Intersection capacity utilization
≈ 6 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
Intersection Capacity Utilization (ICU) method is a tool for measuring a roadway intersection's capacity. It is ideal for transportation planning applications such as roadway design, congestion management programs and traffic impact studies. It is not intended for traffic operations or signal timing design. ICU is also defined as "the sum of the ratios of approach volume divided by approach capacity for each leg of intersection which controls overall traffic signal timing plus an allowance for clearance times." The ICU tells how much reserve capacity is available or how much the intersection is overcapacity. The ICU does not predict delay, but it can be used to predict how often an intersection will experience congestion. The method by which the ICU is used shows what the ICU is about. The ICU uses a grading system to rank the intersection that is being studied. This ranking system is known as the Level of Service (LOS) for the intersection. ICU is timing plan independent, yet has rules to ensure that minimum timing constraints are taken into account. This removes the choice of timing plan from the capacity results. The ICU can also be used on uncontrolled intersections to determine the capacity utilization if the intersection were to be signalized. The ICU is not intended for operations or signal timing design.…
Intersection Capacity Utilization (ICU) method is a tool for measuring a roadway intersection's capacity. It is ideal for transportation planning applications such as roadway design, congestion management programs and traffic impact studies. It is not intended for traffic operations or signal timing design. ICU is also defined as "the sum of the ratios of approach volume divided by approach capacity for each leg of intersection which controls overall traffic signal timing plus an allowance for clearance times." The ICU tells how much reserve capacity is available or how much the intersection is overcapacity. The ICU does not predict delay, but it can be used to predict how often an intersection will experience congestion. The method by which the ICU is used shows what the ICU is about. The ICU uses a grading system to rank the intersection that is being studied. This ranking system is known as the Level of Service (LOS) for the intersection. ICU is timing plan independent, yet has rules to ensure that minimum timing constraints are taken into account. This removes the choice of timing plan from the capacity results. The ICU can also be used on uncontrolled intersections to determine the capacity utilization if the intersection were to be signalized. The ICU is not intended for operations or signal timing design. The primary output from ICU is similar to the intersection volume to capacity ratio. Some of the benefits to using ICU over delay-based methods include greater accuracy, and a clear image of the intersection's volume to capacity ratio. ICU method has been subject to some competition from the Highway Capacity Manual (HCM). Both methods are used to determine the LOS of an intersection. However, each method has different criteria for the rankings. In transportation, each method is used for different types of projects. The review board of the ICU continue to make changes every year in order to incorporate all of the new criteria required. The ICU has not been designed for operations and signal timing design. Delay based methods and simulation such as HCM, PTV Vistro, Synchro, and SimTraffic should be used for operations and signal timing design. In short, the ICU method makes the traffic capacity design a much easier and simpler task. ICU = sum(max (tMin, v/si) * CL + tLi) / CL = Intersection Capacity Utilization CL = Reference Cycle Length tLi = Lost time for critical movement v/si = volume to saturation flow rate, critical movement tMin = minimum green time, critical movement i Once the ICU is fully calculated for an intersection, the ICU LOS for that intersection can be calculated based on the following criteria: Level of Service A: If ICU is less than or equal to 55% B: If ICU is greater than 55% but less than 64% C: If ICU is greater than 64% but less than 73% D: If ICU is greater than 73% but less than 82% E: If ICU is greater than 82% but less than 91% F: If ICU is greater than 91% but less than 100% G: If ICU is greater than 100% but less than 109% H: If ICU is greater than 109% This grading criteria shows some specific details about the specific intersection: A: Intersection has no congestion B: Intersection has very little congestion C: Intersection has no major congestion D: Intersection normally has no congestion E: Intersection is on the verge of congested conditions F: Intersection is over capacity and likely experiences congestion periods of 15 to 60 consecutive minutes. G: Intersection is 9% over capacity and experiences congestion periods of 60 to 120 consecutive minutes. H: The intersection is 9% or greater over capacity and could experience congestion periods of over 120 minutes per day. Most industry standards require the ICU LOS to be E or better. This is not always easy to achieve and therefore much care is given to the signal timings and geometry in order to get the LOS to be better than E.
Text derived from https://en.wikipedia.org/w/index.php?oldid=1320566652 under CC BY-SA 4.0; modifications have been made.