Huron Wind

Uses your system voice; voice and rate in settings.

Snapshot

≈ 2 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Huron Wind is the first commercial wind farm in Ontario. It is located in the village of Inverhuron, Ontario near Tiverton, and consists of 5 Vestas V80-1.8MW wind turbines. It is next to the Bruce Power Visitor Centre, within sight of the Bruce Nuclear Generating Station, and adjacent to the larger Enbridge Ontario Wind Farm. Groundbreaking was on July 11, 2002, and it was declared officially in service on December 1, 2002. The project is owned by a consortium of BPC Generation Infrastructure Trust, Cameco Corporation and TransCanada PipeLines Limited.

Huron Wind is the first commercial wind farm in Ontario. It is located in the village of Inverhuron, Ontario near Tiverton, and consists of 5 Vestas V80-1.8MW wind turbines. It is next to the Bruce Power Visitor Centre, within sight of the Bruce Nuclear Generating Station, and adjacent to the larger Enbridge Ontario Wind Farm. Groundbreaking was on July 11, 2002, and it was declared officially in service on December 1, 2002. The project is owned by a consortium of BPC Generation Infrastructure Trust, Cameco Corporation and TransCanada PipeLines Limited.

See also

List of wind farms in Canada

References

External links

Official Huron Wind site

Text derived from https://en.wikipedia.org/w/index.php?oldid=1156178393 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

Extracted from the cited revision's reference blocks; absent citations are not invented.