Intercity Express

system of high-speed trains predominantly running in Germany and its surrounding countries

Uses your system voice; voice and rate in settings.

≈ 5 min read

Cite, export and learn8 citation formats · 8 exports · lesson and quiz

Names in other languages

  • EnglishIntercity Express
  • nanIntercity-Express
  • lbInterCityExpress
  • 中文城际特快列车
  • 简体中文城际特快列车
  • 繁體中文城際特快列車
  • 中文城際特快列車
  • 中文城际特快列车
  • 中文城際特快列車

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

Intercity Express (commonly known as ICE ( ) and running under this category) is a high-speed rail system and service in Germany. It also serves destinations in Austria, France, Belgium, Switzerland and the Netherlands as part of cross-border services. It is the flagship of the German state railway, Deutsche Bahn.

Travelling at speeds up to within Germany and when in France, they are aimed at business travellers and long-distance commuters and marketed by Deutsche Bahn as an alternative to flights. The ICE 3 also has been the development base for the Siemens Velaro family of trainsets which has subsequently been exported to Renfe in Spain (Renfe Class 103), which are certified to run at speeds up to , as well as versions ordered by China for the Beijing–Tianjin intercity railway link (CRH 3) and by Russia for the Moscow–Saint Petersburg and Moscow–Nizhny Novgorod routes (Velaro RUS) with further customers being Eurostar as well as Turkey and Egypt.

Fourth generation

Procurement of ICx trainsets started c. 2008 as replacements for locomotive hauled InterCity and EuroCity train services - the scope was later expanded to include replacements for ICE 1 and ICE 2 trainsets. In 2011 Siemens was awarded the contract for 130 seven car intercity train replacements, and 90 ten car ICE train replacements, plus further options - the contract for the ten car sets was modified in 2013 to expand the trainset length to twelve vehicles.

The name ICx was used for the trains during the initial stages of the procurement; in late 2015 the trains were rebranded ICE 4, at the unveiling of the first trainset, and given the class designation 412 by Deutsche Bahn. Two pre-production trainsets were manufactured and used for testing prior to the introduction of the main series.

Lines under construction

Stuttgart–Wendlingen high-speed railway (new line, 250 km/h, under construction) Vogelfluglinie (partially new line, partially being upgraded) Lübeck–Hamburg railway (German part, to be upgraded to reach 200 km/h) Lübeck–Puttgarden railway (German part, to be electrified to reach 200 km/h up from the current 160 km/h, under construction) Fehmarn Belt Fixed Link (tunnel part, will replace the Rødby–Puttgarden ferry, 200 km/h, under construction, completion expected in 2028) Sydbanen (Danish part, new tracks to be laid by 2021, to be electrified to reach 200 km/h by 2024, under construction)

Lines planned

Frankfurt–Mannheim high-speed railway (new line, 300 km/h, in planning) Hanau-Gelnhausen high-speed railway (new line, 300 km/h, in planning) Dresden‒Prague high-speed line (new line, 300 km/h, in planning) Nuremberg-Würzburg high-speed railway (new line, 300 km/h, in planning) Hanover-Hamburg high-speed railway/Hanover-Bremen high-speed railway (Y-shaped, partially new line, 160 and 300 km/h on new sections, 160 km/h on an existing section, in planning) Fulda–Eisenach high-speed railway 250 km/h 2030 52 km Fulda–Frankfurt (parallel new) high-speed railway 250 km/h 2035 80 km

Possible future service to London

In January 2010, the European railway network was opened to a liberalisation intended to allow greater competition. Both Air France-KLM and Deutsche Bahn have indicated their desire to take advantage of the new laws to run new services via the Channel Tunnel and the High Speed 1 route that terminates at London St Pancras International.

A test run of an ICE train through the Channel Tunnel took place on 19 October 2010. Passenger-carrying ICE trains, however, will have to meet safety requirements in order to transit the Channel Tunnel. Although the requirement for splittable trains was lifted, concerns remain over the shorter length of ICE trainsets, fire safety, and the ICE's distributed power arrangements.

There have been suggestions that French interests have advocated stringent enforcement to delay a competitor on the route. Eurostar also chose Siemens Velaro-based rolling stock; there were concerns that Alstom (builders of the passenger trains that already use the Tunnel) and the French Government would take the matter to court.

In October 2010, the French transport minister suggested that the European Railway Agency (based in France) should arbitrate. After safety rule changes which might permit the use of Siemens Velaro rolling stock, the French government dismissed their delegate to the Channel Tunnel Safety Authority, and brought in a replacement.

In March 2011, a European Rail Agency report authorized trains with distributed traction for use in the Channel Tunnel. This means that the ICE class 407 trains which DB intends to use for its London services will be able to run through the tunnel.

In February 2014, however, Deutsche Bahn announced further difficulties with launching the route, and reports make it seem unlikely that service will start anytime this decade. In June 2018, Deutsche Bahn announced that it was shelving plans to revive a potential London-Frankfurt ICE connection.

The service would take around 5 hours and could rival airlines and become the first competitor for Eurostar. As of 2025 Eurostar has also in its plans to launch direct train services between London and Frankfurt with the same travel duration.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1378075144 under CC BY-SA 4.0; modifications have been made.

Words in each sectionPossible future service…Possible future service to LondonPossible future service to London: 365 words365Fourth generationFourth generationFourth generation: 134 words134Lines under constructionLines under constructionLines under construction: 99 words99Lines plannedLines plannedLines planned: 92 words92
Words in each section. Measured from the stored article body; sections below the minimum are not plotted.

Provenance

snapshot intercity-express-015516-d34f8861b0fd43ba · hash d34f8861b0fd43ba62952fb482c678cee4295406b607b59f8c75caf9cd99b9ce · captured 2026-10-02 · ledger · version history

Cite this page as: encyclopegia.org, “Intercity Express”, snapshot intercity-express-015516-d34f8861b0fd43ba. https://encyclopegia.org/a/intercity-express

Sources cited in this revision

35 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.