved to Mobile, Alabama, in 1998. *A "clean coal" power station has been proposed for the site. Peel Energy is the main partner in the proposal.…
Article summary
Hunterston, by the Firth of Clyde, is a coastal area in Ayrshire, Scotland. It is the seat and estate of the Hunter family. As an area of flat land adjacent to deep natural water, it has been the site of considerable actual and proposed industrial development in the 20th century. The nearest town is West Kilbride. The Hunterston Brooch was found there. Actual or proposed developments on this site have included: * Hunterston A nuclear power station, the closed Magnox power station * Hunterston B nuclear power station, the shut-down Advanced gas-cooled reactor power station * Western HVDC Link, the 2.2 GW undersea power cable to Flintshire Bridge, North Wales * Hunterston Terminal, the deep-water ore terminal and associated railhead built by British Steel * A construction yard, used to build oil platforms between 1978 and 1983, a Trident dry dock between 1988 and 1993 and a Gravity base Tank between 1993 and 1996 * A proposed Oil Refinery by Chevron in 1969 and 1973 * An integrated direct-reduction steel blast furnace proposed by British Steel Corporation. This was unused as its gas and fuel requirements were too great. The plant was moved to Mobile, Alabama, in 1998. *A "clean coal" power station has been proposed for the site. Peel Energy is the main partner in the proposal.…
Key claims
No claims recorded.
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
No sources recorded.
Key claims and bibliography are generated from the same tracked claims and sources as the article page.