JDS Azuma
JDS Azuma (ATS-4201) was a training support ship of Japan Maritime Self-Defense Force.
≈ 1 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
JDS Azuma (ATS-4201) was a training support ship of Japan Maritime Self-Defense Force. JS Kurobe was built in 1989 for the purpose of training that could not properly supported by Azuma 's equipment, and so she was removed from the register in 1999 when the new training ship Tenryu was built.
Construction and career
Azuma was laid down on 13 July 1968 at Maizuru Heavy Industries, Maizuru and launched on 14 April 1969. The ship was commissioned on 26 November 1969. Reorganized into a ship under the direct control of the escort fleet on 24 June 1994.
Removed from the register on 28 May 1999. During the commissioning period of about 30 years, she engaged in a total of 1317 training support missions, including a total range of about 624,000 nautical miles (about 29 laps of the earth), 504 firebees, 344 chakas, and 469 low-speed drones.
Text derived from https://en.wikipedia.org/w/index.php?oldid=1327649712 under CC BY-SA 4.0; modifications have been made.