ITER
≈ 8 min read
Names in other languages
- cebIteré
- SvenskaIteré
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
ITER (originally an acronym for International Thermonuclear Experimental Reactor, and also meaning "the way" or "the path" in Latin) is an international nuclear fusion research and engineering project designed to demonstrate the feasibility of fusion power. The facility is under construction near the Cadarache research center in southern France. ITER has been under construction since 2013. It is expected to achieve first plasma in 2033–2034, at which point it will be the world's largest fusion reactor, with a plasma volume about six times that of Japan's JT-60SA, previously the largest tokamak. The long-term goal of fusion research is to generate electricity; ITER's stated purpose is scientific research, and technological demonstration of a large fusion reactor, without electricity generation. ITER's goals include to achieve fusion energy gain factors (Q, the ratio of thermal output power to thermal power absorbed by the plasma) of Q = 10 momentarily and Q = 5 at steady state; to develop fusion power technologies including superconducting magnets, cryogenics, heating, control and diagnostics systems, and remote handling; to study burning plasma; to test tritium breeding; and to demonstrate the safety of a fusion plant. ITER is funded and operated by seven member parties: China, the European Union (EU), India, Japan, Russia, South Korea and the United States.…
ITER (originally an acronym for International Thermonuclear Experimental Reactor, and also meaning "the way" or "the path" in Latin) is an international nuclear fusion research and engineering project designed to demonstrate the feasibility of fusion power. The facility is under construction near the Cadarache research center in southern France. ITER has been under construction since 2013. It is expected to achieve first plasma in 2033–2034, at which point it will be the world's largest fusion reactor, with a plasma volume about six times that of Japan's JT-60SA, previously the largest tokamak. The long-term goal of fusion research is to generate electricity; ITER's stated purpose is scientific research, and technological demonstration of a large fusion reactor, without electricity generation. ITER's goals include to achieve fusion energy gain factors (Q, the ratio of thermal output power to thermal power absorbed by the plasma) of Q = 10 momentarily and Q = 5 at steady state; to develop fusion power technologies including superconducting magnets, cryogenics, heating, control and diagnostics systems, and remote handling; to study burning plasma; to test tritium breeding; and to demonstrate the safety of a fusion plant. ITER is funded and operated by seven member parties: China, the European Union (EU), India, Japan, Russia, South Korea and the United States. In the immediate aftermath of Brexit, the United Kingdom continued to participate in ITER through the EU's Fusion for Energy (F4E) program until September 2023. Switzerland participated through Euratom and F4E until 2021, though it is poised to rejoin in 2026 following subsequent negotiations with the EU. ITER also has cooperation agreements with Australia, Canada, Kazakhstan and Thailand. Construction of the ITER complex in France started in 2013, and assembly of the tokamak began in 2020. The initial budget was close to €6 billion, but the total price of construction and operations is projected to be from €18 to €22 billion; other estimates place the total cost between $45 billion and $65 billion, though these figures are disputed by ITER. Regardless of the final cost, ITER has already been described as the most expensive science experiment of all time, the most complicated engineering project in human history, and one of the most ambitious human collaborations since the development of the International Space Station (€100 billion or $150 billion budget) and the Large Hadron Collider (€7.5 billion budget). ITER's planned successor, the EUROfusion-led DEMO, is expected to be one of the first fusion reactors to produce electricity in an experimental environment. One of the ITER objectives is a Q-value ("fusion gain") of 10. Q = 1 is called "breakeven". The best result achieved in a tokamak is 0.67 in the JET tokamak. The best result achieved for fusion in general is Q = 4.13, achieved in an inertial confinement fusion (ICF) experiment by the National Ignition Facility in April 2025. For commercial fusion power stations, engineering gain factor is important. Engineering gain factor is defined as the ratio of a plant electrical power output to electrical power input of all plant's internal systems (tokamak external heating systems, electromagnets, cryogenics plant, diagnostics and control systems, etc.). Commercial fusion plants will be designed with engineering breakeven in mind (see DEMO). Some nuclear engineers consider a Q of 100 to be required for commercial fusion power stations to be viable. ITER will not produce electricity. Producing electricity from thermal sources is a well-known process (used in many power stations) and ITER will not run with significant fusion power output continuously. Adding electricity production to ITER would raise the cost of the project and bring no value for experiments on the tokamak. The DEMO-class reactors that are planned to follow ITER are intended to demonstrate the net production of electricity. One of the primary ITER objectives is to achieve a state of "burning plasma". Burning plasma is the state of the plasma when more than 50% of the energy received for plasma heating is received from fusion reactions (not from external sources). No fusion reactors had created a burning plasma until the competing NIF fusion project reached the milestone on 8 August 2021 using inertial confinement. At higher Q values, progressively bigger parts of plasma heating power will be produced by fusion reactions. This reduces the power needed from external heating systems at high Q values. The bigger a tokamak is, the more fusion-reaction-produced energy is preserved for internal plasma heating (and the less external heating is required), which also improves its Q-value. This is how ITER plans for its tokamak reactor to scale. ITER's thermonuclear fusion reactor will use over 300 MW of electrical power to cause the plasma to absorb 50 MW of thermal power, creating 500 MW of heat from fusion for periods of 400 to 600 seconds. This would mean a ten-fold gain of plasma heating power Q , as measured by heating input to thermal output, or Q ≥ 10. The record value of the ratio of the fusion power produced in the core of a tokamak to the applied heating power entering the core Q is 1.3 in the JET Joint European Torus experiment calculated using the TRANSP code , the record for energy production using nuclear fusion is held by the National Ignition Facility reactor, which achieved a Q of 1.5 in December 2022. Beyond just heating the plasma, the total electricity consumed by the reactor and facilities will range from 110 MW up to 620 MW peak for 30-second periods during plasma operation. As a research reactor, the heat energy generated will not be converted to electricity, but simply vented. Produce a steady-state plasma with a Q value greater than 5. (Q = 1 is scientific breakeven, as defined in fusion energy gain factor.) Maintain a fusion pulse for up to 8 minutes. Develop technologies and processes needed for a fusion power station — including superconducting magnets and remote handling (maintenance by robot). Verify tritium breeding concepts. Refine neutron shield / heat conversion technology (most of the energy in the D+T fusion reaction is released in the form of fast neutrons). Experiment with burning plasma state. The objectives of the ITER project are not limited to creating the nuclear fusion device but are much broader, including building necessary technical, organizational, and logistical capabilities, skills, tools, supply chains, and culture enabling management of such megaprojects among participating countries, bootstrapping their local nuclear fusion industries. Archival material collected by Prof. McCray relating to ITER's early phase (1979–1989) can be consulted at the Historical Archives of the European Union in Florence "ITER Talks (1): Introduction to ITER" video (53:00) at YouTube, by ITER Organization, July 23, 2021. The roles of the Host and the non-Host for the ITER Project. June 2005 The broader approach agreement with Japan. Fusion Electricity – A roadmap to the realisation of fusion energy EFDA 2012 – 8 missions, ITER, project plan with dependencies, ...
Text derived from https://en.wikipedia.org/w/index.php?oldid=1378892686 under CC BY-SA 4.0; modifications have been made.