Lesson plan

IMR-2

The IMR-2 is a Soviet and Russian tracked military engineering vehicle built on the chassis of the T-72 main battle tank. IMR stands for Inzhenernaya Mashina Razgrazhdeniya ( ), meaning "Clearing Engineering Vehicle". Development of the IMR-2 began in the 1970s and was completed in 1980. Series production commenced in 1982. The IMR-2 was developed to replace the aging IMR, which was built on the basis of the T-54/55 tank. It is in service with the Russian Army and some foreign militaries. It took part in the Soviet–Afghan War, First Chechen War, Second Chechen War, Russian invasion of Ukraine and was in addition used in relief operations after the Chernobyl disaster.

Back to article

Article summary

The IMR-2 is a Soviet and Russian tracked military engineering vehicle built on the chassis of the T-72 main battle tank. IMR stands for Inzhenernaya Mashina Razgrazhdeniya ( ), meaning "Clearing Engineering Vehicle". Development of the IMR-2 began in the 1970s and was completed in 1980. Series production commenced in 1982. The IMR-2 was developed to replace the aging IMR, which was built on the basis of the T-54/55 tank. It is in service with the Russian Army and some foreign militaries. It took part in the Soviet–Afghan War, First Chechen War, Second Chechen War, Russian invasion of Ukraine and was in addition used in relief operations after the Chernobyl disaster.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.