Kurobe Dam

Uses your system voice; voice and rate in settings.

Snapshot

≈ 5 min read

Names in other languages

No names in other languages are held for this entry yet.

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The , or , is a high variable-radius arch dam on the Kurobe River in Toyama Prefecture, Japan. The tallest dam in Japan, it supports the 335 MW Kurobe No. 4 Hydropower Plant and is owned by Kansai Electric Power Company. It was constructed between 1956 and 1963 at a cost of 51.3 billion yen. The project had taken the lives of 171 people by its completion.

The , or , is a high variable-radius arch dam on the Kurobe River in Toyama Prefecture, Japan. The tallest dam in Japan, it supports the 335 MW Kurobe No. 4 Hydropower Plant and is owned by Kansai Electric Power Company. It was constructed between 1956 and 1963 at a cost of 51.3 billion yen. The project had taken the lives of 171 people by its completion.

History

In 1951, the Kansai Electric Power Company was formed to provide electric power for the Kansai region of Japan. Shortly after their formation, the area suffered from drought, which caused power rationing. The drought, along with the rapid growth of post–World War II Japan, pushed the company to increase their generating capacity.

After a series of geological and hydrological studies of the Kurobe River and Gorge, it was announced in late 1955 that the Kurobe Dam would be constructed. In July 1956, construction on the dam began. Problems quickly arose while transporting material to the construction site as only one small railway existed through the narrow gorge.

Kansai decided to construct the Kanden Tunnel under Mount Akazawa that could efficiently bring supplies from Ōmachi eastward towards the construction site. The tunnel's construction proved an arduous task, as a large fracture zone in the rock was encountered, which took seven months to repair.

In September 1959, the first concrete for the dam was placed and by October next year, the reservoir had begun to fill. The Kurobe No. 4 power station was built completely underground to protect it from the avalanches common in the gorge and also for nature-conservation purposes. By January 1961, two of Kurobe No. 4's Pelton turbines had begun operation at an initial capacity of 154 MW.

In August 1962, the third turbine was in operation, and by June 1963, the dam was complete at a final cost of ¥ 51.3 billion ($142.5 million (1963)). In 1973, a fourth turbine was installed and became operational, bringing the power station's production capacity to 335 MW. The fourth turbine cost ¥ 1.4 billion yen ($5 million (1973)).

The first two turbines were manufactured by Voith and the last two by Japan's Hitachi. The dam initiated the development of Japan's first 275kV transmission system as well, which allowed the transfer of electricity over greater distances.

Specifications

The Kurobe Dam is a long, high, variable-radius (dome) arch dam. The dam is wide at its base, wide at its crest, and contains of concrete. The dam is flanked and supported by two "wing" dams which form the abutments; the one on the left bank is long and the right is .

The dam withholds a reservoir with a capacity of of which is live (active or "useful") storage. The reservoir also has a catchment area of and surface area of . The dam's spillway is on its crest and contains 10 wide uncontrolled openings with a maximum discharge capacity of .

Three other openings exist in the dam's orifice, which consist of diameter pipes, two of which can discharge a maximum of each and the third . The dam's crest elevation is above sea level, while the reservoir's normal operating level is and low level is considered .

The dam's power station, Kurobe No. 4, is located underground and contains four generators which are powered by Pelton turbines for a total installed capacity of 335 MW and average annual generation of 1 billion kWh. The power station is wide, high, and long.

The penstock serving water to the power station is long and utilizes a maximum effective hydraulic head of while transferring a maximum of to the turbines. The plant's surge chamber is long and high.

Access

The Kurobe Dam is the most popular hydropower site in Japan and, between late June and mid-October, water is released from its spillway for onlookers. The surrounding Kurobe Gorge is popular as well and is accessible by the Tateyama Kurobe Alpine Route. Starting from Toyama Station, visitors can take a combination of trains, cable cars, buses, and walking to access the dam.

The whole trip from Toyama Station takes roughly four hours to complete one-way, and costs around 10,000 yen ($66.68 USD) in transportation fees. Various accommodations are available in Murodo area as well as near Tateyama Station, for those too tired to make the trip back down into Toyama City.

Text derived from https://en.wikipedia.org/w/index.php?oldid=1364921463 under CC BY-SA 4.0; modifications have been made.

Sources cited in this revision

7 named source(s) extracted from the cited revision. A source with no author is shown by its publication; nothing is invented.