The BP Refinery (Kent) was an oil refinery on the Isle of Grain in Kent. It was commissioned in 1953 and had a maximum processing capacity of of crude oil per year. It was decommissioned in August 1982.

Background

The oil industry was first established on the Isle of Grain in 19081 when, in association with the naval dockyard at Sheerness, the Admiralty constructed an oil storage and ship refuelling depot on the Medway. In 1923 the Medway Oil and Storage Company (MOSCO) constructed an oil refinery and tank farm adjacent to the Admiralty site.

MOSCO was absorbed into the Anglo-Persian Oil Company (APOC) in 1932 after which oil refining at Grain ceased. (APOC was renamed the Anglo-Iranian Oil Company in 1935, then British Petroleum Company in 1954). Further up the Medway at Kingsnorth, Berry Wiggins and Company started constructing an oil refinery and tank farm in 1930.

This refinery was expanded both before and after the Second World War, and finally closed in 1977. In 1943 a spur pipeline (T/D/G) was constructed to the Isle of Grain from off the Thames to Dungeness pipeline (T/D) which fuelled DUMBO, part of Operation Pluto. The spur line to Grain provided access to the Admiralty oil storage facility.

The BP Refinery (Kent) was one of several oil refineries – including Esso Fawley on Southampton Water – which were built in the post-war period for the production of refined petroleum products. These realised the UK government's strategy to save dollars by encouraging the refining of Middle Eastern crude oil, and to keep within the UK the added value of such refined products.

The post-war refineries changed Britain's coastal geography: they required large amounts of land and were built in previously rural coastal areas. The refineries also provided feed-stock for the land-hungry and intrusive petrochemical industry often built adjacent to refineries.

There was a tension between these rural developments and the government policy of supporting industrial development in urban areas where there was high unemployment. Despite reservations about these developments, the UK government approved the Kent and Fawley refinery plans in 1947, although the developments took some years to be built.

Construction

The Anglo-Iranian Oil Company commenced the construction of the Kent Refinery, unofficially known as the Grain Refinery, in 1950. The contracts were managed by the Badger Company, with construction carried out by McAlpine and Wimpey.

Pre-construction groundworks were carried out on the southern part of the site, including the infilling of several disused watercourses, namely Wells Fleet, Littlechalk Fleet, and most of Greatchalk Fleet. This work involved the use of one million cubic yards (765,000 m³) of soil, sourced from higher ground to the north of the site.

To the south-east of the site, the ground level was raised by up to six feet (1.8 m) using compacted sand dredged from the seabed. Six thousand concrete piles were driven to provide foundations for the major plant and equipment on the marshy ground. A bay on the Saltpan Reach of the River Medway was enclosed to serve as a storage reservoir for cooling water, filled by the incoming tide.

A water channel, three-quarters of a mile (1.2 km) in length (TQ865739 to TQ868749) was constructed to convey water from the reservoir across the site to the refinery pump house, from where it could be distributed around the site for process cooling. The channel had a volumetric capacity of 16 million gallons (73,000 m 3 ).

The refinery's cooling water circulation system had a capacity of 3.5 million gallons/hour (15,900 m 3 /hour). Initially, five new jetties were constructed on the River Medway, with the capacity to accommodate vessels of up to 32,000 tonnes. A deep-water channel was dredged to enable ships to reach the jetties from the Thames Estuary.

This channel, which extended for 4 miles (6.4 km) and was 800 feet (240 m) wide, was excavated to provide a minimum water depth of 28 feet (8.5 m) at low tide. The initial phase of construction entailed the use of: 37,000 tonnes of concrete 119,000 tonnes of steel 14 million bricks of piping At its peak the construction activity on the site employed 8,000 workers; 1,500 were housed in a construction camp at Wallend in the centre of the site.

In 1952 the Thames to Grain (T/G) pipeline was recommissioned to carry refined fuel from the BP Kent refinery to the Walton storage depot. The movement of fuel was now in the opposite direction to that originally designed. This led to the need to install new pumping units and to construct a new pump-station at Stoke (TQ851757), located close to the Isle of Grain refinery.

The first phase of construction cost around £40m.

Production

The first tanker containing 27,000 tonnes of crude oil from the Middle East arrived at the refinery in October 1952. The initial phase of the refinery was commissioned in several stages: Stage 1 – the No. 1 crude distillation unit plus the product sweetening and blending plants, in February 1953. Stage 2 – the catalytic cracking unit, and the SO 2 plant for kerosene, in October 1953.

Stage 3 – the lubricating oils facility, in Summer 1954. Stage 4 – No. 1 catalytic reformer, in Spring 1955. The East Coast floods of January 1953 inundated the refinery site, covering it in water and mud.

The flood displaced some of the pipes on the pipe tracks. Nevertheless, the refinery went on-stream three weeks later in February 1953. The refinery had an initial throughput capacity of four million tonnes per year of crude oil.

Crude oil mainly came from the Middle East with smaller amounts from Libya, Nigeria and South America. On 5 April 1955, the site was visited by the Queen and the Duke of Edinburgh. Following the initial phase of commissioning the refining capacity was increased and new processes were planned, constructed and commissioned over the period 1956–60.

A desulphurising plant was commissioned in Autumn 1957. The H 2 S absorption towers, hydrofiner, and sulphur recovery plants were commissioned in Autumn 1957. The No. 2 Crude oil distillation unit and stabilisers were commissioned at the end of 1957.

The availability of suitable feed-stock on the site lead to the construction of several facilities adjacent to the refinery. The South Eastern Gas Board SEGAS constructed a gas-from-oil plant in 1957.

The gasification plant had a projected capacity of 80 million cubic feet, gas mains were laid from the Isle of Grain to Strood to feed gas into a trunk main system to provide gas south of the Thames from Sittingbourne in the east to as far as Guildford in the west. A petrochemical plant to manufacture synthetic fibres, a joint venture by BP and California Chemicals known as BP-California Ltd, was planned and constructed from 1960.

Closure

The rising price of oil in the 1970s resulted in a slump in consumption, which meant there was a considerable excess of refining capacity throughout Europe. In August 1981 BP Oil announced that the BP Kent refinery would close in 1982 with the loss of 1,670 workers plus another 1,000 construction jobs in the area. The Kent refinery closed on 27 August 1982.

The oil storage facility continued for some years; the last oil flow by rail from Grain ran in 1999. After closure some of the western part of the site was developed by British Gas as a liquefied natural gas plant Grain LNG Terminal and some as London Thamesport container terminal.

Structure

At its maximum extent the refinery and its tank farm covered a site of four square kilometres (400 hectares). The western boundary of the site was defined by the Yantlet Creek.

The main structures on the site included: a large administration office building. of roads within the refinery and tank farm complex. four rail sidings where refined oil products were loaded into rail tanks through overhead gantries and piping. The rail loading facility was towards the end of the Hoo to Grain branch of the North Kent railway. nine jetties to take large oil tankers and three smaller jetties. the crude distillation column was high. liquefied Petroleum Gases (LPG) were stored in Horton spheres. the crude oil tankage was to the north east of the site. the fuel oil and products tankage was to the south of the site. some of the motor spirit tankage was underground to the north east of the site.

The oil-fired Grain Power Station was constructed adjacent to the refinery in the late 1970s to use fuel oil from the refinery. The refinery was accessed by road via the A228 and B2001.

See also

Historic England Archive Fawley Refinery British Petroleum

Graces Guides Britain From Above Historic England

Text derived from https://en.wikipedia.org/w/index.php?oldid=1362776427 under CC BY-SA 4.0; modifications have been made.

References

  1. ↩Wikipedia “Kent Refinery” revision 1362776427 · retrieved 2026-10-20 date of establishment (×1) · confidence 0.95 revision URL